Loading...
HomeMy WebLinkAbout014 email from city engineer_regarding drive approach width Tim Staub From: Alicia Paz-Solis <apazsolis@BOZEMAN.NET> Sent: Monday, October 25, 2021 1:44 PM To: Tim Staub Subject: RE: Bozeman Design Center- 21375 Attachments: ATT00001.txt;ATT00002.htm Hi Tim, The proposed commercial driveway approach is acceptable. Please consider the comment addressed and include this email with future revisions. Thank you, City of Bozeman 11' Alicia Paz-Solis, E'; I Engineering Department O: 406.582.2976 apazsolis(cD-bozeman.net From:Tim Staub<tstaub@chengineers.com> Sent: Monday, October 25, 2021 11:46 AM To:Alicia Paz-Solis<apazsolis@BOZEMAN.NET> Subject: Bozeman Design Center-21375 CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Alicia, I have a question on your last comment of the October 22 review of Bozeman Design Center. You said that the access width exceeds the maximum. See attached. It looks like our concept plan had not labeled that area very well. I have updated it and it shows that our access width as proposed is less than 35'. Will this work?Or is there another reason why it needs to be narrower at the approach width and flare out to accommodate the unloading zone? Thanks, Tim Staub, P.E. Project Engineer www.chengineers.com 1