Loading...
HomeMy WebLinkAbout012 Sanitary Sewer calculation C � H Engineering and Surveying Inc. 1091 Stanaridga Orivo•Bozoman,MT 59718 Phone(406)5B7-1115•Fax(406)587-9768 uwvw.ultangineurc.uum•IW000liunghuuru.carn Bozeman Design Center Site Plan - Lot 1, Block 2 Ferguson Farm Subdivision Sanitary Sewer Flow Calculations Average daily flow calculation *Wastewater Wastewater Land Use Category Gross area(sf) flow(gpd/sf) flow(gpd) Retail (and warehouse) 7630 0.013 99 Office 30299 0.029 879 Avg. Daily Flow Rate 1 978 *This figure is based on analysis performed by C&H Engineering for the Ferguson Farm II PUD Subdivision project. It is based on actual water meter data of businesses in Bozeman for winter months of 2018-2019. Peaking Factor Calculation population (entire subdivision build-out)* 751 persons peaking factor* 3.88 Average Daily Flow Rate 978 gal/day Peak Wastewater Flow Rate 3794 gal/day Peak Wastewater Flow Rate 2.6 gal/min Peak Wastewater Flow Rate 0.0059 cfs *Peaking factor and entire subdivision population obtained from C&H Engineering sewer design report for Ferguson Farm Subdivision(2013). v Ah .J