Loading...
HomeMy WebLinkAbout006 CILWR correspondence Tim Staub From: Tim Staub Sent: Thursday, December 23, 2021 12:00 PM To: 'Griffin Nielsen' Cc: 'dkirsch@chengineers.com' Subject: RE: CILWR estimate Hi Griffin, I am submitting the Bozeman Design Center site plan today without the CILWR estimate. (see below) I have included in the narrative a statement that the applicant understand they cannot receive site plan approval until the amount is certified and paid. It has been a pleasure working with you.Tomorrow is my last day at C&H. Thanks, Tim From:Tim Staub Sent: Friday, December 10, 2021 11:17 AM To: 'Griffin Nielsen' <GNielsen@BOZEMAN.NET> Subject: CILWR estimate Hi Griffin, Can you please provide a CILWR estimate for the proposed Bozeman Design Center?See attached. Please let me know if you need any more info. Concept application number is 2375. Nakeisha Lyon is the planner. Thank you, Tim Staub, P.E. Project Engineer www.chengineers.com Uncommon Dedication o Est.1994 o Civil Engineering o Geotechnical Engineering o Structural Engineering o Floodplain Delineation FC o Land Surveying o Soil&Concrete Testing Engineering and Sui-veying Inc, o Subdivision Design o Environmental Site Assessments 1091 Stonendge(rive+Bwerran,MT 59718 o Water System Design o Site Grading&Drainage Plans Fhara erq ers.orn-•fo I4C)6)58T97neersx m o Septic System Design o Storm Water Plans(SWPPP) mrvct5er�neeas.com�infoVc9xrtipineere.com "This message and/or attachment contains confidential information. Distribution of this information must be only to those of C&H Engineering and Surveying, Inc employees or individuals contractually approved to receive this information. If you are not the addressee and/or are not authorized Lo receive this for the addressee, you must not use, copy, disclose, forward, print or tare any action based on this message or any information herein. If you have received this message in error, please advise the sender immediately by reply e-mail and del-ete this message. " 1