HomeMy WebLinkAbout005 TIS Waiver Tim Staub
From: Alicia Paz-Solis <apazsolis@BOZEMAN.NET>
Sent: Tuesday, December 14, 2021 10:24 AM
To: Tim Staub
Cc: Drew Kirsch
Subject: RE: TIS waiver- BDC
Hello Tim,
Based on the reported peak hour trips (below), a Traffic Impact Study (TIS)for the Bozeman Design Center is not
required. Please provide this email with future revisions.
Thank you,
City of Bozeman MT
Alicia Paz-Solis, El I Engineering Department
DL: 406.582.2976
apazsolis@bozeman.net
Pronouns: she/her/hers
-----Original Message-----
From:Tim Staub<tstaub@chengineers.com>
Sent: Monday, December 13, 2021 11:54 AM
To: Alicia Paz-Solis<apazsolis@BOZEMAN.NET>
Cc: Drew Kirsch <dkirsch@chengineers.com>
Subject: FW:TIS waiver- BDC
CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Hi Alicia,
I am getting together the last pieces for the Bozeman Design Center site plan application. Can you please provide me
with a waiver of TIS?See message below from our traffic consultant.There are fewer than 100 peak hour trips
generated.
Thanks,
Tim
-----Original Message-----
From: bob@abelintraffic.com <bob@abelintraffic.com>
Sent: Monday, December 13, 2021 11:46 AM
To:Tim Staub<tstaub@chengineers.com>
Subject: Re:TIS waiver- BDC
1
Tim, I ran the numbers for the Bozeman Design Center using a mix of Industrial Park#130 and Office Park#750 to cover
a variety of uses.
Running the numbers for both floors combined I get 45AM,40PM, and 336 total daily trips for the building. Let me
know if you have any questions.
Bob
Quoting Tim Staub<tstaub@chengineers.com>:
> I realized I didn't tell you what tenant C-E is.That is office.
>-Tim
>-----Original Message-----
> From:Tim Staub
>Sent: Monday, December 13, 2021 8:37 AM
>To: bob@abelintraffic.com
>Subject: RE:TIS waiver- BDC
> See attached.This is Bozeman Design Center.The reason why you re-did
>those internal capture calcs a couple weeks ago.
>-Tim
>-----Original Message-----
> From: bob@abelintraffic.com <bob@abelintraffic.com>
>Sent: Sunday, December 12, 2021 12:21 PM
>To:Tim Staub<tstaub@chengineers.com>
>Subject: Re:TIS waiver- BDC
>Thanks Tim, what general types of commercial land uses are we looking
>at within the building?
>Quoting Tim Staub<tstaub@chengineers.com>:
>> Hi Bob,
>> I need your expertise in traffic generation calcs for the Bozeman
>> Design Center. I just need to prove to the City we do not need a
>>Traffic Impact Study. See attached plan with areas. Please let me
>> know if you need any more info.
>>Thanks,
>>Tim Staub, P.E.
>> Project Engineer
>> https://urldefense.proofpoint.com/v2/url?u=http-3A_www.chengineers.c
»o
>> m&d=DwICaQ&c=euGZstcaTDllvimEN8b7jXrwgOf-v5A_CdpgnVfiiMM&r=OWUvaUoDhU
>>G
>> pGZxlmmayXfiAcDdiuYSOg9xaGHylxTs&m=siT96VMEJPietFvjCeEITp7lFg1Lr381TN
2