Loading...
HomeMy WebLinkAbout005 TIS Waiver Tim Staub From: Alicia Paz-Solis <apazsolis@BOZEMAN.NET> Sent: Tuesday, December 14, 2021 10:24 AM To: Tim Staub Cc: Drew Kirsch Subject: RE: TIS waiver- BDC Hello Tim, Based on the reported peak hour trips (below), a Traffic Impact Study (TIS)for the Bozeman Design Center is not required. Please provide this email with future revisions. Thank you, City of Bozeman MT Alicia Paz-Solis, El I Engineering Department DL: 406.582.2976 apazsolis@bozeman.net Pronouns: she/her/hers -----Original Message----- From:Tim Staub<tstaub@chengineers.com> Sent: Monday, December 13, 2021 11:54 AM To: Alicia Paz-Solis<apazsolis@BOZEMAN.NET> Cc: Drew Kirsch <dkirsch@chengineers.com> Subject: FW:TIS waiver- BDC CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Alicia, I am getting together the last pieces for the Bozeman Design Center site plan application. Can you please provide me with a waiver of TIS?See message below from our traffic consultant.There are fewer than 100 peak hour trips generated. Thanks, Tim -----Original Message----- From: bob@abelintraffic.com <bob@abelintraffic.com> Sent: Monday, December 13, 2021 11:46 AM To:Tim Staub<tstaub@chengineers.com> Subject: Re:TIS waiver- BDC 1 Tim, I ran the numbers for the Bozeman Design Center using a mix of Industrial Park#130 and Office Park#750 to cover a variety of uses. Running the numbers for both floors combined I get 45AM,40PM, and 336 total daily trips for the building. Let me know if you have any questions. Bob Quoting Tim Staub<tstaub@chengineers.com>: > I realized I didn't tell you what tenant C-E is.That is office. >-Tim >-----Original Message----- > From:Tim Staub >Sent: Monday, December 13, 2021 8:37 AM >To: bob@abelintraffic.com >Subject: RE:TIS waiver- BDC > See attached.This is Bozeman Design Center.The reason why you re-did >those internal capture calcs a couple weeks ago. >-Tim >-----Original Message----- > From: bob@abelintraffic.com <bob@abelintraffic.com> >Sent: Sunday, December 12, 2021 12:21 PM >To:Tim Staub<tstaub@chengineers.com> >Subject: Re:TIS waiver- BDC >Thanks Tim, what general types of commercial land uses are we looking >at within the building? >Quoting Tim Staub<tstaub@chengineers.com>: >> Hi Bob, >> I need your expertise in traffic generation calcs for the Bozeman >> Design Center. I just need to prove to the City we do not need a >>Traffic Impact Study. See attached plan with areas. Please let me >> know if you need any more info. >>Thanks, >>Tim Staub, P.E. >> Project Engineer >> https://urldefense.proofpoint.com/v2/url?u=http-3A_www.chengineers.c »o >> m&d=DwICaQ&c=euGZstcaTDllvimEN8b7jXrwgOf-v5A_CdpgnVfiiMM&r=OWUvaUoDhU >>G >> pGZxlmmayXfiAcDdiuYSOg9xaGHylxTs&m=siT96VMEJPietFvjCeEITp7lFg1Lr381TN 2