Loading...
HomeMy WebLinkAbout021 Pedestrian Circulation PlanUPDNELEV:5036.00'ELEV:5038.00'LOADING DOCKELEV:5038.00'ELEV:5038.00'ELEV:5036.00'FIRE TURNAROUNDAND LOADING ZONEFOR DELIVERIES ANDSOLID WASTEWESTBUILDINGEASTBUILDINGWEST PATIOAREAEAST PATIO AREASTREET VISION TRIANGLEDESIGNED ACCORDING TO38.400.100 BMCENTRANCEENTRANCE LINED ASPHALTCROSSWALK W/ CONTRASTINGWARNING SURFACELINED ASPHALTCROSSWALK W/ WARNING SURFACESLITTLE HORSE DR.SOU T H 3 r d A V E P E A C E P I P E D R .ADA WALKWAYCONTRACTORTOVERIFY GRADESEE NOTE 3THIS SHEETMIDDLE CREEK DITCHDELINEATED WETLANDPARKING LOT18,544 sq. ft.32.4% of total siteADD 2' OF ASPHALT TOIMPROVEEXISTING SHOULDERAS A BIKE LANEPROPOSED TRAIL EXTENSION TO SUNDANCE SPRINGS TRAILMINIMUM 5' WIDTH3.5' FROMWATERCOURSESETBACK TO NEARESTSTRUCTUREWEST RETENTIONPOND 2469 c.f.PROP O S E D L A N D S C A P E B E R M EAST RETENTIONPOND 1045 c.f.3' MIN.3' MIN.EXISTINGSIDEWALK10' REARSETBACK10' LANDSCAPEBLOCK FRONTAGESETBACKEXISTINGWALKING & BIKE PATHPROPOSED CRUSHEDGRAVEL TRAIL EXTENSION TO ELLISVIEW LOOP & SOUTH 3rdAVEPROPOSEDSTREETLAMP10' SIDE SETBACK10'SIDESETBACKADA WALKWAYCONTRACTOR TOVERIFY GRADESEE NOTE 3 THISSHEETLEGENDSURVEYED PARCEL BOUNDARYPROPERTY LINESPEDESTRIAN ROUTEVEHICLE FLOWADA COMPLIANT PARKING SPACESEXISTING TRAILEXISTING SIDEWALKPROPOSED TRAILPROPOSED SIDEWALK/CONCRETE AREAPROPOSED ADA ACCESSIBLE SIDEWALK ROUTEADDED ASPHALT FOR BIKE LANENOTES:1.SIDEWALKS ADJACENT TO PERPENDICULAR PARKING ARE 7'WIDE (38.520.040.D.2).2.CROSSWALKS ARE PROVIDED WHERE REQUIRED AT AMAXIMUM SPACING OF 200 FEET. CROSSWALKS MUSTCONTAIN CONTRASTING MATERIAL AND/OR PATTERNS(38.520.030.C)3.ACCESSIBLE SIDEWALK ROUTES MUST HAVE RUNNINGSLOPES NO GREATER THAN 1:20 AND CROSS SLOPES NOTGREATER THAN 1:48 (U.S. ACCESS BOARD TECHNICAL GUIDESEC. 402-403). DETECTABLE SURFACES MUST BE PRESENTON CURB RAMPS. SEE SHEET C-501 FOR STANDARD DETAILS.4.20 BICYCLE PARKING SPACES HAVE BEEN PROVIDED..BICYCLE PARKING IS WITHIN 50' OF BOTH BUILDINGS ON ACONCRETE PAD WITH ACCESS TO SIDEWALKS AND TRAILIMPROVEMENTS (SEC. 38.540.050.4). SEE SHEET C-507 FORBICYCLE RACK DETAILS.5.EXISTING AND PROPOSED TRAILS PROVIDE CONTINUOUSPEDESTRIAN ACCESSIBILITY BETWEEN BUILDINGS, PARKINGAREAS, AND ADJACENT NEIGHBORHOOD TRAIL NETWORKS.6.CURB RAMPS ADJACENT TO ADA PARKING STALLS MEET ADAACCESSIBILITY REQUIREMENTS. SEE SHEET C-502 FORDETAILS.07-25-2022SCALE: 1"=20'20400103050© 2022 SYNERGY ENGINEERING AND KONSULTING (SEAK). THISDRAWING AND ASSOCIATED ELECTRONIC FILES ARE THE WORKPRODUCT OF SEAK AND REUSE OF FILES IS BY LIMITEDPERMISSION FROM SEAK.SHEET Date: Drawn By: Checked By: Revisions: SUNDANCE SPRINGS SUBDIVISION PHASE 1B, COMM LOT 2 BOZEMAN, MT 59715 S25, T2S, R5E 5520 Sourdough Rd., Bozeman, MT 59715 Phone: (406) 925-0590 Filename:SUNDANCE SPRINGS 6.18.DWG Sheet:C-104 PEDS Location:F:\DROPBOX FILES\SEAK DROPBOX\SEAK PROJECTS\SUNDANCE SPRINGS\CAD Plotted:2/24/2023 Plotted by:MARLENE 2/23/2023 APR MS 6.18 3731 Equestrian Lane, Suite 102., Bozeman, MT 59718 Phone: (406) 624-6137 SYNERGY ENGINEERING AND KONSULTING C-104PEDESTRIAN PLAN