HomeMy WebLinkAbout011 Stormwater Design ReportSS62
STORM DRAINAGE PLAN
Sundance Springs Comm Lot 2
Synergy Engineering and Konsulting, Inc
3731 Equestrian Lane, STE 102, Bozeman, MT 59718/ 406-624-6137 /marlene@seakmt.com
Date: January 10, 2022
REVISED July 27, 2022
Prepared for: City of Bozeman
Sundance Springs Subdivision Phase 1B
Sundance Springs
COMM LOT 2 July 13, 2022
1
Table of Contents
1. GENERAL LOCATION AND DESCRIPTION ........................................................................................... 2
A. LOCATION ....................................................................................................................................... 2
B. DESCRIPTION ............................................................................................................................... 3
2. DRAINAGE DESIGN ........................................................................................................................... 5
A. RUNOFF COEFFICIENTS ................................................................................................................ 5
B. TIME OF CONCENTRATION (Tc) ..................................................................................................... 6
C. STORM INTENSITY (i).................................................................................................................... 6
D. ESTIMATION OF PEAK RUNOFF RATE (RATIONAL METHOD) ......................................................... 6
E. RUNOFF VOLUME, MODIFIED RATIONAL METHOD....................................................................... 6
F. DRAINAGE FACILITIES ................................................................................................................... 7
G. INITIAL STORM WATER FACILITY CALCULATIONS .......................................................................... 7
3. FACILITY MAINTENANCE PLAN ......................................................................................................... 8
A. OWNERSHIP OF FACILITY ............................................................................................................. 8
2. SCHEULE FOR MAINTENANCE ...................................................................................................... 8
3. RESPONSIBLE PARTY .................................................................................................................... 8
4. CERTIFICATION ................................................................................................................................ 8
Sundance Springs
COMM LOT 2 July 13, 2022
2
1. GENERAL LOCATION AND DESCRIPTION
This Storm Drainage Plan is prepared for the 2-building commercial project proposed within the
Sundance Springs Subdivision Phase 1B, Plat J-257. Total acreage is 1.31 acres. The project
includes paved access and parking, gravel paths connecting to neighborhood trail systems, two
buildings with patios and landscaped areas.
A. LOCATION
The Sundance Springs Comm Lot 2 project is on 1.31 acres in Bozeman, MT. The closest
intersection to the site is South 3rd Ave and Little Horse Drive. The site is bordered on the north
and east by open space, Little Horse Drive on the south and South 3rd Ave on the west. The site
is currently undeveloped.
1. Owner/Developer: 406 Coal Blowers LLC
2. B-1 Zoning
3. Township 2S, Range 5E, Section 25
4. Access provided by Little Horse Drive
Figure 1: Sundance Springs Comm Lot 2 Location Map
Sundance Springs
COMM LOT 2 July 13, 2022
3
B. DESCRIPTION
In-situ Conditions: The site is mostly covered by short herbaceous grasses.
The drainage in the general area flows in a north-northeasterly direction. Surveyed ground
elevation at the site is between 5032’-5040’ (NAD 88 vertical datum). The site is adjacent to the
Middle Creek Ditch and the topography of the site slopes gently toward the ditch in an easterly
direction.
Existing conditions indicate the property drains as one onsite basin. There is no indication of
channelized surface flow within lot boundaries. The longest onsite flow path, based on
surveyed ground contours, is shown in Figure 2 (below).
Groundwater Elevation: Test pits were excavated for the purpose of geotechnical assessment
of the soils pertaining to building foundation designs by Allied Engineering in 2019. A
monitoring pipe was installed that is approximately nine feet deep. Groundwater depth was
recorded at 6.5 feet below ground surface on August 21, 2019 and 4.7 feet below ground
surface on September 24, 2019. The monitoring pipe was checked for ground water in the
Spring of 2020 and again in the Spring of 2021 and Spring and Summer of 2022 after an
unusually wet weather cycle. No groundwater was found in the monitoring well during any of
these site visits. Depth to ground water is estimated at between 6 and greater than 9 feet.
Seasonal high groundwater between 4.5-6 feet is possible and most likely due to localized
irrigation effects. Interpolated groundwater elevation at the site is approximately 5020’ (Slagle
Contours, Gallatin County GIS).
Because high groundwater conditions are common throughout the Gallatin Valley, precautions
will be taken to ensure ductile iron water mains are protected against corrosion effects.
Stormwater retention ponds have been designed to a depth of 2 feet below ground surface to
ensure that groundwater is not encountered in those ponds.
Sundance Springs
COMM LOT 2 July 13, 2022
4
Figure 2: Sundance Springs Comm Lot 2 existing conditions.
Proposed Conditions:
• Asphalt access drive and parking 0.46 acres
• Two commercial buildings, sidewalks, paths, and patios 0.31 acres
• Landscape and natural scape areas 0.54 acres
• Two retention ponds to capture, infiltrate, and/or evapotranspire runoff.
Sundance Springs
COMM LOT 2 July 13, 2022
5
Figure 3: Sundance Springs Comm Lot 2 proposed conditions.
Proposed grading contours and retention ponds are shown in figure 3. The four proposed onsite
drainage sub-basins are outlined in red and the longest flow paths through each sub-basin are shown in
blue.
2. DRAINAGE DESIGN
Drainage design is based on the requirements in the City of Bozeman Design Standards and
Specifications Policy March 2004 (DSSP). DSSP requires that retention ponds be sized based on a 10-
year, 2-hour storm intensity.
Pre-development, the entire site drains as one basin. Proposed grading and development break the
lot into four separate drainage basins. The parking lot and building areas are divided into two basins
that terminate in proposed retention basins. Basins 3 and 4 are undeveloped and/or landscaped
areas that drain office. Basin 3 is entirely within the watercourse setback and will be undeveloped.
Basin 4 is separated from the rest of the site by a proposed berm and will be landscaped. See Figure
3.
A. RUNOFF COEFFICIENTS
USDA Hydrology Module 206D, Table 1 Value of Runoff Coefficients.
a. Pre-Development: Flat Clay and Silt Loam Pasture = 0.36
b. Developed: Asphalt Drive and Parking = 0.70
Commercial Buildings (Roofs, Walkways) = 0.75
Lawn, Landscape = 0.15
c. Developed condition weighted C-coefficient:
Sundance Springs
COMM LOT 2 July 13, 2022
6
a. Asphalt drive and parking, 0.46 acres, C = 0.70
b. Commercial buildings roofs, walkways, 0.31 acres, C = 0.75
c. Lawn, landscape, and natural areas, 0.54 acres, C = 0.15
B. TIME OF CONCENTRATION (Tc)
Peak runoff occurs when the duration of the storm equals the time of concentration (calculations
attached).
a. Pre-development Tc: 15.2 minutes
b. Developed Conditions Basin 1 Tc: 14.2 minutes
c. Developed Conditions Basin 2 Tc: 10.6 minutes
d. Developed Conditions Basin 3 Tc: 8.1 minutes
e. Developed Conditions Basin 4 Tc: 2.5 minutes
C. STORM INTENSITY (i)
Duration is assumed to be equal to the time of concentration. Bozeman DSSP Figures 1-2, 1-3 were
used to determine rainfall intensity for the design storm. As storm duration increases, intensity
decreases.
a. Pre-development design storm intensity: 1.56 in/hr
b. Developed Conditions Basin 1 design storm intensity: 1.63 in/hr
c. Developed Conditions Basin 2 design storm intensity: 1.97 in/hr
d. Developed Conditions Basin 3 design storm intensity: 2.36 in/hr
e. Developed Conditions Basin 4 design storm intensity: 5 in/hr
D. ESTIMATION OF PEAK RUNOFF RATE (RATIONAL METHOD)
Rational Formula, Q = CIA (Calculations attached).
a. Pre-development peak runoff rate: 0.74 cfs
b. Developed Conditions Basin 1 peak runoff rate: 0.51 cfs
c. Developed Conditions Basin 2 peak runoff rate: 0.63 cfs
d. Developed Conditions Basin peak runoff rate: 0.12 cfs
e. Developed Conditions Basin 4 peak runoff rate: 0.06 cfs
E. RUNOFF VOLUME, MODIFIED RATIONAL METHOD
Autodesk Storm and Sanitary Analysis (SSA) was used to compute modified rational method outputs for
the pre- and post-development drainage conditions. SSA output reports are attached.
1. Bozeman DSSP requires that the modified rational method approach be used to compute runoff
volume for storm durations equal to or greater than the time of concentration.
2. Maximum Runoff Rates (SSA outputs, modified rational method)
a. Pre-development: 0.19 cfs
b. Developed Conditions Basin 1: 0.13 cfs
c. Developed Conditions Basin 2: 0.13 cfs
Sundance Springs
COMM LOT 2 July 13, 2022
7
d. Developed Conditions Basin 3: 0.02 cfs
e. Developed Conditions Basin 4: 0.01 cfs
3. Total runoff volume is computed by multiplying the duration of the storm by the runoff rate.
Bozeman DSSP specifies a 2-hour design storm with a return interval of 10 years for commercial
development.
a. Pre-development Runoff Volume: 1368 cf
b. Developed Conditions Basin 1 Runoff Volume: 936 cf
c. Developed Conditions Basin 2 Runoff Volume: 936 cf
d. Developed Conditions Basin 3 Runoff Volume: 144 cf
e. Developed Conditions Basin 4 Runoff Volume: 72 cf :
f. Entire Developed Site Runoff Volume: 2088 cf
g. Increase in Runoff Volume Post-Development: 2088 – 1368 = 720 cf
F. DRAINAGE FACILITIES
1. The existing site slopes to the northeast. Finished grading shall direct drainage to the east. Two
retention basins are proposed adjacent to the parking lot as shown in Figure 3. While Basins 3
and 4 do not have retention facilities, these portions of the site will remain undeveloped and
will experience no increase in runoff.
The west retention pond shall be 44 feet wide and 63 feet in length. It will be south of the West
Building entrance. Side slopes shall be 4:1 to a maximum basin depth of 2 feet. West retention
pond capacity calculated by average end area area is 2,469 cf. The east retention pond shall be
25 feet wide and 47 feet in length. Side slopes shall be 4:1 to a maximum basin depth of 2 feet.
Pond capacity calculated by average end area is 1,045 cf. Both retention ponds are large enough
to retain the entirety of the estimated runoff from a 10-year storm event for their catchment
subbasins. Overall retention volume is 3,514 cubic feet.
Any overflow during large storms will exit the retention ponds through a riprap channel into
landscaped areas following historic flow patterns to Middle Creek Ditch. Runoff is not expected
to negatively impact surface water quality of Middle Creek Ditch, which already serves as a
receiving water for outfall from the storm sewer infrastructure in the adjacent neighborhood.
The basins shall be grass lined and complement landscaping of the site.
G. INITIAL STORM WATER FACILITY CALCULATIONS
Bozeman DSSP and DEQ-8 require any project greater or equal to one acre to provide facilities to retain
and/or infiltrate the first 0.5 inches of rainfall from a 24-hour storm event preceded by 48 hours of no
measurable precipitation. Calculations below follow guidance in DEQ-8 Appendix C.
1. Lot size = 1.31 acres
2. Post-Development Impervious area = 35283.6 SQFT (buildings, concrete, and asphalt)
3. V = (0.5 in * 35,283.6 SQFT) / 12 in/ft = 1470.15 cubic feet of volume
Sundance Springs
COMM LOT 2 July 13, 2022
8
The initial storm water facility must provide a minimum volume of 1,470 ft3 of storage to retain or
infiltrate the first 0.5 inches from a storm event. The two proposed retention ponds provide 3,514 ft3 of
storage capacity meeting this requirement.
3. FACILITY MAINTENANCE PLAN
A. OWNERSHIP OF FACILITY
1. Sundance Springs Commercial HOA.
2. SCHEULE FOR MAINTENANCE
1. The retention area should be regularly inspected for signs of erosion, seepage, and structural
damage. Sediment should be removed and the basin restored to its original dimensions when
the sediment has accumulated to one-half the design depth of the basin or 50% of the design
capacity. Andy signs of erosion and/or structural damage to the detention basin noted during
an inspection should be repaired immediately. Basin should be inspected once every 14
calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater.
3. RESPONSIBLE PARTY
1. Sundance Springs Commercial HOA.
4. CERTIFICATION
This report and drainage plan for the Sundance Springs Commercial Lot 2 was prepared by me (or under
my direct supervision) in accordance with the provisions of the City of Bozeman “Design Standards and
Specifications Policy”.
Signature:
State of Montana No. 20459 7-27-22
Time of Concentration Equation: 1.87(1.1-C*Cf)D0.5 / S0.33
Rational Method, 10-year storm Modified Rational Method
Flat Clay/Silt Loam Pasture 0.36 10-year storm 10-year storm, D=Tc
Asphalt Drive/Parking 0.7 D=Tc RUNOFF RATES FROM SSA
Commercial Buildings 0.75
Lawn, Landscape 0.15
Predevelopment: 1 Basin Predevelopment: 1 Basin
AC C C*SF C = 0.36 C = 0.36
Total Area 1.31 i = 1.562428 in/hr Q = 0.19 cfs
Area Undeveloped 1.31 0.36 0.47 A = 1.31 ac V = 1368 CF
Area Building 0.00 0.75 0.00 Q = 0.736841 cfs
Area Asphalt 0.00 0.7 0.00 V = 5305.257 CF
Area Lawn 0.00 0.15 0.00
Weighted C, Developed 0.36
Drainage Path Length 319.00 ft
Drainage Path Slope 4.30 %
Frequency Adjustment Factor 1.00
Time of Concentration, Tc 15.20 min
Developed Basin 1 Developed Basin 1
AC C C*SF C = 0.55 C = 0.55
Total Area 0.57 i = 1.632096 in/hr Q = 0.13 cfs
Area Undeveloped 0.00 0.36 0.00 A = 0.57 ac V = 936 CF
Area Building 0.20 0.75 0.15 Q = 0.506564 cfs
Area Asphalt 0.19 0.7 0.14 V = 3647.26 CF
Area Lawn 0.18 0.15 0.03
Weighted C, Developed 0.55
Drainage Path Length 247.00 ft
Drainage Path Slope 1.50 %
Frequency Adjustment Factor 1.00
Time of Concentration, Tc 14.21 min
Developed Basin 2 Developed Basin 2
AC C C*SF C = 0.61 C = 0.61
Total Area 0.52 i = 1.974182 in/hr Q = 0.13 cfs
Area Undeveloped 0.00 0.36 0.00 A = 0.52 ac V = 936 CF
Area Building 0.17 0.75 0.13 Q = 0.629125 cfs
Area Asphalt 0.25 0.7 0.18 V = 4529.7 CF
Area Lawn 0.10 0.15 0.01
Weighted C, Developed 0.61
Drainage Path Length 255.00 ft
Drainage Path Slope 2.60 %
Frequency Adjustment Factor 1.00
Time of Concentration, Tc 10.61 min
Developed Basin 3 Developed Basin 3
AC C C*SF C = 0.36 C = 0.36
Total Area 0.14 i = 2.356453 in/hr Q = 0.02 cfs
Area Undeveloped 0.14 0.36 0.05 A = 0.14 ac V = 144 CF
Area Building 0.00 0.75 0.00 Q = 0.118647 cfs
Area Asphalt 0.00 0.7 0.00 V = 854.2598 CF
Area Lawn 0.00 0.15 0.00
Weighted C, Developed 0.36
Drainage Path Length 134.00 ft
Drainage Path Slope 7.80 %
Frequency Adjustment Factor 1.00
Time of Concentration, Tc 8.08 min
Developed Basin 4 Developed Basin 4
AC C C*SF C = 0.15 C = 0.15
Total Area 0.08 i = 4.999821 in/hr Q = 0.01 cfs
Area Undeveloped 0.36 0.00 A = 0.08 ac V = 72 SF
Area Building 0.00 0.75 0.00 Q = 0.059998 cfs
Area Asphalt 0.00 0.7 0.00 V = 431.9845 SF
Area Lawn 0.08 0.15 0.01
Weighted C, Developed 0.15 TOTAL POST DEV RUNOFF VOLUME
Drainage Path Length 15.00 ft 2088 SF
Drainage Path Slope 20.00 %DIFFERENCE IN VOLUME
Frequency Adjustment Factor 1.00 720 SF
Time of Concentration, Tc 2.54 min
Onsite Basin 3
Onsite Basin 4
Predevelopment: 1 Basin
Runoff Coefficients C
Onsite Basin 1
Onsite Basin 2
Project Description
Post Mod Rational 10yr.SPF
Project Options
CFS
Elevation
Modified Rational
User-Defined
Hydrodynamic
YES
NO
Analysis Options
Mar 23, 2022 01:00:00
Mar 24, 2022 01:00:00
Mar 23, 2022 01:00:00
0 days
0 01:00:00 days hh:mm:ss
0 00:05:00 days hh:mm:ss
0 00:05:00 days hh:mm:ss
30 seconds
Number of Elements
Qty
0
4
4
0
4
0
0
0
0
0
0
0
0
0
0
0
0
Rainfall Details
10 year(s)
Outlets ..........................................................................
Pollutants ..............................................................................
Land Uses ............................................................................
Return Period........................................................................
Links......................................................................................
Channels ......................................................................
Pipes ............................................................................
Pumps ..........................................................................
Orifices .........................................................................
Weirs ............................................................................
Nodes....................................................................................
Junctions ......................................................................
Outfalls .........................................................................
Flow Diversions ...........................................................
Inlets ............................................................................
Storage Nodes .............................................................
Runoff (Dry Weather) Time Step ..........................................
Runoff (Wet Weather) Time Step ........................................
Reporting Time Step ............................................................
Routing Time Step ................................................................
Rain Gages ...........................................................................
Subbasins..............................................................................
Enable Overflow Ponding at Nodes ......................................
Skip Steady State Analysis Time Periods ............................
Start Analysis On ..................................................................
End Analysis On ...................................................................
Start Reporting On ................................................................
Antecedent Dry Days ............................................................
File Name .............................................................................
Flow Units .............................................................................
Elevation Type ......................................................................
Hydrology Method .................................................................
Time of Concentration (TOC) Method ..................................
Link Routing Method .............................................................
Subbasin Summary
SN Subbasin Area Weighted Total Total Total Peak Time of
ID Runoff Rainfall Runoff Runoff Runoff Concentration
Coefficient Volume
(ac)(in)(in)(ac-in)(cfs)(days hh:mm:ss)
1 OnsiteSub1 0.57 0.5500 0.82 0.45 0.26 0.13 0 00:14:12
2 OnsiteSub2 0.52 0.6100 0.82 0.50 0.26 0.13 0 00:10:36
3 OnsiteSub3 0.14 0.3600 0.82 0.29 0.04 0.02 0 00:08:04
4 OnsiteSub4 0.08 0.1500 0.82 0.12 0.01 0.01 0 00:02:32
Subbasin Hydrology
Subbasin : Onsite Basin 1
Input Data
Area (ac) .......................................................0.57
Weighted Runoff Coefficient ........................0.5500
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
Developed 0.57 B 0.55
Composite Area & Weighted Runoff Coeff.0.57 0.55
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.82
Total Runoff (in) ............................................0.45
Peak Runoff (cfs) .........................................0.13
Rainfall Intensity ...........................................0.408
Weighted Runoff Coefficient ........................0.5500
Time of Concentration (days hh:mm:ss) ......0 00:14:13
Subbasin : Onsite Basin 1
Subbasin : Onsite Basin 2
Input Data
Area (ac) .......................................................0.52
Weighted Runoff Coefficient ........................0.6100
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
Developed 0.52 -0.61
Composite Area & Weighted Runoff Coeff.0.52 0.61
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.82
Total Runoff (in) ............................................0.50
Peak Runoff (cfs) .........................................0.13
Rainfall Intensity ...........................................0.408
Weighted Runoff Coefficient ........................0.6100
Time of Concentration (days hh:mm:ss) ......0 00:10:37
Subbasin : Onsite Basin 2
Subbasin : Onsite Basin 3
Input Data
Area (ac) .......................................................0.14
Weighted Runoff Coefficient ........................0.3600
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
Undeveloped 0.14 -0.36
Composite Area & Weighted Runoff Coeff.0.14 0.36
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.82
Total Runoff (in) ............................................0.29
Peak Runoff (cfs) .........................................0.02
Rainfall Intensity ...........................................0.408
Weighted Runoff Coefficient ........................0.3600
Time of Concentration (days hh:mm:ss) ......0 00:08:05
Subbasin : Onsite Basin 3
Subbasin : Onsite Basin 4
Input Data
Area (ac) .......................................................0.08
Weighted Runoff Coefficient ........................0.1500
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
Landscaped 0.08 -0.15
Composite Area & Weighted Runoff Coeff.0.08 0.15
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.82
Total Runoff (in) ............................................0.12
Peak Runoff (cfs) .........................................0.01
Rainfall Intensity ...........................................0.408
Weighted Runoff Coefficient ........................0.1500
Time of Concentration (days hh:mm:ss) ......0 00:02:32
Subbasin : Onsite Basin 4
Project Description
Post Mod Rational 2yr.SPF
Project Options
CFS
Elevation
Modified Rational
User-Defined
Hydrodynamic
YES
NO
Analysis Options
Mar 23, 2022 01:00:00
Mar 24, 2022 01:00:00
Mar 23, 2022 01:00:00
0 days
0 01:00:00 days hh:mm:ss
0 00:05:00 days hh:mm:ss
0 00:05:00 days hh:mm:ss
30 seconds
Number of Elements
Qty
0
4
4
0
4
0
0
0
0
0
0
0
0
0
0
0
0
Rainfall Details
2 year(s)
Outlets ..........................................................................
Pollutants ..............................................................................
Land Uses ............................................................................
Return Period........................................................................
Links......................................................................................
Channels ......................................................................
Pipes ............................................................................
Pumps ..........................................................................
Orifices .........................................................................
Weirs ............................................................................
Nodes....................................................................................
Junctions ......................................................................
Outfalls .........................................................................
Flow Diversions ...........................................................
Inlets ............................................................................
Storage Nodes .............................................................
Runoff (Dry Weather) Time Step ..........................................
Runoff (Wet Weather) Time Step ........................................
Reporting Time Step ............................................................
Routing Time Step ................................................................
Rain Gages ...........................................................................
Subbasins..............................................................................
Enable Overflow Ponding at Nodes ......................................
Skip Steady State Analysis Time Periods ............................
Start Analysis On ..................................................................
End Analysis On ...................................................................
Start Reporting On ................................................................
Antecedent Dry Days ............................................................
File Name .............................................................................
Flow Units .............................................................................
Elevation Type ......................................................................
Hydrology Method .................................................................
Time of Concentration (TOC) Method ..................................
Link Routing Method .............................................................
Subbasin Summary
SN Subbasin Area Weighted Total Total Total Peak Time of
ID Runoff Rainfall Runoff Runoff Runoff Concentration
Coefficient Volume
(ac)(in)(in)(ac-in)(cfs)(days hh:mm:ss)
1 OnsiteSub1 0.57 0.5500 0.48 0.26 0.15 0.08 0 00:14:12
2 OnsiteSub2 0.52 0.6100 0.48 0.29 0.15 0.08 0 00:10:36
3 OnsiteSub3 0.14 0.3600 0.48 0.17 0.02 0.01 0 00:08:04
4 OnsiteSub4 0.08 0.1500 0.48 0.07 0.01 0.00 0 00:02:32
Subbasin Hydrology
Subbasin : Onsite Basin 1
Input Data
Area (ac) .......................................................0.57
Weighted Runoff Coefficient ........................0.5500
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
Developed 0.57 B 0.55
Composite Area & Weighted Runoff Coeff.0.57 0.55
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.48
Total Runoff (in) ............................................0.26
Peak Runoff (cfs) .........................................0.08
Rainfall Intensity ...........................................0.238
Weighted Runoff Coefficient ........................0.5500
Time of Concentration (days hh:mm:ss) ......0 00:14:13
Subbasin : Onsite Basin 1
Subbasin : Onsite Basin 2
Input Data
Area (ac) .......................................................0.52
Weighted Runoff Coefficient ........................0.6100
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
Developed 0.52 -0.61
Composite Area & Weighted Runoff Coeff.0.52 0.61
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.48
Total Runoff (in) ............................................0.29
Peak Runoff (cfs) .........................................0.08
Rainfall Intensity ...........................................0.238
Weighted Runoff Coefficient ........................0.6100
Time of Concentration (days hh:mm:ss) ......0 00:10:37
Subbasin : Onsite Basin 2
Subbasin : Onsite Basin 3
Input Data
Area (ac) .......................................................0.14
Weighted Runoff Coefficient ........................0.3600
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
Undeveloped 0.14 -0.36
Composite Area & Weighted Runoff Coeff.0.14 0.36
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.48
Total Runoff (in) ............................................0.17
Peak Runoff (cfs) .........................................0.01
Rainfall Intensity ...........................................0.238
Weighted Runoff Coefficient ........................0.3600
Time of Concentration (days hh:mm:ss) ......0 00:08:05
Subbasin : Onsite Basin 3
Subbasin : Onsite Basin 4
Input Data
Area (ac) .......................................................0.08
Weighted Runoff Coefficient ........................0.1500
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
Landscaped 0.08 -0.15
Composite Area & Weighted Runoff Coeff.0.08 0.15
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.48
Total Runoff (in) ............................................0.07
Peak Runoff (cfs) .........................................0.00
Rainfall Intensity ...........................................0.238
Weighted Runoff Coefficient ........................0.1500
Time of Concentration (days hh:mm:ss) ......0 00:02:32
Subbasin : Onsite Basin 4
Project Description
Post Mod Rational 100yr.SPF
Project Options
CFS
Elevation
Modified Rational
User-Defined
Hydrodynamic
YES
NO
Analysis Options
Mar 23, 2022 01:00:00
Mar 24, 2022 01:00:00
Mar 23, 2022 01:00:00
0 days
0 01:00:00 days hh:mm:ss
0 00:05:00 days hh:mm:ss
0 00:05:00 days hh:mm:ss
30 seconds
Number of Elements
Qty
0
4
4
0
4
0
0
0
0
0
0
0
0
0
0
0
0
Rainfall Details
10 year(s)
Outlets ..........................................................................
Pollutants ..............................................................................
Land Uses ............................................................................
Return Period........................................................................
Links......................................................................................
Channels ......................................................................
Pipes ............................................................................
Pumps ..........................................................................
Orifices .........................................................................
Weirs ............................................................................
Nodes....................................................................................
Junctions ......................................................................
Outfalls .........................................................................
Flow Diversions ...........................................................
Inlets ............................................................................
Storage Nodes .............................................................
Runoff (Dry Weather) Time Step ..........................................
Runoff (Wet Weather) Time Step ........................................
Reporting Time Step ............................................................
Routing Time Step ................................................................
Rain Gages ...........................................................................
Subbasins..............................................................................
Enable Overflow Ponding at Nodes ......................................
Skip Steady State Analysis Time Periods ............................
Start Analysis On ..................................................................
End Analysis On ...................................................................
Start Reporting On ................................................................
Antecedent Dry Days ............................................................
File Name .............................................................................
Flow Units .............................................................................
Elevation Type ......................................................................
Hydrology Method .................................................................
Time of Concentration (TOC) Method ..................................
Link Routing Method .............................................................
Subbasin Summary
SN Subbasin Area Weighted Total Total Total Peak Time of
ID Runoff Rainfall Runoff Runoff Runoff Concentration
Coefficient Volume
(ac)(in)(in)(ac-in)(cfs)(days hh:mm:ss)
1 OnsiteSub1 0.57 0.5500 0.82 0.45 0.26 0.13 0 00:14:12
2 OnsiteSub2 0.52 0.6100 0.82 0.50 0.26 0.13 0 00:10:36
3 OnsiteSub3 0.14 0.3600 0.82 0.29 0.04 0.02 0 00:08:04
4 OnsiteSub4 0.08 0.1500 0.82 0.12 0.01 0.01 0 00:02:32
Subbasin Hydrology
Subbasin : Onsite Basin 1
Input Data
Area (ac) .......................................................0.57
Weighted Runoff Coefficient ........................0.5500
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
Developed 0.57 B 0.55
Composite Area & Weighted Runoff Coeff.0.57 0.55
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.82
Total Runoff (in) ............................................0.45
Peak Runoff (cfs) .........................................0.13
Rainfall Intensity ...........................................0.408
Weighted Runoff Coefficient ........................0.5500
Time of Concentration (days hh:mm:ss) ......0 00:14:13
Subbasin : Onsite Basin 1
Subbasin : Onsite Basin 2
Input Data
Area (ac) .......................................................0.52
Weighted Runoff Coefficient ........................0.6100
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
Developed 0.52 -0.61
Composite Area & Weighted Runoff Coeff.0.52 0.61
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.82
Total Runoff (in) ............................................0.50
Peak Runoff (cfs) .........................................0.13
Rainfall Intensity ...........................................0.408
Weighted Runoff Coefficient ........................0.6100
Time of Concentration (days hh:mm:ss) ......0 00:10:37
Subbasin : Onsite Basin 2
Subbasin : Onsite Basin 3
Input Data
Area (ac) .......................................................0.14
Weighted Runoff Coefficient ........................0.3600
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
Undeveloped 0.14 -0.36
Composite Area & Weighted Runoff Coeff.0.14 0.36
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.82
Total Runoff (in) ............................................0.29
Peak Runoff (cfs) .........................................0.02
Rainfall Intensity ...........................................0.408
Weighted Runoff Coefficient ........................0.3600
Time of Concentration (days hh:mm:ss) ......0 00:08:05
Subbasin : Onsite Basin 3
Subbasin : Onsite Basin 4
Input Data
Area (ac) .......................................................0.08
Weighted Runoff Coefficient ........................0.1500
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
Landscaped 0.08 -0.15
Composite Area & Weighted Runoff Coeff.0.08 0.15
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.82
Total Runoff (in) ............................................0.12
Peak Runoff (cfs) .........................................0.01
Rainfall Intensity ...........................................0.408
Weighted Runoff Coefficient ........................0.1500
Time of Concentration (days hh:mm:ss) ......0 00:02:32
Subbasin : Onsite Basin 4