First Amendment to Professional Services Agreement for a Parking Garage Maintenance Manual
FY 2023
Page 1 of 6
FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT
THIS FIRST AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR
A Parking Garage Maintenance Manual dated April 26th, 2022 (the “Agreement”) is made and
entered into this 23rd day of August, 2022 by and between the CITY OF BOZEMAN,
MONTANA, a self governing municipal corporation organized and existing under its Charter and
the laws of the State of Montana, 121 North Rouse Street, Bozeman, Montana, with a mailing
address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as “City,” and Desman
Design Management, 7900 East Union Ave Suite 160, Denver, CO 80237, hereinafter referred to
as “Contractor.”
In consideration of the mutual covenants and agreements herein contained, the receipt and
sufficiency whereof being hereby acknowledged, the parties hereto agree to amend the Agreement
as follows:
1. Scope of Work. The Scope of Work is amended to include the scope outlined in Appendix
A for design services related to the Bridger Parking Garage Maintenance Manual.
2. Agreement still valid. All remaining terms and provisions of the Agreement remain valid.
**** END OF AGREEMENT EXCEPT FOR SIGNATURES ****
DocuSign Envelope ID: F452F45C-8FC5-4B67-8B55-B97CADB7D838
First Amendment to Professional Services Agreement for a Parking Garage Maintenance Manual
FY 2023
Page 2 of 6
IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and
year first above written.
CITY OF BOZEMAN, MONTANA DESMAN DESIGN MANAGEMENT
By________________________________ By_____________________________
Jeff Mihelich, City Manager Hoshi Engineer, Vice President
APPROVED AS TO FORM
By_______________________________
Greg Sullivan, Bozeman City Attorney
DocuSign Envelope ID: F452F45C-8FC5-4B67-8B55-B97CADB7D838
First Amendment to Professional Services Agreement for a Parking Garage Maintenance Manual
FY 2023
Page 3 of 6
APPENDIX A
August 11, 2022
Mr. Mike Veselik
Economic Development Specialist
Economic Development Division
City of Bozeman
121 N. Rouse Avenue
Bozeman, MT 59715
Re: Bridger Parking Garage Testing and Construction Documents Bozeman, MT
Dear Mr. Veselik:
DESMAN is pleased to submit the following proposal for professional engineering services for
Construction Documents for the repair of the Bridger Parking Garage in Bozeman, MT. Following
is our Scope of Services and proposed fee to complete the project for the city.
SCOPE OF SERVICES A. TEST PROGRAM (Extensive Cracking in the Basement Slab
Ceiling)
1. Establish a test program and criteria to gain an understanding of the behavior of cracks
in the ceiling of the basement slab (first supported level slab). The cracking is
widespread and intense with some cracks ¼” in width. Some wider cracks have been
previously epoxy injected, but we need to understand their characteristics over time and
seasonal temperature variation.
2. Assist the city in contracting directly with a qualified a testing agency capable of
performing requisite concrete monitoring, including the installation of crack strain
gauges at appropriate locations to monitor horizontal movements and vertical
displacements at cracks. Test program should run through end of Spring 2023.
3. Travel to Bozeman if required, to discuss the test program with the city and testing
agency.
4. Fee for the repair program will be determined based on the test results.
DocuSign Envelope ID: F452F45C-8FC5-4B67-8B55-B97CADB7D838
First Amendment to Professional Services Agreement for a Parking Garage Maintenance Manual
FY 2023
Page 4 of 6
5. Note: In the interim we recommend shoring the ground level supported slab to
basement slab-on-grade below, between grids B to C and from lines 3 to 10 in a manner
that will allow circulation and retain as much parking as practical. Shoring shall
distribute loads to the basement floor slab in a uniform manner without exceeding the
capacity of the grade slab or the soils.
B. CONSTRUCTION DOCUMENTS FOR REPAIR OF CONCRETE
COMPONETS AND MISCELLANEOUS ITEMS WITHIN THE GARAGE
6. Develop drawings indicating locations and extent of the remaining garage repairs,
including beams, slab, spandrels, columns, concrete block and brick walls, and barrier
cables. Repair and maintenance items may be noted for phased construction as
applicable.
7. Develop fencing details in selected bays on south perimeter of the garage to screen
utility poles.
8. Develop repair details for the conditions noted on the drawings.
9. Provide technical specifications for work items, repair procedures, defined products,
testing requirements for materials during construction, and warranties.
10. Develop a bid proposal form describing the repair and maintenance work with
estimated quantities formatted for payment based on a lump sum or unit price basis, as
applicable.
11. Provide construction administration services over a four-months including two site
visits to monitor the progress and quality of construction. Follow up site visit with field
report.
Drawings and specifications will be compiled and sent electronically in PDF format to the city for
distribution to the prospective contractors. DESMAN will remain available after the bid
documents have been distributed to provide written responses and clarifications to bid questions,
prepare addendums to bidders incorporating any changes or clarifications which arise, and other
project related assistance as needed while contractors prepare bids.
In conjunction with the city, DESMAN will review bids received from prospective contractors for
completeness and adherence to the bid form. It is anticipated that the city will compile a list of
qualified contractors and invite them to bid on the project.
FEE PROPOSAL
DESMAN proposes a lump sum labor fee of $44,000 to complete the Scope of Services presented
above as follows:
Test Program $ 5,000
DocuSign Envelope ID: F452F45C-8FC5-4B67-8B55-B97CADB7D838
First Amendment to Professional Services Agreement for a Parking Garage Maintenance Manual
FY 2023
Page 5 of 6
Construction Documents $ 33,000
Construction Administration $ 6,000 ($1,500 per month over four months)
Total: $44,000
Reimbursable expanses for travel, copying, printing and reprographics are in addition to the labor
fee and estimated to be $3,000 for three trips to Bozeman. As is always the case, our
reimbursable expenses will be billed at cost with no mark up.
SCHEDULE
We are available to proceed with the above services within 3 weeks of approval of the proposal.
We will need about 3 to 4 months to complete the construction documents., although the test
program could be implemented as soon as possible.
Hourly Billing Rates
Following are our current hourly rates by personnel classification for additional services requested
by the city not outlined herein:
Employee Classification Hourly Rate
Project Manager $190.00
Senior Engineer/Architect/Planner $180.00
Engineer/Architect/Planner
$170.00
Valid through December 31, 2022
CLOSURE
On behalf of DESMAN’s team of professionals, we thank you for this opportunity to submit the
enclosed technical and fee proposal. Should you have any questions or concerns regarding this
submission, please do not hesitate to contact me. We look forward to working with you one again
on this project.
Sincerely,
DESMAN Inc.
Hoshi Engineer, PE, SE
DocuSign Envelope ID: F452F45C-8FC5-4B67-8B55-B97CADB7D838
First Amendment to Professional Services Agreement for a Parking Garage Maintenance Manual
FY 2023
Page 6 of 6
Vice President
Maintenance items for the city:
Mechanical:
• Test the garage ventilation system (Item 13 of the staffing manual)
• Replace & protect missing or broken fire extinguishers (item 14)
The mounting heights need to be 48” for ADA accessibility. It appears that the cabinets are both
damaged by vehicles (snowplows) and also vandalized. Relocating the cabinets out of drive lanes
and snowplow lanes - locate them close to walk doors will help with the damage issues. About
the best thing the city can do for the vandalism is to install a security camera at each box and then
link the extinguisher to the building fire alarm system. If the extinguisher is used, the fire alarm
system activates.
Electrical:
• Test the Emergency Egress Lighting (item 10b).
• Check the heat trace (item 10c).
The above maintenances could be performed by a qualified MEP service contractor directly
contracted by the city to minimize cost.
DocuSign Envelope ID: F452F45C-8FC5-4B67-8B55-B97CADB7D838