HomeMy WebLinkAbout015 West Gallatin Canal Agreement - signed DITCH RELOCATION AGREEMENT
This Ditch Relocation Agreement ("Agreement") is entered into this day of
2022, by and between the West Gallatin Canal Company, a Montana
corporation with address of P.O. Box 553, Gallatin Gateway, MT 59730, (hereinafter referred to
as "the Ditch Company") and Buffalo Run Bozeman, LLC, a Colorado limited liability company
of 5400 Fowler Lane, Bozeman, MT 59718 (hereinafter referred to as "BRB") and collectively
referred to as "the Parties".
WHEREAS, the Ditch Company is the owner of an irrigation ditch system located in the
southwest area of Bozeman and more particularly between Blackwood Road and Stucky Road
(hereinafter referred to as the "Ditch");
WHEREAS, the Ditch Company has established a ditch easement for the Ditch for the
purpose of conveying irrigation water to its members' real property;
WHEREAS, the Ditch runs parallel to Fowler Lane on both the east and west side of
Fowler Lane;
WHEREAS, BRB desires to relocate the east-side portions of the Ditch and improve the
west-side portions of the Ditch to facilitate the improvements to Fowler Lane in accordance with
approved plans required by the City of Bozeman and prepared by Morrison Maierle; and
WHEREAS, the Parties are desirous of formalizing an agreement between them which
will define the terms and conditions under which BRB might relocate and improve the Ditch;
NOW, THEREFORE, the Parties mutually covenant and agree as follows:
Page 1 of 5
1. All recitals are incorporated herein as if fully set forth.
2. The Ditch Company, subject to the terms and conditions set forth herein, shall permit
BRB to relocate and improve the Ditch in accordance with approved plans prepared by Morrison
Maierle and as set forth on Exhibit A attached hereto, which exhibit shall become an integral part
of this Agreement.
3. Upon execution of this Agreement, the Ditch Company shall review any and all plans,
specifications, and drawings prepared by BRB or any engineer, agent, contractor, or other person
on behalf of BRB which specify the nature of such construction methods and materials for the
relocation and improvement of the Ditch including, but not limited to, description of materials, re-
grading, cleaning, clearing of vegetation, realignment, or culverts which BRB intends to construct
and which will encroach upon or in any way interfere with the Ditch. BRB shall provide the
aforementioned plans, specifications, and drawings to the Ditch Company as soon after execution
of this Agreement as practicable. BRB acknowledges Ditch Company may hire, at BRB's
expense, a qualified, third party professional engineer to review any plans, specifications, or
drawings to determine if the same, once constructed, will provide for the adequate transport of
water through the Ditch without jeopardizing the integrity of the Ditch. In the event the Ditch
Company shall determine the proposed relocation or improvement of the Ditch, once constructed,
will not provide for the adequate transport of water through the new Ditch and/ or will jeopardize
the integrity of the water conveyance, the Ditch Company shall give notice of the same, together
when any other findings, to BRB within fourteen (14)days of receipt of the aforementioned plans,
specifications, and drawings. BRB shall have the right to cure the issues raised by the Ditch
Company.
5. During relocation and improvement of the Ditch, BRB shall be responsible for
stabilizing the ditch bank around any culvert or pipeline openings so no sloughing occurs.
6. BRB agrees to reimburse Ditch Company for any and all expenses it may incur in the
preparation and recording of this Agreement including, but not limited to Ditch Company staff
time, reasonable attorney fees incurred by Ditch Company to review this Agreement or any and
all plans, drawings, or specifications for construction work or changes which BRB undertakes
pursuant to this Agreement. All fees and expenses to be paid under this Agreement shall be
invoiced to BRB by the Ditch Company no later than forty-five (45) days after the expense is
incurred. BRB shall pay the Ditch Company's invoice(s) within forty-five (45) days of presentation
Page 2 of 5
to BRB by Ditch Company.
7. BRB agrees the Ditch Company may enter upon the Ditch and ditch easement during
construction of the new Ditch for purposes of inspection, repair, operation and maintenance of
the Ditch. However, at no time shall such entry interfere with the construction of the new Ditch or
the on-going operations on the Property.
8. Under no circumstances shall BRB interrupt or in any way interfere with the flow of
water through the Ditch at any time without prior written consent of the Ditch Company.
Permission to interrupt the flow of water will be granted based on the sole discretion of the Ditch
Company, but will not be unreasonably withheld and be consistent with achieving the purpose of
this Agreement.
9. Upon BRB's completion of the relocation and improvement of the Ditch, the Ditch
Company shall have the opportunity to inspect and confirm the relocated and improved Ditch
operates and performs as expected. Once the Ditch Company confirms the relocated and
improved Ditch operates as expected, the Parties agree BRB shall have no further obligation to
inspect, maintain, or repair the new Ditch. The Ditch Company's confirmation shall not be
unreasonably withheld.
10. BRB hereby agrees to indemnify and hold the Ditch Company harmless from any
and all claims, causes of action, costs, and reasonable attorney fees which the Ditch Company
may sustain by reason of or in connection with any claim filed against it for any event which may
occur during BRB's relocation and improvement of the Ditch or as a result of any action by BRB,
its successors, agents, assigns or property owner(s).
11. All covenants and agreements herein contained shall extend to and be binding upon
the heirs, personal representatives, assigns, or successors of the respective parties hereto and
shall run with the title of the property in perpetuity unless rescinded in writing by the Ditch
Company.
12. This Agreement constitutes the entire agreement and understanding between the
parties hereto and supersedes all prior and contemporaneous agreements and understandings
of the parties in connection herewith which conflict with the expressed terms, covenants, and
conditions of this Agreement. Covenant, representation, or condition not expressed in this
Agreement shall not be effective to interpret, change, or restrict the express provisions of this
Agreement unless specified in writing and signed by both parties hereto.
Page 3 of 5
13. If it becomes necessary for either party hereto to bring suit to enforce their rights
under this Agreement and if that party shall prevail in such action, the other party agrees to pay
all of the costs of the action as allowed by the Court together with reasonable attorney fees.
14. Nothing in this Agreement is intended to convey any ownership interest in the water
rights owned by Ditch Company nor any permission to use water conveyed in the Ditch pursuant
to a water right in any manner not consistent with Montana law. BRB is expressly prohibited from
seeking to change any elements of Ditch Company's water rights without the express written
consent of Ditch Company.
15. This Agreement may be signed in counterparts, paper or electronic, each of which
shall constitute an original, and all of which will be collectively deemed to constitute one document.
16. The Parties represent and warrant that they have read this Agreement, and each and
every part thereof; that they understand the terms and conditions; and have consulted with
counsel with respect thereto; and that they accept, agree to and intend to be bound by the terms
and conditions of this Agreement.
IN WITNESS WHEREOF, the parties hereto have signed and sealed this Agreement the day and
year above first written.
WEST GALLATIN CANAL C MPANY
By:
Its:. 3e C,/I fr�& iy (-,C G
STATE OF MONTANA )
: ss.
COUNTY OF GALLATIN )
This instrument was acknowledged before me on fCpYi` � 2022, by
AW1O {�--De& y4-,rdLi S , as 55C05 I TrfA1;. • of West Gallatin Canal Company.
,,o�SEGGFy,<; S EGGEN Notary State of nta
(seal) Notary Public Printed a
e :NoTnaigi• for the State of Montana
*= Residing at:
uj.SEAL.�Q Bozeman, Montana
%, � :• MY Commission Expires:
October 06,2022
Page 4 of 5
BUFFALO RUN BOZEEMAN, LLC:
By: Dfigef..)g- j a A,nj A,
Its: Manager
STATE OF MONTANA )
ss.
COUNTY OF GALLATIN )
This instrument was acknowledged before me on 2022, by
Decck�:l�,r�s , as Manager of Buffalo Run Bozeman, LLC.
CYNTHIA M EDGMOND
Notary Public Notary State of M ntana
seal =U•, pTAR/qZ°yo=_for the State of Montana
(seal) _-_ Printed Name: �, ;�VYt. t�c�r.�,r►o�c1
*. *` Residing at:
�;.SEAL Q_ Bozeman, Montana
My Commission Expires:
M,,,, ° December 8,2024
Page 5 of 5
LEGEND
` .:.. PRESERVE EXISTING CMP
PROPOSED WEST SIDE DITCH IMPROVEMENTS FOR COMBINED FLOW CULVERTS UNDER STUCKY ROAD
ALONG COUNTY ROAD SECTIONS IT
ON EACH SIDE OF FOWLER LANE
PROPOSED WEST SIDE DITCH OPTION THROUGHOUT PROPERTY FRONTAGE £z
NEW CULVERT OF SPECIFIED SIZE(FLOW DIRECTION FROM WEST TO EAST) -f - __- — STUCKY ROAD - ---
NEW CULVERT OF SPECIFIED SIZE(FLOW DIRECTION FROM FAST TO WEST) OhS35,M.
9
NEW 30"EQUIVALENT ARCH PIPE CMP ;:-
CULVERT TO BE ANGLED AT 45'ANGLE TO
ROAD IN DIRECTION OF FLOW TO MINIMIZEtN "'
ENERGY/WATER LOSS AND MINIMIZE " --
DEBRIS BUILDUP.
CULVERT INSTALLED TO PROVIDE
DIVERSION FOR MSU WATER RIGHTS :: -
e
e
TO
m
m
z
m
m
MAINTAIN EXISTING DIVERSION
FOR BRADLEY PROPERTY
NEW CULVERT TO CONVEY LOCALZED STORM
RUNOFF FROM EAST SIDE DITCH.INSTALL 15"CMP
AT 45°ANGLE TO ROAD IN DIRECTION OF FLOW t
BUFFALO RUN BOZEMAN �.
PROPERTY
1'
NEW 36"EQUIVALENT ARCH CMP CULVERT
CROSSING.INSTALL CMP AT 45"ANGLE TO _
MINIMIZE
ROAD IN DIRECTION OF FLOW TO MINIMIZE
ENERGY!WATER LOSS AND MINIMIZE DEBRIS ypG HOLDIK�
BUILDUP.
ALL IRRIGATION WATER CONVEYED WEST TO
COMBINED DITCH
N�OtiEL,�,,9E
BLACKWOOD ROAD FIS N w
NO MODIFICATIONS TO EXISTING
CULVERTS BENEATH BLACKWOOD
ROAD AT INTERSECTION
NO MODIFICATIONS TO EXISTING
DITCHES SOUTH OF BLACKWOOD ROAD
PRESERVE EXISTING CMP CULVERT
r, TO EAST TO MAINTAIN WATER
ACCESS TO REAL RED LLC PROPERTY
KKR i
'N`ysSO P:..
N.T.S.
■
duwH ev:Morrison o �a a�'"` BUFFALO RUN-OFFSITE IMPROVEMENTS i�OJE�"o
BOZEMAN
oscn.ev: �'600J
Maierle ��� MONTANA
FOWLER LANE IRRIGATION DITCH REALIGNMENT cicuaE mimeEn
OPTION#Z FX-A