Loading...
HomeMy WebLinkAbout030 A2.01 - BUILDING F -FOUNDATION & LEVEL 1 - 20211027W/D DW W/D DW W/D DW W/D DW W/D DW UP W/D DW W/D DW W/D DW DNDN DNDN UP 12' - 0"2"12' - 0"2"14' - 6"23' - 6"2"14' - 6"2"12' - 0"2"12' - 0"2"14' - 6"9' - 0"14' - 6"2"12' - 0"2"12' - 0" UNIT E-2B E1-01 UNIT E-2B E1-02 HALLWAY E101 UNIT E-1.5B E1-03 UNIT E-1.5B E1-04 UNIT E-2B E1-05 UNIT E-2B E1-06 HALLWAY E102 UNIT E-2B E1-07 UNIT E-2B E1-08 163' - 10" 38' - 10"9' - 0"29' - 2"2"38' - 10"9' - 0"38' - 10" 163' - 10"3' - 9"2' - 6"22' - 10 1/2"22' - 10 1/2"2' - 6"3' - 9"58' - 3"W1C W1C W1B W1B W1B W1B W1C W1C W3A W3A B1 01 U01 U01 W4A B2 W3A W3A W3A B1 S-207 S-208 U01U01 B1 W3A W3A W1C W1C W1B W1B W1B W1B W1C W1C W3A W3A B1 01 01 U01U01 01 B1 W3A W3A W3AB2 W4A 01 01 01 U01 B1 W3A W3A 1 1.3 1.7 2 3 3.5 4 4.3 4.7 5 6 6.3 6.7 7 A C B WTR RM E102E STRG E101E 01 U01 FIRE CONNECTION (BLDG E) FIRE CONNECTION (BLDG F) BLDG F 'WTR RM' 1 1.3 1.7 2 3 3.5 4 4.3 4.7 5 6 6.3 6.7 7 12' - 1"12' - 2"14' - 7"9' - 0"14' - 7"14' - 8"12' - 2"12' - 2"14' - 7"9' - 0"14' - 7"12' - 2"12' - 1" 163' - 10"3' - 9"2' - 6"22' - 10 1/2"22' - 10 1/2"2' - 6"3' - 9"58' - 3"38' - 10"9' - 0"29' - 2"39' - 0"9' - 0"38' - 10" 163' - 10" NNBUILDING E BUILDING F PROJECT NUMBER ISSUE DATE 3630 OSAGE STREETDENVER, CO 80211 720.512.3437 REVISIONS SHEET TITLE ISSUE SHEET NO. TOWN STAMP DISCIPLINE STAMPNOT FOR CONSTRUCTIONA2.01 BUILDING E&F - FOUNDATION & LEVEL 1 -----BUFFALO RUN----- SCHEMATIC DESIGN5400 FOWLER LANE,BOZEMAN, MT1/8" = 1'-0"2 BUILDING E&F - LEVEL 1 - FLOOR PLAN 1/8" = 1'-0"1 BUILDING E&F - FOUNDATION No. Description Date