Loading...
HomeMy WebLinkAboutPre-Plat narrative 08-01-18 BOZEMAN, GREAT FALLS, KALISPELL & SHELBY, MT | SPOKANE, WA | LEWISTON, ID | WATFORD CITY, ND | MEDIA, PA 406.586.0277 tdhengineering.com 234 East Babcock Street Suite 3 Bozeman, MT 59715 August 1, 2018 City of Bozeman Department of Community Development 20 East Olive Street Bozeman, MT 59715 RE: PRELIMINARY PLAT FOR AMENDED LOTS 1 & 3 IN BLOCK 4 OF THE KNOLLS AT HILCREST (J-483) NARRATIVE TD&H JOB NO. B17-077 Dear Danielle, The following responses address planning comments and preliminary plat supplements for the above project. The requested change on this amended plat is to remove the Non-Residential Use restriction on Lots 1 & 3 in Block 4. This restriction was not imposed by the City of Bozeman at time of Final Plat, but was part of the intended use by the developer for the subdivision at that time. Those uses are no longer relevant or applicable. It is the intent of the declarant/developer to designate these parcels as residential. This use is congruent with the growth policy designation as residential, and R/O zoning with intent for multi- household development. Lots 1 and 3 will be developed for multi-unit residential use. Preliminary Plat Supplement O. Land Use- Planning Comment 1.0 The maximum number of household structures for Lot 1 and 3 was calculated using the number of units on Lot 2 in Block 4 based on the parkland dedication. The original subdivision has 76 single family residential lots and 1 multi household lot, a total of 3.64 acres of parkland was needed for the original plat of The Knolls at Hillcrest. The calculated number of units for Lot 2 in Block 4 is 44.88 units for 4.266 acres which equates to 10.52 units/acre. Lot 1 in Block 4 has a calculated area of 0.726 acres which equates to 7.63 units. Lot 3 in Block 4 has a calculated area of 1.117 acres which equates to 11.75 units. The total number of units for this amended plat is 19.38 units. tdhengineering.com Preliminary Plat Supplement P. Parks and Recreation- Planning Comment 2.0 The parkland for the amended plat was calculated based on the 19.38 additional units at 0.03 acres/unit. Which equates to 0.58 acres of parkland required for the amended plat. With the additional 19.38 units added to the 120.88 existing units for the entire subdivision, and the additional 1.84 acres of residential added to the existing 14.874 acres of residential. The calculated net density of the entire subdivision with the amended plat is 8.39 units/acre, the calculated net density of the original subdivision is 8.13 units/acre. This gives us an increase in net density of 0.26 units/acre. It is intended to provide cash in lieu for the 0.58 acres of required parkland. Preliminary Plat Supplement Q. Neighborhood Center Plan- Planning Comment 3.0 The Knolls HOA maintained park located within the subdivision serves as the neighborhood center for Lots 1 and 3. The neighborhood center has public access and the following amenities: 2 picnic tables with concrete pads, 2 waste containers, 1 dog station, 2 6-ft wide accessible ramps, concrete walks, 23,405.5 square foot play area, and 2 park benches. Public parking is permitted on Knolls Drive. Documentation of the neighborhood center is attached. Engineering Comment 1.0 The sewer capacity has been discussed with Shawn Kohtz and it is our understanding that there will be a building restriction placed on the lots until the Front Street Sewer upgrade is completed. Engineering Comment 2.0 Cash in-lieu of water rights associated with the change in use for the two lots has b een calculated by Brian Heaston. Lots 1 and 3 currently have a credit of 10 acre feet per year available based on the cash in lieu of water rights payed for by the original plat. Typical multi-family water use is calculated at 0.124 AF/year for purposes of cash in lieu of water rights. A total of 80 multi-family units can be built with the remaining credit. Engineering Comment 3.0 Water demands for the proposed change in use are shown in the table below. tdhengineering.com Existing Domestic Water Demands Description Number of Units Population Demand (gpdpc) Total Demand (gpd) Peak Day Demand (gpd) Peak Hour Demand (gpm) Single Household Residence 76 2.54 200 38,608 96,520 80 Contiguous Hillcrest Expansion 65 2.54 200 33,020 82,550 69 Lots 1 & 3 Block 4 Residential 20 2.54 200 10,160 25,400 21 Community Center 1 13.71 200 2,742 6,855 6 Bed and Breakfast 1 13.71 200 2,742 6,855 6 Total Water Demand: 87,272 218,180 182 Proposed Domestic Water Demands Description Number of Units Population Demand (gpdpc) Total Demand (gpd) Peak Day Demand (gpd) Peak Hour Demand (gpm) Single Household Residence 76 2.54 200 38,608 96,520 80 Contiguous Hillcrest Expansion 65 2.54 200 33,020 82,550 69 Lots 1 & 3 Block 4 Residential 20 2.54 200 10,160 25,400 21 Multi-Family Residential 8 2.54 200 4,064 10,160 7.1 Multi-Family Residential 12 2.54 200 6,069 15,240 10.6 Total Water Demand: 91,921 229,870 188 The community center and bed and breakfast shown in the table in red are assumed to be for Lots 1 and 3 in Block 4. The Knolls Booster Station has a firm pump capacity of 384 gpm with the largest pump out of service which is based on the City of Bozeman’s Water Facility Plan Updated July 2017. Therefore the Knolls Booster Station has sufficient capacity to allow the change from non-residential to residential. Standard Code Provisions. 1.0 The preliminary plat conforms to the requirements of the Unified Development Code of tdhengineering.com the Bozeman Municipal Code and the Uniform Standards of Subdivision Plats. 2.0 No mortgages exist on the property. 3.0 Water right have been calculated for the property. 4.0 Required utility easement have been dedicated on the Final Plat of the Knolls at Hillcrest. 5.0 Waiver of Park Maintenance District has been filed with the annexation agreement and is on file at the Clerk and Recorder’s office as document number 2226842. 6.0 Lots 1 and 3 currently contain irrigated lawn and are maintained on a regular basis. 7.0 The certificates listed in Sections 38.06.020 through 38.03.110 are shown on the attached preliminary plat. 8.0 All preliminary plat requirements, as outlined in Article 41 are provided. Sincerely, Keith Waring PE Project Manager TD&H ENGINEERING