Loading...
HomeMy WebLinkAbout010 Email_City RE Traffic Study1 Gary Fox From:Alicia Paz-Solis <apazsolis@BOZEMAN.NET> Sent:Wednesday, October 27, 2021 4:48 PM To:Gary Fox; Lynn Hyde Subject:RE: Traffic Study for Beall Townhomes #21230 Attachments:ATT00001.txt; ATT00002.htm [EXTERNAL EMAIL] Only open attachments or click on links from senders you trust. Hello Gary, Based on the reported # of peak hour trips below, you do not need to submit a Traffic Impact Study (TIS) for the abovementioned project. Please include this correspondence with site plan resubmittal. Thank you, City of Bozeman MT Alicia Paz-Solis, EI | Engineering Department O: 406.582.2976 apazsolis@bozeman.net From: Gary Fox <gfox@wgmgroup.com> Sent: Wednesday, October 27, 2021 2:41 PM To: Lynn Hyde <lhyde@BOZEMAN.NET>; Alicia Paz-Solis <apazsolis@BOZEMAN.NET> Subject: [SENDER UNVERIFIED]Traffic Study for Beall Townhomes #21230 CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hello, This email is in regards to a comment received on the Conceptual review of the Beall Townhomes (#21230). The comment asked to provide peak hour trip generation to determine whether a traffic study is required. The traffic generation numbers are provided in the table below. An excerpt of the conceptual plan is attached. Thank you for your help. Please let us know if a traffic study is required. Land Use Size ITE Land Use Code Average Daily Traffic (ADT) AM Peak-Hour Trips PM Peak-Hour Trips Entering Exiting Entering Exiting Duplex 4 units 210 38 1 2 2 2 Triplex 6 units 220 44 1 2 2 1 2 Thanks, Gary Fox, PE Project Engineer M: 406-598-1201 O: 406-728-4611 109 East Main Street, Suite B Bozeman, Montana 59715 www.wgmgroup.com