HomeMy WebLinkAbout099 4th Floor Plan - HVAC pl�
GENERAL NOTES MFGR
1.IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INCLUDING EQUIPMENT SUPPLIERS TO COORDINATE WITH EACH
OTHER AND TO VERIFY THAT THERE ARE NO CONFLICTS IN LOCATIONS OF DUCTS, CONDUITS, SPRINKLER HEADS,
SPRINKLER PIPING, DIFFUSERS, ELECTRICAL BOXES AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL
PLACEMENT OF MATERIALS. D E S I G N S
2.REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION: DETAILED EQUIPMENT REQUIREMENTS,
INSTALLATION INSTRUCTIONS, PERFORMANCE REQUIREMENTS, CONTROL SEQUENCES AND ALL OTHER PROJECT DETAILS.
3.DUCTWORK SHALL BE GALVANIZED SHEET METAL. ROUND DUCTWORK SHALL BE SPIRAL OR SNAP-LOCK WITH ALL
SEAMS SEALED.
PO box 1001 Bozeman,MT 59771
4.RECTANGULAR SUPPLY AND RETURN DUCTWORK IN MECHANICAL ROOMS SHALL BE INSULATED WITH 1/2"THICK
DUCT LINER FOR SOUND ATTENUATION.
5.ALL OUTSIDE AIR DUCTWORK SHALL BE INSULATED WITH 1-1/2"DUCT WRAP.
6.EXHAUST DUCTWORK FROM THE EXTERIOR TO EXHAUST FANS SHALL BE INSULATED WITH 1-1/2"WRAP INSULATION.
I
7.DRYER VENT SHALL BE GALVANIZED SHEET METAL WITH ALL SEAMS SEALED. �f Q`8.PROVIDE BLUE DUCT FOR BELOW SLAB DUCTWORK.
SU THE STRUCTURE BETWEEN THE BASEMENT AND FIRST FLOORS IS A POST-TENSION (PT) SLAB. REFER TO THE ON
STRUCTURAL DRAWINGS FOR ALL PT SLAB REQUIREMENTS. COORDINATE ALL SYSTEMS THROUGH THE SLAB OR ...W SUPPORTED FROM THE SLAB. PRIOR TO SLAB INSTALLATION,ALL MECHANICAL, PLUMBING,AND ELECTRICAL SYSTEM /4.1, "CONNECTIONS, PENETRATIONS,SLEEVES,SUPPORTS,ANCHORS,AND HANGARS ARE TO BE INSTALLED. INSTALLATION HP_
OF THESE ITEMS AFTER PT SLAB IS INSTALLED WILL NOT BE ALLOWED WITHOUT COMPLETE STRUCTURE EVALUATION
AND SIGNED APPROVAL OF THE STRUCTURAL ENGINEER. MECHANICAL AND ELECTRICAL CONTRACTORS TO REVIEW
THREADED INSERT LAYOUT PRIOR TO INSTALLATION OF PT SLAB. COORDINATE ANY ADDITIONAL REQUIRED ANCHORS HP_1
WITH GENERAL CONTRACTOR AND STRUCTURAL ENGINEER PRIOR TO CONCRETE INSTALLATION.
HP-2
® HP-1
HP ® 0
HP C ® HP-2
-2 CDS
HP2-2C ERN INEETn
��n 0�txuRaRiu RO��
�X,lI.N.Y,59191
RORI RXI.)O
WWY.L OSI[X OIYfFRINIY0.t0Y
} t
tN
N
U
t6
L1
N
U
f/!
C
Ol
N
N
O
U
_N
L
O
Q
O
C
N
y
C
O
ID
w
N
d
_O
N
U C
0
+-r E
0
O
C
-M� U
' � Q
00"
V O/.. Z
c @
C -
0 N
ICI
cc cc
2
OO TEUH4 OO OO U p o
DH4-1C ® DH4-2C O L
CU4-iC CU4-2C
EUHn K cn
o o a o o a a o a
aC aC p aC OD aC CD13
17
a� 4
m
4TH FLOOR PLAN-
HVAC
L DRAWN BY: RJA
APPROVED BY: CLS
7 DATE: 5/3/2021
PROJECT NO: 20001
®N SCALE/8FLOOR o LAN-HVAC M2A