Loading...
HomeMy WebLinkAbout098 Roof Plan - HVAC RR MFGR GENERAL NOTES D E S I G N S 1.IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INCLUDING EQUIPMENT SUPPLIERS TO COORDINATE WITH EACH OTHER AND TO VERIFY THAT THERE ARE NO CONFLICTS IN LOCATIONS OF DUCTS,CONDUITS, SPRINKLER HEADS, SPRINKLER PIPING, DIFFUSERS, ELECTRICAL BOXES AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS. 2.REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION: DETAILED EQUIPMENT REQUIREMENTS, PO box 1001 Bozeman,MT 59771 INSTALLATION INSTRUCTIONS, PERFORMANCE REQUIREMENTS,CONTROL SEQUENCES AND ALL OTHER PROJECT DETAILS. 3.DUCTWORK SHALL BE GALVANIZED SHEET METAL. ROUND DUCTWORK SHALL BE SPIRAL OR SNAP-LOCK WITH ALL SEAMS SEALED. 4.RECTANGULAR SUPPLY AND RETURN DUCTWORK IN MECHANICAL ROOMS SHALL BE INSULATED WITH 1/2"THICK DUCT LINER FOR SOUND ATTENUATION. ,•"o" ..9 5.ALL OUTSIDE AIR DUCTWORK SHALL BE INSULATED WITH 1-1/2"DUCT WRAP. GF*` Itlls�. 6.EXHAUST DUCTWORK FROM THE EXTERIOR TO EXHAUST FANS SHALL BE INSULATED WITH 1-1/2"WRAP INSULATION. ON 7.DRYER VENT SHALL BE GALVANIZED SHEET METAL WITH ALL SEAMS SEALED. 8.PROVIDE BLUE DUCT FOR BELOW SLAB DUCTWORK. 9.THE STRUCTURE BETWEEN THE BASEMENT AND FIRST FLOORS IS A POST-TENSION (PT)SLAB. REFER TO THE STRUCTURAL DRAWINGS FOR ALL PT SLAB REQUIREMENTS. COORDINATE ALL SYSTEMS THROUGH THE SLAB OR SUPPORTED FROM THE SLAB. PRIOR TO SLAB INSTALLATION,ALL MECHANICAL, PLUMBING,AND ELECTRICAL SYSTEM CONNECTIONS, PENETRATIONS, SLEEVES, SUPPORTS,ANCHORS,AND HANGARS ARE TO BE INSTALLED. INSTALLATION OF THESE ITEMS AFTER PT SLAB IS INSTALLED WILL NOT BE ALLOWED WITHOUT COMPLETE STRUCTURE EVALUATION AND SIGNED APPROVAL OF THE STRUCTURAL ENGINEER. MECHANICAL AND ELECTRICAL CONTRACTORS TO REVIEW THREADED INSERT LAYOUT PRIOR TO INSTALLATION OF PT SLAB. COORDINATE ANY ADDITIONAL REQUIRED ANCHORS WITH GENERAL CONTRACTOR AND STRUCTURAL ENGINEER PRIOR TO CONCRETE INSTALLATION. 0 CDs ENGINEERING XE uwcxuE wo�.•,.,> YI 391w1 MR DSIENGINECRIN WWW.L RSIFXLIXEF RIXG.L OM N N U C l6 L1 N U C O9 N O U N L O Q E O C N tl9 C O N v= N O MN W C C N T-r E V/ V l6 7 N O HP-1 HP-1 HP-2 HP-2 HP-2 HP-2 HP-2 HP-1 •� u HP4-16 HP-1 HP-2 HP-3 HP-2 HP-2 HP-2 HP-2 HP1-1B HP-2 HP-1 HP-1 M „O„ ®®®®® ®®®®® ®®®®® ®®®® w a C ®®®®® ®®®®® ®®®®® ®®oo N HP2-2B HP-1 HP-3 HP-2 HP-2 HP-2 HP-2 HP-2 HP1-2B HP-2 HP-2 ^1�^1 � O HP3-2B HP-1 HP-2 HP-2 HP-2 HP-2 HP-2 HP-2 W o N O L m Q N 0— cf) Y U p o LJL�j V L_ 11 O � � m C) ROOF PLAN- HVAC DRAWN BY: RJA APPROVED BY: CLS DATE: 5/3/2021 PROJECT NO: 20001 IN ROOF PLAN-HVAC SCALE:1/8"=1'-0" M2 , 5B