HomeMy WebLinkAbout096 Roof Floor Plan - HVAC GENERAL NOTES
1.IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INCLUDING EQUIPMENT SUPPLIERS TO COORDINATE WITH EACH
OTHER AND TO VERIFY THAT THERE ARE NO CONFLICTS IN LOCATIONS OF DUCTS, CONDUITS,SPRINKLER HEADS,
SPRINKLER PIPING, DIFFUSERS, ELECTRICAL BOXES AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL MFGR
PLACEMENT OF MATERIALS.
2.REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION: DETAILED EQUIPMENT REQUIREMENTS,
INSTALLATION INSTRUCTIONS, PERFORMANCE REQUIREMENTS,CONTROL SEQUENCES AND ALL OTHER PROJECT DETAILS.
3.DUCTWORK SHALL BE GALVANIZED SHEET METAL. ROUND DUCTWORK SHALL BE SPIRAL OR SNAP-LOCK WITH ALL D E SIG N S
SEAMS SEALED.
4.RECTANGULAR SUPPLY AND RETURN DUCTWORK IN MECHANICAL ROOMS SHALL BE INSULATED WITH 1/2"THICK
DUCT LINER FOR SOUND ATTENUATION.
5.ALL OUTSIDE AIR DUCTWORK SHALL BE INSULATED WITH 1-1/2"DUCT WRAP. PO box 1001 Bozeman,MT 59771
6.EXHAUST DUCTWORK FROM THE EXTERIOR TO EXHAUST FANS SHALL BE INSULATED WITH 1-1/2"WRAP INSULATION.
7.DRYER VENT SHALL BE GALVANIZED SHEET METAL WITH ALL SEAMS SEALED.
8.PROVIDE BLUE DUCT FOR BELOW SLAB DUCTWORK.
.• c9
9.THE STRUCTURE BETWEEN THE BASEMENT AND FIRST FLOORS IS APOST-TENSION (PT) SLAB. REFER TO THE C
STRUCTURAL DRAWINGS FOR ALL *:PT SLAB REQUIREMENTS. COORDINATE ALL SYSTEMS THROUGH THE SLAB OR
SUPPORTED FROM THE SLAB. PRIOR TO SLAB INSTALLATION,ALL MECHANICAL, PLUMBING,AND ELECTRICAL SYSTEM i L.
CONNECTIONS, PENETRATIONS, SLEEVES, SUPPORTS,ANCHORS,AND HANGARS ARE TO BE INSTALLED. INSTALLATION O�
OF THESE ITEMS AFTER PT SLAB IS INSTALLED WILL NOT BE ALLOWED WITHOUT COMPLETE STRUCTURE EVALUATION
AND SIGNED APPROVAL OF THE STRUCTURAL ENGINEER. MECHANICAL AND ELECTRICAL CONTRACTORS TO REVIEW
THREADED INSERT LAYOUT PRIOR TO INSTALLATION OF PT SLAB. COORDINATE ANY ADDITIONAL REQUIRED ANCHORS ''11 �•a.....•••.,
WITH GENERAL CONTRACTOR AND STRUCTURAL ENGINEER PRIOR TO CONCRETE INSTALLATION. IU111N1\V\���
6
IU
�U
C
N
U
0 N C
m
C D S
0
EN GI NIEER^ING U
•7540 ChURCRiu1RD.
MXXRXt1.1X.XI 61
111 t
11R61 i6i)R62 `
NNM.CR61[XGIMFFRIME.EOM Q
E
0
C
N
C
O
N
N
a
N� o
6 y
C
O
y
C
d
E
CID
a ¢ a a a a a ¢ a
a a a a a a ¢ °
a
0
U
_N
a
� z
o
U
2
C
p O
U
P-2 HP-2 HP-2 HP-1 HP-2 HP_2 HP-2 HP-1 •—
HP-2 HP-2 HP-1 HP-2 HP-2 HP-1 HP-3 HP-1 HP-1 P-2 HP-2 H -1A
Q •M
W
m '
HP-1 HP-2 HP-1 HP-2 HP-3 HP-1 HP-1 HP-1 HP-1 P-3 HP-1 P-1
CH P-3 HP-2 HP-1 HP-2 HP-3 HP-2 HP-2 HP-2 4-1 CIO
^�
W
E N
O
L �
Q N
_ L
Q A--1
U O U
O 0
L �
m
U � O
ROOF FLOOR PLAN
- HVAC
DRAWN BY: RJA
APPROVED BY: CLS
DATE: 5/3/2021
PROJECT NO: 20001
N® ROOF FLOOR PLAN-HVAC
SCALE:1/8"=1•_0.. MA15