Loading...
HomeMy WebLinkAbout054 Landscape Planting Plan WestDND2S1D2D2D2D2D2D2D2D2D2D2D2D2D2D2D2D2D2D2D2S1S1S1S1S1S1D2D212345689REQUIRED PARKING LOT LANDSCAPING, SEE PARKING LOT LANDSCAPING TABLE CUSTOM CONCRETE AND STEEL SEAT WALLBIKE RACKS, SEE SHEET L3.0CONCRETE PLAZA PATIOCONCRETE CROSSWALKRETENTION BASINSTEEL PLANTER BOXESSTEEL EDGING EXISTING GRADESPROPERTY LINE10111213UTILITY EASEMENTPARKING LOT SCREENINGVISION TRIANGLEDOG WASTE STATION14TREE GRATE, SEE SHEET L3.015CONSTRUCTED BERM1617LANDSCAPE KEY NOTESSNOW STORAGESSRock Mulch Bed Areas Wildflower/Native Grass Blend Kentucky Bluegrass Sod Non-Irrigated Native Grass (Seed Planted)32,751 SF27,305 SF70,294 SF20,127 SFLANDSCAPE AREASLANDSCAPE NOTES1. Contractor shall review existing conditions and apply proposed grade grades (per Civil drawings) as necessary to achieve the intent of the plan. Final grading subject to the owners representative.2. Contractor shall locate verify existing conditions and existing utility locations prior to excavation.3. Contractor shall ensure a maximum of 4:1 slope for all sod areas. ref Civil.4. All plant material shall conform to the current American Standard for Nursery Stock.5. Verify all quantities. Illustrated plan shall dictate count.6. No substitutions will be allowed without the written consent of the Landscape Designer. 7. All sod and seed areas shall have a minimum of 4" of topsoil.8. All planting beds should have a minimum of 12" of prepared soil to promote plant growth. 9. All edging to shall be 1/8" by 4" steel (or otherwise specified in details.) Tac weld to #4 rebar every 6 feet apart angled in opposing directions driven minimum 12" deep.10. All planting beds shall have weed barrier installed between the soil and the covering layer of rock or mulch per plan, unless otherwise specified by Landscape Designer.11. All trees shall be staked with wooden stake, tie wire, and fabric tree straps for a minimum of 2 years.12. All areas on site disturbed by construction activities not indicated on landscape plan are to be reclaimed and re-established conditions with the use of seed approved by the Landscape Designer.13. Permanent underground irrigation system to be installed at the time of landscape installation. Irrigation to be installed in accordance with all state and local codes and ordinances.W Babcock St.Existing 9' Asphalt Trail5' - 0"Full Access ApproachSSSSSSSSSSOpen Space48,150 sfOpen Space 8,250 sf28' - 0"TTTTElec.24' - 0"Trash EnclosureTrash EnclosureClematis on Trellis5' - 0"SCALE:DRAWN:PROJECT NO:PO box 1001 Bozeman, MT 59771DATE:As indicated7/26/2022 5:17:41 PML2.0120001Landscape Planting PlanWestSix Range CondominiumsPaine Group4270 W Babcock Street, Bozeman MTBuilding Permitn288285555532288135126666662216886610991" = 20'-0"1Overall Landscape Plan West17175