Loading...
HomeMy WebLinkAbout027 Site PlanA3.01A3.01A3.01W Babcock St.Slough Creek Dr.S H anley A ve.Palisade Dr.Mill Creek Dr.S Ferguson Ave.20' - 0"Multi Family ResidentialMulti Family ResidentialExisting 9' Asphalt TrailPlayspace46' - 11"39'39'26'24'6'46'50' - 0"50' - 0"Park to the NorthTrash EnclosureTrash EnclosureTrash EnclosureRight-In, Right-OutFull Access ApproachFull Access ApproachFull Access ApproachSSSSSSSSSSSSSSSSSSSSSSUnderground Power EasementExisting drainage feature running parallel to Ferguson.See Civil Drawings for more information.ELEC.Open Space48,150 sfOpen Space 7,550 sfOpen Space22,600 sfTrail FrontageOpen Space3,325 sfWATER SERVICE7'TTTTIrrigation WellWell ControlsElec.Elec.24' - 0"Trash EnclosureTrash EnclosureTrash Enclosure60' - 0"24' - 0"LANDSCAPED24' - 6"A1.223Pedestrian Corridor10'-0" EasementA1.224Proposed Mailbox LocationCOVERED BIKE PKG. -20 SPACESCOVERED BIKE PKG. -10 SPACESCOVERED BIKE PKG. -28 SPACESBIKE PKG. -16 SPACESBIKE PKG. -8 SPACESLANDSCAPED230' - 0"L A N D S C A P E D252' - 1 0 "APPROX. STREAMLINE BUS STOP LOCATION-TYP. SHELTER -PROVIDED BY HRDC TO BE CONSTRUCTEDA1.211A1.224Sim.A1.224Sim.A1.224Sim.A1.224Sim.A1.224Sim.A1.21532' - 1"15' - 0"16' - 0"SSSS16' - 1"16' - 1"FENCED OPEN SPACE -320 SFFENCED OPEN SPACE -315 SFFENCED OPEN SPACE -352 SFFENCED OPEN SPACE -320 SFFENCED OPEN SPACE -315 SFFENCED OPEN SPACE -352 SFFENCED OPEN SPACE -320 SFFENCED OPEN SPACE -315 SFFENCED OPEN SPACE -352 SFFENCED OPEN SPACE -320 SFFENCED OPEN SPACE -315 SFFENCED OPEN SPACE -352 SFFHFHFHFHFHFHFHFHFH7'7' - 0"7'7' - 0"Setback15' - 0"Setback15' - 0"E.V. PARKING SPACECAR SHARE PARKING SPACE14A3.0123Parking96' - 8"85' - 6"Landscaped109' - 8"Parking60' - 0"LANDSCAPED283' - 6"PARKING24' - 0"LANDSCAPED287' - 9"42' - 3"PARKING82' - 7"110' - 0"MIXED103' - 7"LANDSCAPED17' - 5"Parking60' - 0"Landscaped313' - 6"7'7'7'7'6'7'FHTTTBuilding ABuilding BTriplexesB u ild in g CBuilding DTriplexesTRIPLEXES MAIL BOX4310432042204210430042501 5 5101 6' Solid Cedar Fencing6' Solid Cedar Fencing6' Solid Cedar Fencing6' Solid Cedar FencingOpen SpaceBuilding FootprintSnow StorageSidewalk SetbackBuilding SetbackProperty LineSite Plan LegendCrosswalkUtility Setback-Bike Rack -86 SpotsParking:Total:350 Total Parking Spaces-See parking table on A0.01-TransformerT-Junction BoxJ-Dry Well-Charging StationCHCovered ParkingSCALE:DRAWN:PROJECT NO:PO box 1001 Bozeman, MT 59771DATE:1" = 40'-0"8/8/2022 5:53:30 PMA1.0120001Overall Site PlanSix Range CondominiumsPaine Group4270 W Babcock Street, Bozeman MTBuilding Permit1" = 40'-0"1Site Plann