Loading...
HomeMy WebLinkAboutEngineering Report - WaterEngineering Report Water Main Extension Six Range Condominiums Development July 2022 Submitted to: City of Bozeman Engineering Department 20 East Olive Bozeman, MT 59715 Prepared by: Stahly Engineering and Associates 851 Bridger Drive, Suite 1 Bozeman, MT 59715 (406) 522-8594 Water Mains 1 8/8/2022 Water Main Extension Engineering Report Contents Note: The Engineering Report format follows DEQ-1 organization. Additional information required by the City of Bozeman Design Standards is added where required. Report Narrative 1.1.1 General Information 1.1.2 Extent of Water Works System 1.1.3 Alternate Plans 1.1.4 Site Conditions 1.1.5 Water Use Data 1.1.6 Flow Requirements 1.1.7 Sources of Water Supply 1.1.8 Proposed Treatment Processes 1.1.9 Sewage System Available 1.1.10 Waste Disposal 1.1.11 Automation 1.1.12 Project Sites 1.1.13 Financing 1.1.14 Future Extensions Figures and Tables Figure 1. Vicinity Map Figure 2. Water Plan Table 1. Domestic Water Design Flow Appendices Hydraulic Analysis Hydraulic Network Exhibit Water Mains 2 7/14/2022 1.1.1 General Information The proposed Six Range Condominiums Development is located southwest of the intersection of West Babcock Street and South Ferguson Avenue. The Six Range Condominiums Development consists of 3 large apartment buildings,4 triplexes, and a smaller commercial building. This project is located on a currently undeveloped 8.64-acre lot, Tract A1 of Minor Subdivision #338. The proposed apartment buildings consist of units ranging from one to three-bedrooms, and each triplex unit will be three bedrooms. The apartment buildings will provide 63 one-bedroom units, 102 two-bedroom units, and 15 three-bedroom units. The four triplexes will provide 12 additional three-bedroom units. The commercial building will provide 2500 sf of office space and 1300 sf of retail space. The project will be served by extension of City of Bozeman water and sewer mains throughout the project. City of Bozeman water and sewer mains currently exist in West Babcock St., Slough Creek Dr., and Mill Creek Dr. Individual service lines will be provided to each apartment, triplex, and the single commercial building. City of Bozeman water mains currently exist in Slough Creek Dr., W. Babcock St., and Mill Creek Dr. The developer’s contact information is: Paine Group Matt Paine P.O. Box 418 Bozeman, MT 59771 Water supply and wastewater treatment will be provided by the City of Bozeman’s municipal systems. The system owner’s contact information is: City of Bozeman Public Service Department PO Box 1230 Bozeman, MT 59771-1230 The location of the Six Range Condominiums Development is shown on the Vicinity Map in Figure 1. Water Mains 3 7/14/2022 Figure 1. Vicinity Map, Bozeman, Montana 1.1.2 Extent of Water Works System Water supply in this area is provided from an existing 12” main in West Babcock Street. On the west side of the lot, an 8” looping main is extended from the West Babcock Street main to provide service to the residences in the new development. South of the site, an 8” main runs along Palisade Drive providing service to the single-family residences in the adjacent development. A water main has been stubbed at the property line in the southeast corner of the lot from this main, which will be tied into with the Six Range project and looped. Water supply for the proposed development will primarily be provided by extending 8” mains within the site—making looped connections in Babcock, and Mill Creek Dr. The commercial building will be served off of a main extended from the 12” Babcock main. Along the southern portion of the lot, an 8” main will be extended north from the existing main in Mill Creek Drive, approximately 60 ft, then run east-west within the southern property boundary approximately 900. Another 8” main will branch off of the east-west main—running north and servicing the four triplexes and looping into the Babcock 12” main. Finally, another 8” extension off of the Water Mains 4 7/14/2022 12” Babcock main at the intersection of Kimball Ave to service Building B. A total of 9 fire hydrants are proposed for the development to provide adequate fire protection for the development. A total of 1,824 lineal feet of 8” water main is proposed. Each water main will run within a 30’ wide water/sewer easement, or within street rights-of-way. Individual water and fire service connections will be made for each building, with Building B having 2 service connections. The full extents of the existing and proposed water system can be seen in the attached C2.0 “Water Plan” included at the end of this report. Irrigation will be supplied by a well to be drilled on the southern portion of the site. The proposed water system improvements are shown on the Water Plan (Figure 2) at the end of this report. The development’s water main extension has been designed in accordance with Montana Department of Environmental Quality Circular 1, and the City of Bozeman Design Standards and Specifications Policy. Construction specifications will be Montana Public Works Standards and Specifications (MPWSS), and the City of Bozeman Modifications to MPWSS. New water main will be in 30’ wide water and sewer easements and street rights-of-way running through the property. 1.1.3 Alternate Plans Due to the project’s location within the City of Bozeman, extension of public mains was the only water supply alternative. Distribution alternatives were explored, and the proposed design was selected to provide main looping and eliminate dead ends. 1.1.4. Site Conditions The Six Range Condominiums Development is located at the southwest quadrant of the intersection of West Babcock Street and South Ferguson Avenue. The 8.64 acre lot is currently undeveloped. Adjacent development consists primarily of residential subdivisions. The lot is bounded by West Babcock Street, South Ferguson Avenue, South Hanley Drive to the west, and an asphalt path to the south. Due to the adjacent residential development, water, sewer, and shallow utilities are readily available for connection in the area. The Vicinity Map, seen in Figure 1 in this report, shows the existing conditions and surrounding development. A geotechnical evaluation was conducted by Allied Engineering and is provided in a separate appendix of this submittal. The soil conditions Water Mains 5 7/14/2022 across the site are consistent. The geotechnical investigation revealed that the site consists of predominantly native soils including 12 to 18 inches of topsoil overlaying sandy gravel. A DIPRA analysis was conducted for the site and determined that neither zinc-coated pipe nor V- Bio wrap is necessary for the new water main materials. Full geotechnical evaluation results are available in the attached Appendix A. Groundwater monitoring was conducted throughout the 2022 groundwater season. During the initial site evaluation and monitoring well installation, groundwater depths ranged from 5-6’ below existing grade. Based on these results, seasonally high groundwater is assumed to be at least 5’ below existing grade. The site is not located within a 100-year floodplain. Storm Drainage Plan Description 1.1.5. Water Use Data Domestic water will be provided by the City of Bozeman Municipal system. This project is located within the planned service area of the City’s system. Estimated water use for the Six Range Condominiums development has been determined utilizing values provided in City design standards and Facility Plans and is shown in Table 1. For water main sizing, typical City design flows are utilized. Because the water system will not supply irrigation, large summer peaks are not anticipated. Typical design flow water use is 65 gallons per day (gpd) per capita, with an average of 2.17 people per dwelling. To estimate peak flows, a peaking factor of 4.5 was used to determine the peak hour flow rate. The estimated total project design flow is 27,175 gpd with a peak hour flow of 84.91 gpm. Water Mains 6 7/14/2022 Table 1 – Domestic Water Design Flow Estimated Domestic Water and Sewer Demands Residential #Units Capita/Unit Gpd/Capita Gpd/Unit Gallons/Day Building A 48 2.17 65 141 6,770 Building B 75 2.17 65 141 10,579 Building C 57 2.17 65 141 8,040 Triplexes 12 2.17 65 141 1,693 Non-Residential Area (Sf) Gpd/1,000 Sf Gallons/Day Office Space 2,500 30 75 Retail Space 600 30 18 Total Domestic Design Flow (Gpd) 27,175 Average Day Demand (Gpm) 18.87 Peaking Factor 4.5 Peak Hour (Gpm) 84.91 Total Estimated Annual Use (Ac/ft) 30.44 Irrigation will be provided by a new well located at the south end of the site as shown on Figure 2. Irrigation lines will provide water to site landscaping and will be maintained by the property owner. The estimation of the domestic water demand for each building is based on proposed building use, utilizing standard City of Bozeman design values. Payment of cash-in-lieu of water rights will be used to provide water rights for this project. At $6,000 per ac-ft/yr, the estimate for CILWR fee is $182,649.10. 1.1.6. Flow Requirements As stated previously, the peak hour water demand is estimated to be 84.91 gpm. Stahly produced a hydraulic model of the site as it fits into the City of Bozeman’s water distribution system and calibrated the model based on a hydrant flow test conducted by the City of Bozeman on July 7, 2022 (see enclosed flow report in the appendix). The hydraulic model shows that fire flows are expected to be 3500 gpm on the Six Range site without dropping below 20 psi in the system. The 2017 City of Bozeman Water Facility Plan did not identify any fire flow capacity limitations in this area. Water Mains 7 7/14/2022 1.1.7. Sources of Water Supply This section is not applicable. 1.1.8. Proposed Treatment Process This section is not applicable. 1.1.9 Sewage System Available Sewer service is provided by new City mains extended through the site from the existing sewer main in W. Babcock St. Sewers will be approximately 8-10 feet deep and primarily cross below water mains and services. 1.1.10 Waste Disposal This section is not applicable. 1.1.11 Automation This section is not applicable. 1.1.12 Project Sites This section is not applicable. 1.1.13 Financing This section is not applicable. 1.1.14 Future Extensions No future extensions of this main are anticipated, as surrounding properties have all been previously developed. W. BABCOCK ST. (90' ROW)N. FERGUSON AVE. (50' ROW) S. HANLEY AVE.KIMBALL AVE.HANLEY AVE.SLOUGH CREEK DR.PROFESSIONALENGINEERS &SURVEYORSSIX RANGE CONDOMINIUMS STAHLYENGINEERING& ASSOCIATESPAINE GROUP BOZEMAN MONTANAC2.0WATER PLAN Appendix A: Hydraulic Anaylsis W. BABCOCK ST. (90' ROW)N. FERGUSON AVE. (50' ROW) S. HANLEY AVE.KIMBALL AVE.HANLEY AVE.RAVALLI ST.SLOUGH CREEK DR.FLOW (GPM)1,680130OBSERVED HYDRANT COMPARISONMEASUREDMODELSTATIC (PSI)RESIDUAL (PSI)1201201,680130FIRE FLOW AVAILABLEHYDRANT IDFLOW (GPM)H1013,500H102H103NOTE: FIRE FLOW CRITERIA IS MINIMUMOF 20 PSI IN SYSTEM. THIS CONDITION ISSTILL SATISFIED AT 3,500 GPM AT ALLPROPOSED HYDRANTS.H105H106H107H108H109H1043,5003,5003,5003,5003,5003,5003,5003,500NEW HYDRANT (H106)NEW HYDRANT (H101)NEW HYDRANT (H102)NEW HYDRANT (H104)NEW HYDRANT (H105)EX. HYDRANT (OBSERVEDHYDRANT IN FIELD TESTS)EX. HYDRANT (FLOWINGHYDRANT IN FIELD TESTS)NEW HYDRANT (H103)NEW HYDRANT (H107)NEW HYDRANT (H108)NEW HYDRANT (H109)NEW 8" WATER LINENEW 8" WATER LINENEW 8" WATER LINENEW 8" WATER LINENEW 8" WATER LINENEW MAX DAY DEMAND FOR PROP.CONSTRUCTION MODELED AT 80.5GPM (16.1 GPM EACH, PLACED ATNODES J101, J102, J103, J107, J108)BABCOCK ST. MAX DAYDEMAND MODELED AT300 GPMEX. 8" WATER LINEEX. 8" WATER LINEEX. 8" WATER LINEEX. 8" WATER LINEEX. 8" WATER LINEEX. 12" WATER LINETOWN SUPPLY MODELEDAS RESERVOIR ANDCALIBRATED TO FIELDMEASUREMENTS. .CONNECTION TOEX. SYSTEMCONNECTION TOEX. SYSTEMCONNECTION TOEX. SYSTEMCONNECTION TOEX. SYSTEMCONNECTION TOEX. SYSTEMSCALE:DRAWN:PROJECT NO:3081-001204270 W Babcock Street, Bozeman MT Contractor Note: All site conditions and dimensions to be varified on-site. Inform Architect of design discrepancies.PO box 1001 Bozeman, MT 5977107/11/2022DATE:PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESSix Range Condominiums WaterCAD Figure Paine GroupFig. 2 CITY OF BOZEMAN HYDRANT PRESSURE/FLOW REQUEST FORM Date: 7/7/2022 Location Hydrant # Static Pressure Pitot Pressure Residual Pressure W Babcock & Clifton Dr 1543 84 1135 130 120 Requested By: Zach Lowe (Stahly Engineering) Phone # 406-522-8594 Nozzle Size Flowed: 2.5” Done By: MT / CM Comments: 1,680 GPM Fire Flow Node FlexTable: Fire Flow Report Junction w/ Minimum Pressure (Zone) Pressure (Calculated System Lower Limit) (psi) Junction w/ Minimum Pressure (System) Pressure (Calculated Residual) (psi) Fire Flow (Available) (gpm) Label J101105J101743,500H101 J102105J102703,500H102 J10498J104643,500H103 J106107J106723,500H104 J109104J109723,500H105 J110104J110713,500H106 J111103J111693,500H107 J11392J113613,500H108 J7-1118J7-1833,500H109 Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 7/11/2022 WaterCAD [10.03.02.75] Bentley Systems, Inc. Haestad Methods Solution Center3081-00120 WaterCAD.wtg FlexTable: Junction Table Pressure (psi) Hydraulic Grade (ft) Demand (gpm) Elevation (ft) Is Active?Label 1345,113.9504,805.00TrueH3 1305,113.9604,813.00TrueH4 1345,113.9604,805.00TrueH5 1315,114.4904,811.00TrueH101 1305,114.3704,814.00TrueH102 1315,114.1204,812.00TrueH103 1305,114.1004,813.00TrueH104 1295,113.9804,815.00TrueH105 1285,114.0004,817.00TrueH106 1285,114.0404,819.00TrueH107 1305,114.0604,814.00TrueH108 1295,114.0004,815.00TrueH109 1315,113.9804,812.00TrueHYD-1135 1335,114.0204,807.00TrueHYD-1543 1315,114.9104,812.00TrueJ-35 1315,114.4904,810.55TrueJ2-1 1325,114.3804,810.14TrueJ2-2 1325,114.1604,809.31TrueJ2-3 1325,114.0404,808.58TrueJ2-4 1345,114.0204,805.00TrueJ3 1335,114.0204,807.00TrueJ3B 1325,113.9804,808.00TrueJ4 1335,113.8904,806.00TrueJ5 1365,113.793004,800.00TrueJ6 1345,113.9904,805.00TrueJ7 1345,114.0004,805.00TrueJ7-1 1345,113.9704,805.00TrueJ8 1345,113.9604,805.00TrueJ9 1345,113.9604,805.00TrueJ10 1345,113.9604,805.00TrueJ11 1345,113.9704,805.00TrueJ12 1345,113.9604,805.00TrueJ13 1345,113.9304,805.00TrueJ14 1345,113.8904,805.00TrueJ15 1345,113.8704,805.00TrueJ16 1345,113.9504,805.00TrueJ17 1345,113.9404,805.00TrueJ18 1345,113.9004,805.00TrueJ19 1345,113.7804,805.00TrueJ20 1345,113.9904,805.00TrueJ21 1345,113.9904,805.00TrueJ22 1345,113.9204,805.00TrueJ23 1345,113.723004,805.00TrueJ26 1305,114.49164,815.00TrueJ101 1305,114.37164,815.00TrueJ102 1295,114.12164,815.00TrueJ103 1295,114.1204,815.00TrueJ104 1295,114.1004,815.00TrueJ105 1295,114.1004,815.00TrueJ106 Page 1 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 7/11/2022 WaterCAD [10.03.02.75] Bentley Systems, Inc. Haestad Methods Solution Center3081-00120 WaterCAD.wtg FlexTable: Junction Table Pressure (psi) Hydraulic Grade (ft) Demand (gpm) Elevation (ft) Is Active?Label 1295,114.06164,815.00TrueJ107 1295,113.98164,815.00TrueJ108 1295,113.9804,815.00TrueJ109 1295,114.0004,815.00TrueJ110 1295,114.0404,815.00TrueJ111 1295,114.0604,815.00TrueJ113 Page 2 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 7/11/2022 WaterCAD [10.03.02.75] Bentley Systems, Inc. Haestad Methods Solution Center3081-00120 WaterCAD.wtg FlexTable: Pipe Table Is Active?Length (User Defined) (ft) Length (Scaled) (ft) Velocity (ft/s) Flow (gpm) Minor Loss Coefficient (Local) Hazen- Williams C MaterialDiameter (in) Stop NodeStart NodeLabel True0100.0002.700130.0Ductile Iron6.0J3BHYD-1543HL1 True0110.0002.700130.0Ductile Iron6.0J4HYD-1135HL2 True0170.0002.700130.0Ductile Iron6.0H3J17HL3 True0230.0002.700130.0Ductile Iron6.0J9H4HL4 True0200.0002.700130.0Ductile Iron6.0H5J10HL5 True0130.0002.700130.0Ductile Iron6.0H101J101HL101 True0210.0002.700130.0Ductile Iron6.0H102J102HL102 True0210.0002.700130.0Ductile Iron6.0H103J104HL103 True0220.0002.700130.0Ductile Iron6.0H104J106HL104 True0110.0002.700130.0Ductile Iron6.0H105J109HL105 True0120.0002.700130.0Ductile Iron6.0H106J110HL106 True0110.0002.700130.0Ductile Iron6.0H107J111HL107 True0110.0002.700130.0Ductile Iron6.0H108J113HL108 True050.0002.700130.0Ductile Iron6.0H109J7-1HL109 True05840.11170.000130.0Ductile Iron8.0J5J19J5-2 True1,500191.455100.000130.0Ductile Iron12.0J-35R1P1 True500170.271700.000130.0Ductile Iron16.0J22R2P1-2 True05751.455100.000130.0Ductile Iron12.0J2-1J-35P2-1 True01631.404940.000130.0Ductile Iron12.0J2-2J2-1P2-2 True03311.364780.000130.0Ductile Iron12.0J2-3J2-2P2-3 True02891.073790.000130.0Ductile Iron12.0J2-4J2-3P2-4 True0980.802830.000130.0Ductile Iron12.0J3J2-4P3 True0630.0000.000130.0Ductile Iron8.0J3J3BP3B True01700.802830.000130.0Ductile Iron12.0J4J3P4 True03360.802830.000130.0Ductile Iron12.0J5J4P5 True03700.853000.000130.0Ductile Iron12.0J6J5P6 True01760.61960.000130.0Ductile Iron8.0J7-1J2-4P7-1 True0350.61960.000130.0Ductile Iron8.0J7J7-1P7-2 True04160.29-450.000130.0Ductile Iron8.0J7J8P8 True0470.29-450.000130.0Ductile Iron8.0J8J9P9 True03150.0110.000130.0Ductile Iron8.0J10J9P10 True04240.0110.000130.0Ductile Iron8.0J11J10P11 Page 1 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 7/11/2022 WaterCAD [10.03.02.75]Bentley Systems, Inc. Haestad Methods Solution Center3081-00120 WaterCAD.wtg FlexTable: Pipe Table Is Active?Length (User Defined) (ft) Length (Scaled) (ft) Velocity (ft/s) Flow (gpm) Minor Loss Coefficient (Local) Hazen- Williams C MaterialDiameter (in) Stop NodeStart NodeLabel True01490.33-510.000130.0Ductile Iron8.0J12J11P12 True0340.33-520.000130.0Ductile Iron8.0J11J13P13 True04610.33-520.000130.0Ductile Iron8.0J13J14P14 True05520.29-460.000130.0Ductile Iron8.0J14J15P15 True02830.29-460.000130.0Ductile Iron8.0J15J16P16 True01970.28-440.000130.0Ductile Iron8.0J9J17P17 True02840.28440.000130.0Ductile Iron8.0J18J17P18 True01640.61950.000130.0Ductile Iron8.0J19J18P19 True07480.50-780.000130.0Ductile Iron8.0J19J20P20 True0590.33510.000130.0Ductile Iron8.0J21J7P21 True06650.33-510.000130.0Ductile Iron8.0J21J18P22 True06710.481700.000130.0Ductile Iron12.0J23J22P23 True04870.501760.000130.0Ductile Iron12.0J16J23P24 True06150.632220.000130.0Ductile Iron12.0J20J16P25 True02110.853000.000130.0Ductile Iron12.0J26J20P26 True01,3270.04-60.000130.0Ductile Iron8.0J14J23P27 True01810.10160.000130.0Ductile Iron8.0J101J2-1P101 True01660.10160.000130.0Ductile Iron8.0J102J2-2P102 True01510.63990.000130.0Ductile Iron8.0J103J2-3P103 True01720.0000.000130.0Ductile Iron8.0J104J103P104 True01310.53830.000130.0Ductile Iron8.0J105J103P105 True0110.0000.000130.0Ductile Iron8.0J106J105P106 True02440.53830.000130.0Ductile Iron8.0J107J105P107 True0590.33-510.000130.0Ductile Iron8.0J108J12P108 True0360.0000.000130.0Ductile Iron8.0J109J108P109 True01830.43-670.000130.0Ductile Iron8.0J110J108P110 True03080.43-670.000130.0Ductile Iron8.0J111J110P111 True01310.43-670.000130.0Ductile Iron8.0J107J111P112 True01470.0000.000130.0Ductile Iron8.0J113J107P113 Page 2 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 7/11/2022 WaterCAD [10.03.02.75]Bentley Systems, Inc. Haestad Methods Solution Center3081-00120 WaterCAD.wtg