Loading...
HomeMy WebLinkAboutEngineering Report - Sewer Engineering Report Sewer Main Extension Six Range Condominiums Development July 2022 Submitted to: City of Bozeman Engineering Department 20 East Olive Bozeman, MT 59715 Prepared by: Stahly Engineering and Associates 851 Bridger Drive, Suite 1 Bozeman, MT 59715 (406) 522-8594 Sewer Mains 1 8/8/2022 Sewer Main Extension Engineering Report Contents Note: The Engineering Report format follows DEQ-2 organization. Additional information required by the City of Bozeman Design Standards is added where required. Report Narrative Chapter 10 – Engineering Reports & Facility Plans 11.1 Engineering Report - General Information 11.11 Problem Defined 11.12 Design Conditions 11.13 Impact on Existing Wastewater Facilities 11.14 Project Description 11.15 Drawings 11.16 Design Criteria 11.17 Site Information 11.18 Alternate Selection/Analysis 11.19 Environmental Impacts Figures and Tables Figure 1. Vicinity Map Figure 2. Sewer Plan Table 1. Wastewater Generation and Conveyance Capacity Sewer Mains 2 7/14/2022 11.1 Engineering Report – General Information The proposed Six Range Condominiums Development is located southwest of the intersection of West Babcock Street and South Ferguson Avenue. The Six Range Condominiums Development consists of 3 large apartment buildings,4 triplexes, and a relatively small commercial building. This project is located on a currently undeveloped 8.64-acre lot, Tract A1 of Minor Subdivision #338. The proposed apartment buildings consist of units ranging from one to three- bedrooms, and each triplex unit will be three bedrooms. The apartment buildings will provide 63 one-bedroom units, 102 two-bedroom units, and 15 three-bedroom units. The four triplexes will provide 12 additional three-bedroom units. The commercial building will provide 2500 sq ft of office space and 1300 sf of retail space. The project will be served by extension of City of Bozeman sewer mains throughout the project. Individual service lines will be provided to each apartment building, triplex, and the single commercial building. City of Bozeman sewer mains currently existing in W. Babcock St., and Slough Creek Dr. The 10” sewer main in W. Babcock St. terminates just past Kimball Dr. The 8” main in Slough Creek Dr. extends to a manhole located in the drive access on the site, it then conveys north where it connects to the W. Babcock St. main. The developer’s contact information is: Paine Group Matt Paine P.O. Box 418 Bozeman, MT 59771 Water supply and wastewater treatment will be provided by the City of Bozeman’s municipal systems. The system owner’s contact information is: City of Bozeman Public Service Department PO Box 1230 Bozeman, MT 59771-1230 The location of the Six Range Condominiums Development site is shown on the Vicinity Map in Figure 1. Sewer Mains 3 7/14/2022 Figure 1. Vicinity Map, Bozeman, Montana 11.11 Problem Defined Sanitary sewer service will be provided by 3 new 8” main extensions, each extending off of the existing 10” main in Babcock Street. Services will connect each individual structure to the new main extensions. The easternmost extension extends the existing main 140 feet east, within the Babcock ROW, and heads south into the proposed development. Service for the commercial building (Building D) will be connected to this extension. Both of the remaining extensions are 8” mains extended south from new manholes on the existing main in Babcock. The easterly service of these two extensions runs approximately 190 ft south underneath the proposed drive aisle and parking lot, terminating in a new manhole. Two of the three large apartment buildings will be served by this extension. The western main extension extends 151 feet south, before tee-ing off into a 320 foot east-west length of pipe that serves each of the triplex buildings.. Finally, from the westernmost end of this length of pipe, a final 185 length of main is extended south. The two remaining apartment buildings will connect to this main, with Building A featuring two connections. Sewer Mains 4 7/14/2022 A total of 893 linear feet of 8” sewer main is proposed to serve the development. Twelve new manholes are proposed, with 3 of the proposed manholes installed on the existing main in Babcock. All proposed main extensions will run within 30’ water/sewer easements or within street rights- of-ways. A total of 9 service connections will be made to these extensions, with Building B utilizing two service connections. 11.12 Design Conditions Sanitary sewer service will be provided by the City of Bozeman Municipal system. This project is located within the planned service area of the City’s system. Estimated wastewater generation for the Six Range Condominiums development has been determined utilizing values provided in City design standards and Facility Plans and is shown in Table 1. For sewer main sizing, typical City design flows are utilized. Typical design flow for sewer use is 65 gallons per day (gpd) per capita, with an average of 2.17 people per dwelling. Both office and retail space are estimated to use 30 gpd/1000 sf of floor space. To estimate peak flows, a peaking factor of 4.5 was used to determine the peak hour flow rate. The estimated total project design flow is 27,042 gpd with a peak hour flow of 84.51 gpm. Table 1 – Wastewater Generation Estimated Sewer Use and Demands On-site Residential #Units Capita/Unit Gpd/Capita Gpd/Unit Gallons/Day Building A 48 2.17 65 141 6,770 Building B 75 2.17 65 141 10,579 Building C 57 2.17 65 141 8,040 Triplexes 12 2.17 65 141 1,693 Non-Residential Area (Sf) Gpd/1,000 Sf Gallons/Day Office Space 2,500 30 75 Retail Space 600 30 18 Total Domestic Use 27,175 Sewer Infiltration Area (Ac) Infiltration (Gal/Ac/Day) Gallons/Day Onsite 8.64 150 1,296 Total Sewer Design Flow (Gpd) 28,453 Average Day Demand (Gpm) 19.76 Peaking Factor 4.5 Peak Hour (Gpm) 88.91 Sewer Mains 5 7/14/2022 Capacity of 8" SDR 35 PVC Sewer Pipe Status Proposed Location 6 Range Pipe Material 8" SDR 35 PVC Pipe Diameter (in) 8 Minimum Pipe Slope (ft/ft) 0.004 Coefficient of Roughness (n) 0.013 Depth in Pipe at 75% Full (in) 6 Depth of Flow (ft) 0.5 Pipe Radius (in) 4 Pipe Radius (ft) 0.33 Wetted Perimeter 1.40 Area of Flow (ft2) 0.28 Hydraulic Radius 0.20 Velocity (ft/sec) 2.48 Maximum Pipe Flowrate (gpm) 312.8 Peak Hour Flow (gpm) 88.91 Peak Flow % of Max Capacity 28.42% Table 2, above, shows that an 8” sewer main has a 75% flow depth capacity of 313 gpm installed at a minimum slope of 0.4%. An 8” sewer main at minimum slope (0.4%) has sufficient capacity to provide sewer service for the Six Range Condominiums Development. 11.13 Impact on Existing Wastewater Facilities A review of the City of Bozeman 2015 Wastewater Facility Plan identifies future capacity limitations in the collection system downstream of this project impacting a large portion of Bozeman. This limitation is not directly caused by this project, and upgrades to Bozeman’s collections system to rectify these limitations have been identified as “future improvements”, the designation for limitations that are not urgent. The capacity within the Valley West Sewer trunk main was evaluated after possible capacity issues were raised by the City of Bozeman Engineering Department. By reviewing the “Valley West Sewer Trunk Line” design report (Morrison-Maierle, 1998), we determined that the original design of the trunk main allocated less demand from the proposed Six Range site, but quite a bit more demand from the adjacent Cottonwood Condominiums. The “Design Report Water, Sewer and Stormwater Management Sewer Mains 6 7/14/2022 Cottonwood Condominiums” (C&H Engineering, 2004) estimated 4,389 gpd on an average day (excluding infiltration), and the Morrisson-Maeirle study allocated 44,697 gpd from the Cottonwood Condominiums. This 40,000 gpd discrepancy more than makes up for the discrepancy of the Six Ranges site, where the Morrison-Maeirle report estimated 13,445 gpd and we have calculated 27,175 gpd for the developed site. 11.14 Project Description The project description is provided at the beginning of the Engineering Report. 11.15 Drawings Please see Figure 2, the Sewer Plan, at the end of this report, which shows the proposed sewer improvements. Plan and profile drawings will be submitted with the infrastructure design submittals. 11.16 Design Criteria The Six Range Condominiums Development sewer main extensions will be designed in accordance with Montana Department of Environmental Quality Circular 2, and the City of Bozeman Design Standards and Specifications Policy. Construction specifications will be Montana Public Works Standards and Specifications (MPWSS), and the City of Bozeman Modifications to MPWSS. 11.17 Site Information The Six Range Condominiums Development project is located on the southwest quadrant of Babcock Ave. and Ferguson Ave. and is currently undeveloped. Adjacent development consists primarily of residential subdivisions. The lot is bounded by West Babcock Street, South Ferguson Avenue, South Hanley Drive to the west, and an asphalt path to the south. Due to the adjacent residential development, water, sewer, and shallow utilities are readily available for connection in the area. The Vicinity Map, seen in Figure 1 in this report, shows the existing conditions and surrounding development. A geotechnical evaluation was conducted by Allied Engineering and is provided in a separate appendix of this submittal. The soil conditions across Sewer Mains 7 7/14/2022 the site are consistent. The geotechnical investigation revealed that the site consists of predominantly native soils including 12 to 18 inches of topsoil overlaying sandy gravel. Full geotechnical evaluation results are available in the attached appendix. Groundwater monitoring was conducted throughout the 2021 groundwater season. During the initial site evaluation and monitoring well installation, groundwater depths ranged from 5-6’ below existing grade. Based on these results, seasonally high groundwater is assumed to be at least 5’ below existing grade. The site is not located within a 100-year floodplain. 11.18 Alternative Selection/ Analysis Due to the project’s location within the City of Bozeman, extension of public mains was the only sewer collection alternative. Other configurations of main extensions were considered during design. The selected design was chosen as the best fit with the site’s constraints and requirements. 11.19 Environmental Impacts Continued use and new extensions of City of Bozeman municipal sewer mains has the least environmental impact. No new environmental impacts will be caused by these sewer main extensions. W. BABCOCK ST. (90' ROW)N. FERGUSON AVE. (50' ROW) S. HANLEY AVE. KIMBALL AVE. HANLEY AVE.SLOUGH CREEK DR.S Hanley Ave.Palisade Dr.Mill Creek Dr.SCALE:DRAWN:PROJECT NO:3081-001204270 W Babcock Street, Bozeman MT Contractor Note: All site conditions and dimensions to be varified on-site. Inform Architect of design discrepancies.PO box 1001 Bozeman, MT 5977112/13/2021DATE:PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESSix Range Condominiums Site Plan Submittal Paine Group DRC Site Plan Resubmittal 2021.12.08FIGURE21" = 40'Sewer Plan