FROM: MFGR DESIGNS
RE: SIX RANGE CONDOMINIUMS SITE PLAN, APPLICATION 21235 COMMENTS
DATE: 01/10/2022
----------------------------------------------------------------------------------------------------------
Project Description:This project is a Site Plan for a multi-family development to include three
apartment buildings and four three-plex buildings that will contain 182 units and approximately
7,000 square feet of commercial/retail space on 8.638 acres. The property is zoned R-O.
Project Location:Property is located at 4720 West Babcock Street and legally described as
Lot A1 of Minor Subdivision 338, S10, T02 S, R05 E, City of Bozeman, Gallatin County, MT.
_________________________________________________________________________
Section 1 – Conditions of Approval & Advisory Comments
Please note that these conditions are in addition to any required code provisions identified in
this report. The following conditions are specific to the development:
1.The applicant is advised that unmet code provisions, or code provisions that are not
specifically listed as conditions of approval, does not, in any way, create a waiver or
other relaxation of the lawful requirements of the Bozeman Municipal Code or state law.
2.The Cash-in-lieu Water Rights (CILWR) contribution must be paid to the City in full prior
to final plan approval.
3.Please provide proof of legal access to S Hanley and the adjacent trail to the south. This
could be easements recorded on adjacent lots including S Hanley Ave access easement
recorded on Lot 2B Minor Sub #365A, 30’ Lineal Park/Trail Easement Per MS#295 on
Lot 2B Minor SUB #365A. In addition, as builts for the adjacent Cottonwood
Condominiums show an access easement from Mill Creek Ave that is not indicated on
your existing conditions plat. Please either show the adjacent plat indicating the
presence or lack thereof an easement, or provide the recorded easement.
a.Attached is a Final Plat for the adjacent Cottonwood Condominiums (See
Cottonwood Condominiums Final Plan) which depicts an existing 60ft wide
access and utility easement along the West side of the property which should
suffice as access to Hanley Avenue and the SW entrance for this development.
All use of property alongside Hanley for stormwater and landscaping has been
removed from the site plan. Should the city determine this easement as
insufficient, we will abandon the SW entrance for this development.
4.BMC 38.540.050.A.3.a. Landscaping in lieu of parking.Staff does not support this
reduction as it does not meet the exception criteria outlined in Section 38.540.050.A.3
which states the appropriate situations for landscaping in lieu are “existing lots which
have no landscaping, irregular lots, lots with topographic difficulties, etc.”.
a.The parking calculation no longer incorporates the reduction based on
Landscaping in lieu of parking.
5.The USPS has recently made the City of aware of their policy for Mail Carriers to not
leave their vehicles to deliver mail to interior mail rooms. Contact Jenny Connelley,
jconnelley@bozeman.net with any questions.
a.Mail delivery has been relocated. (See Site Plan - A1.01.)
Section 2 – Required Code Corrections
Community Development Department, Development Division, Lynn Hyde,
lhyde@bozeman.net , 406-579-1471
1.Condominiums
a.BMC 38.360.100 requires condominiums to provide bylaws for the condominium
association as well as covenants, conditions and restrictions.These are required
to be provided to the city for review and approval prior to final plan approval.
i.Paine Group is currently drafting condominium documents and will
provide for city review prior to final plan approval.
2.Townhouse and rowhouse dwellings.
a.BMC 38.360.250.E.requires townhomes to provide open space at least equal to
ten percent of the building livable space (not counting automobile storage).
Provide livable space calculations and show how the open space is meeting the
requirements here within. If you are proposing the front yard as open space,
show how it’s meeting the requirements of 38.360.250.E.1 which includes
providing a fence spec meeting the standards of section 38.350.060.
i.See fence detail on AT1.01.
3.Building Design
a.BMC 38.530.040.B.1.Façade articulation storefronts and other buildings with
non-residential uses on the ground level must include a minimum of three of the
following articulation features every 60 feet (maximum) to create a human scaled
façade pattern.Building D’s northern elevation needs to provide an additional two
of these items (currently only windows are provided).
i.The North facade of D now includes windows, change in building
materials and vertical building modulation of at least 12 inches in depth if
tied to a change in building material. (See AD3.01, North Elevation)
b.BMC 38.530.040.E.Maximum façade width. Building facades wider than 150 feet
must include at least one of the following features to break up the massing of the
building and add visual interest. [refer to code]Building A, B, and C are not
meeting this requirement and need to be redesigned to break up the massing of
the buildings.
i.The Applicant is requesting a departure from BMC 38.530.040.E. The
resubmittal provides additional rendered perspectives depicting the
variations of the facade. The design has implemented balconies,
recessed decks and recessed window openings to provide additional
architectural character within the facade (See A9.01 - A9.15 )
4.BMC 38.400.010A.2.Relation to developed area. The developer must arrange the
streets and alleys to provide for continuation of streets and alleys between adjacent
developed properties when such continuation is necessary for the convenient movement
of traffic, effective provision of emergency services and efficient provision of utilities.The
original concept review submitted showed access to Mill Creek Drive. In addition, follow
up correspondence between staff and design team continued to iterate the desire to
have access to these roads to create a more complete street network. It appears
easements were approved with the original Cottonwood Condominiums to the south.
The reason and intent behind those easements remain the same which is why they were
required to provide them originally.
a.Following our conversation with the City of Bozeman's planning and engineering
departments (on 11/17), it was determined that Mill Creek Drive should not be
pursued as a vehicular traffic street. See current site plan which now includes a
pedestrian pathway to the southern property boundary. Hopefully this will be able
to extend to the South Cottonwood Condo development if the HOA determines
favorably to approve that connection.
b.An opinion on Mill Creek Drive by our traffic engineer for the project is also
attached. (See attached PDF “Traffic Impact Study”)
5.BMC 38.400.100 – Extend street vision triangles into the right-of-way as required per
City of Bozeman Site Plan checklist. If street trees are located in the triangle, ensure
they are meeting the requirements of 38.400.100.D Provision for trees in street vision
triangle.
a.Vision triangles have been remedied, and trees have been moved to no longer
interfere. (See Landscape Plan, Sheet L1.01)
6.BMC 38.410.040.D.Rights-of-way for pedestrians. Rights-of-way not less than ten feet
wide for pedestrian walks are required where deemed necessary to provide circulation or
access to parks, open space, schools, playgrounds, shopping centers, transportation,
and other community facilities. In addition, no continuous length of block may exceed
600 feet without intersecting a street or pedestrian walk.Show where you are proposing
this corridor and how it is meeting the standards found within, including setbacks
adjacent to pedestrian rights-of-way less than 30 feet wide must not be less than 10’,
and must comply with provisions of section 38.400.080. A pedestrian easement that
meets 38.410.060 will be required as well.
a.Pedestrian Walkway has been delineated and revised in order to meet these
standards. (See Site Plan)
7.BMC 38.510.030.C Block frontage standards
a.Call out block frontages on your site plan (including block frontage standards
along sidewalks and internal pathways)
i.Block frontages are now shown on site plan.
b.Building entrances – for uses that front on multiple mixed designated block
frontages, an entry along both streets is encouraged, but not required.
i.Although it is not required, an entrance along the northern façade of
Building D.
1.We are not providing an additional entrance as it is not required.
ii.Building A requires an entrance to be visible and directly accessible from
the street. Currently all entrances are accessed from the internal parking
lot. Adding an entrance on the northern façade would address this.
1.Building A northern stair entrance has been moved to the northern
facade. (See Sheet AA2.10)
c.Provide weather protection at least 3’ deep over primary business and residential
entries.Please show your weather protection proposed and that it is meeting this
standard. It does not appear that many of the entries are meeting this
requirement.
i.All main entries to residential units have at least a 3’ deep weather
protection coverings. (See Site Plan) The main entrances for Building D
both have a weather protective vestibule that are at least 3’ deep (See
AD2.01).
d.BMC 38.510.030.J. Special residential block frontage standards along sidewalks
and internal pathways.Show which treatment you are proposing for your semi
private area as required herewithin. Anywhere the ground floor residential (and
windows) is adjacent to a sidewalk.
i.As shown in the Overall site plan, the triplexes exceed the minimum
setback (10’) of Semi-private patio space screened by a low fence.
ii.The main entrances for the condominiums are using the raised deck or porch
option. As shown in the site plan, the depth for the front porches of the
condos are exceeding the minimum depth of 6’ from the face of the building.
The area of the porches range from 88 square feet to 112 square feet,
exceeding the minimum of the 60 square feet required. These porches are
raised at least 1’ over grade.
e.Sidewalk adjacent to townhomes needs to be at least 5’ wide per BMC
38.520.040.D.1, and the landscaping needs to meet the special residential block
frontage with at least 10’ landscaping.
i.Sidewalks adjacent to townhomes are now 5’ wide with 10’ of
landscaping. (See Site Plan)
8.BMC 38.520.040.C.5 Connections to adjacent properties (including parks and trails).
Provide pathways that connect to adjacent properties.Ensure all north south pedestrian
trails shown connect all the way to the adjacent east west trail to the south located off
site (see image below of one of the connections that needs to be completed).
a.Pathways have been corrected to show a connection to the existing trail to the
South.
9.BMC 38.520.070.B.3 Service areas [trash dumpsters]must not be visible from the
sidewalk and adjacent properties. Where the review authority finds that the only option
for locating a service area is an area visible from a public right-of-way, internal pathway
or pedestrian area, or from an adjacent property, the area must be screened with
structural and landscaping screening measures provided in subsection C below and
division 38.550. Service elements accessible from an alley area exempt from screening
requirements.Show additional details for your dumpster screening including the
materials on the side that will be screening the dumpster from the sides. This will be
particularly important as it is adjacent to pedestrian paths. The enclosure needs to meet
the requirements found in 38.520.070.C. including the material matching the material
used in the main building.
a.See Sheet A1.22
10.BMC 38.520.070.C.2.The sides and rear of service enclosures must be screened with
landscaping at least five feet in locations visible from the street, parking lots, and
pathways to soften views of the screening element and add visual interest.The areas
where the trash enclosures backs up to the trail and adjacent properties to the south will
require this screening. The image below shows 1 of the 3 enclosures this applies to.
a.Plantings have been added as screening on the south faces of trash enclosures
and facing pathways. (See Overall Landscape Plan)
11.BMC 38.520.070.E.Location and screening of roof mounted mechanical equipment.
Please indicate if you have any rooftop mechanical equipment, and if so how is it
screened? IF not, where is your mechanical equipment located?
a.See attached mechanical roof plan(s) showing preliminary roof top equipment.
Screening locations and screening details are provided on the revised
architectural plans.
12.BMC 38.530.040.C.Façade articulation. Residential buildings must include articulation
features at appropriate intervals relative to the scale of the façade in order to reduce the
perceived massing of the building and add visual interest. At least three of the following
features must be employed at intervals relative to the individual dwelling units or at a
maximum of every 30 feet. The scale of the façade articulation should be compatible
with the surrounding context.The larger buildings have sections that require additional
articulation. Currently there is the use of windows and entries, however another
articulation method is required. Refer to this code section as to which articulation method
would work. This is seen on Sheet A3C2.0 (both west and east facades), A3B1.0 (north
and south façade) and A3A1.0 (east and west façade).
a.The Applicant is requesting a departure from BMC 38.530.040.E. The
resubmittal have provided additional rendered perspectives depicting the
variations of the facade. The design has implemented balconies, recessed decks
and recessed window openings to provide additional architectural character
within the facade. (See A9.01 - A9.15)
13.BMC 38.530.040.E Maximum façade width. Building facades wider than 150 feet must
include at least one of the following features to break up the massing of the building and
add visual interest.The larger buildings have sections that require additional features to
break up the building mass. Refer to this code section as to which articulation method
would work. This is seen on Sheet A3C2.0 (both west and east facades), A3B1.0 (north
and south façade) and A3A1.0 (east and west façade).
a.The Applicant is requesting a departure from BMC 38.530.040.E. The
resubmittal has provided additional rendered perspectives depicting the
variations of the facade. The design has implemented balconies, recessed decks
and recessed window openings to provide additional architectural character
within the facade. (See A9.01 - A9.15)
14.BMC 38.530.050.E.Articulated building entries. Primary building entrance(s) must be
clearly defined and scaled proportionally to the building.The main entrances on the
commercial buildings are significantly understated. As previously mentioned, they also
need 3’ weather protection which is an opportunity to meet both of these code
provisions.
a.Comment addressed above. (See AD2.01)
15.BMC 38.530.060.C.4.b.Where cement board paneling/siding is the dominate siding
material, the design must integrate a mix of colors and/or textures that are articulated
consistent with windows, balconies, and modulated building surfaces and are balanced
with façade details that add visual interest from the ground level and adjacent buildings.
There are large expanses on many of the buildings of cement board as the dominant
material. Please break up these expanses either with different material, or one of the
other provided suggestions above.
a.Cement board siding is being replaced with cementitious shingles. See
elevations and renderings.
Parking
1.The current proposal shows on street parking on S Hanley Street. S Hanley Street is a
private drive thus parking is most likely not allowed by the property owners (Cottonwood
Condominiums). If the Condominiums do allow it, you will need to meet the requirements
for Off-site parking found in 38.540.070.
a.There is no longer parking on S Hanley Street. See Site Plan.
2.BMC 38.540.050A.1.b.(4).Transit availability.Show the developed service stop that is
within 800 feet of the site. I see the Goldline has a stop along Ferguson and Babcock,
however I do not see a developed shelter. Is there another one I’m not aware of? If the
stop does not have a shelter, you will be required to install a shelter for it. If the shelter is
not already in place, coordinate with Taylor Lonsdale (Transportation Engineer with
Bozeman), on encroachment permit.tlonsdale@bozeman.net.
a.Bus stop shelter has been designated by HRDC to be located on the NW corner
of the Babcock and Ferguson intersection (See Site Plan). Standard transit
shelter is to be coordinated with HRDC and Taylor Lonsdale, and constructed by
the General Contractor for the project. (See attached documents “Transit Shelter
Spec” and “Transit Shelter Solar Solution”)
3.BMC Table 38.540.020 Dimension of parking spaces and modules.Parking stalls within
a garage are required to be 20’ x 9’ with an additional one foot on all exterior sides of the
stall. This is measured from the inside of the walls. The garages on the three household
buildings are not sufficiently sized.
a.The Triplex enclosed garages have been resized to meet the required 20’x9’ stall
size with an additional 1’ on the exterior wall of the stall. (See sheet AT2.11)
4.Required compact car sign for all compact spaces.
a.Compact spaces are shown on overall site plan.
5.BMC 38.540.050.A.3.a.Landscaping in lieu of parking.Check with Brian if we are okay
with this? –Staff does not support this as it does not meet the exceptions found in
Section 38.540.050.A.3.
a.Parking calculation no longer takes into account reduction from Landscaping in
Lieu of Parking
6.BMC 38.540.050.A.4-5.Need additional information on your bicycle parking. Counting
the symbols it does not add up to the amount stated. Are the symbols in the center of
building B different (longer) for a reason? Are those different rack types? I do not see
any bicycle parking provided for Building D. Also, in order to receive the reduction.
a.Bicycle parking has been labeled correctly on the site plan and overall floor plans
for each building. There are 86 spaces for bicycle parking shown on the site plan.
See Overall Site Plan
Landscaping
1.BMC 38.550.050.A.Provide calculations that show you are meeting the drought tolerant
species requirement of 75% or greater.
a.There are 31 different species of plants, 25 of them drought tolerant. 80% of
selected plant materials are meeting drought tolerant requirements. See Plant
schedule on Sheet L1.01.
2.BMC 38.550.050.J.Required use of trees with residential adjacency. All landscape plans
must include, for each setback with a residential adjacency, at least one canopy or
non-canopy tree for each 50 lineal feet of the adjacent area.There is approximately 950’
of residential adjacency to the south. This will require 19 trees. Additional trees will need
to be added on the southern
a.The residential adjacency on the south side now contains 21 large canopy trees.
See overall Landscape Plan
3.Landscape sheet L3.0, Detail 6, Dog Park Fence. Where is the dog park, or dog park
fence proposed?
a.There is no longer a dog park included in this project, the detail has been
removed.
Lighting
1.38.570.040.G.5.All outdoor lighting must be designed and located such that the
maximum illumination measured in footcandles at the property line may not exceed 0.3
into adjacent residential properties.The lighting plan needs to be redesigned as it is
exceeding the maximum spill over allowed onto the adjacent residential properties
located to the south.
a.Site lighting has been revised to meet this requirement, see attached site lighting
plans
Parks
1.Matthew Lee,mjlee@bozeman.net , (406) 582-2339
a.For the CILP proposed, please provide written justification per Resolution 4784. If
CILP is approved, this will be required to be paid prior to final site plan approval.
Engineering Division
1.Alicia Paz-Solis,apazsolis@bozeman.net
NorthWestern Energy
Jacob Farwell,Jacob.farwell@contractor.northwestern.com
1.Civil Site plan shows electric only to all the proposed buildings and the landscape plan
shows gas and electric to some of the builds. Does the applicant want both gas and
electric services for all the proposed units?
a.Gas will be supplied to all buildinging with exception to the townhouses
2.There is an existing three phase underground electric power line and a 4” gas main
along the west side of S Ferguson Ave from which utilities could be extended into the
site to provide gas & electric services to the new units. There is an existing three phase
junction can in the northeast corner of the site. According to NWE utility maps this would
be the best location to extend NWE utilities. The NWE project engineer will need to
determine the best location for the extension of these utilities and placement of utilities
and transformers.
3.Utility extension & utility easements. Any extension of gas main or electric primary will
need to be installed within an easement. A minimum of a 10-foot easement is required.
To establish the needed internal utility easement locations the NWE project engineer will
help to establish these locations. If an easement shall need to cross property other than
the applicants, negotiations and costs between other landowners for such easements is
entirely the applicant’s responsibility.
4.Transformer location to a structure. If the buildings will be requiring 3 phase power a
transformer pad site should be planned. Typical 3-phase pad is going to be a 7’x7’ pad.
For oil filled transformers a 2-foot clearance is required to non-combustible walls and
surfaces that do not have any openings such as doors, windows, air intake, and fire
escapes routes and meets current NEC or NFPA requirements for non-combustible
material. For transformers 750kVA & larger a 3-foot 6-inch clearance is required and
10-feet of clearance is required on the front side of the pad, where the transformer doors
are located. For any combustible surface, not meeting current NEC or NFPA
requirements for non-combustible material, a minimum of a 10-foot clearance is required
between the building or any combustible surface and the transformer. As shown on the
Overall Utility Plan, the transformer will meet or exceed the 10-ft requirement. All
distances are referenced to the edge of the pad. For planting of bushes or shrubs a
Minimum Working Space for a Pad-Mounted Transformer, is 4-feet on the sides and
back portion of the concrete pad and 10-feet of clearance on the front side of the pad
where the transformer doors are located. Note, all distances are referenced to the edge
of the pad. Due to COVID-19 there has been an impact on receiving larger three phase
and single phase transformers and a longer timeline may be needed to receive the
needed equipment for such services. It is important to submit an application to NWE and
provide the calculated loads as soon as possible to avoid any delays. The NWE project
engineer will help to determine the appropriate location for the transformer.
5.Service & Meter Location. The electric meter & or CT cabinet will need to be installed in
the same general location within 10-feet of the gas meter. NorthWestern Energy
reserves the right to specify the location of our meters. All meters are to be located
outdoors on the corner or in a location on the building closest to the transformer or
secondary junction can serving the building unit. Meter locations will need to be
approved by NWE. NWE policy is to maintain a minimum 30-inches wide by 3-feet clear
zone between the front of the meter and landscape screening or wall screening for
self-contained meter bases and 48-inches for installations requiring cabinets. When
using a screening wall most commercial applications require the 48-inch clear zone
between the front of the meter and the wall. Location of the meter(s) shall allow easy
access to the meters for operation and maintenance. This can be determined through
the design process after an application is submitted through NWE and the area project
engineer will work through allowable shrubs and plants for screening and to determine
adequate clearances for access to our meters.
6.The following applies to the gas regulator. The gas regulator cannot be placed under a
window or within 3’ of the operable portion of the window. It can be placed under a
window/deck on the second story, provided the “open/operable” portion has at least 6’ of
clearance from the regulator. Ensure that there is 10’ of separation from any mechanical
air intake, including air conditioning units. The regulator will need to be 3’ from the
closest corner of any portion of the electric meter base. Submitting an application to
NWE will get the NWE engineer involved and can help with this process.
Meter Screening Walls
1.Gas service cannot penetrate foundation walls that are attached to the building
foundation per the International Fuel Code. Gas riser need to penetrate the building
above ground. However, if the foundation is not attached to the building (i.e. the
foundation wall is isolated from the building for just supporting the wall this is acceptable.
2.If this is a free standing foundation wall, a knock-out must be provided that is a min of
2’x2’ but may be required that the knockout be larger on the electric service depending
on the meter base amperage. Consult NWE for proper sizing of knock-out
3.Contact NWE for placement of knock-out to insure that it lines up properly with the
termination location to prevent bends in the service
4.Screening must meet the clear zone requirement of NWE Electric Service Requirements
which typically for commercial application is 48” from the face of the electric meter.
5.Gas meter cannot be located in recessed location where it is not open atmosphere
above the meter without approval from NWE.
6.Screening cannot consist of rolling doors or other devices that are required to be open to
access the meters.
7.NWE will need to review building elevation plans for the proposed buildings for the meter
locations as well as final grading plans for all utility installation locations.
8.For landscaping. No large deep rooted trees or bushes will be allowed within the 10-foot
utility easement. All other approved landscaping will be placed so as not to damage,
prevent or hinder operation and maintenance of NWE utilities.
9.For landscaping, planting of bushes or shrubs a Minimum Working Space for a
Pad-Mounted Transformer is 4-feet on the sides and back portion of the concrete pad
and 10-feet of clearance on the front side of the pad where the transformer doors are
located. Note, all distances are referenced to the edge of the pad.
10.Submit an application online to have the NWE project engineer work with the applicant.
Go to www.northwesternenergy.com/construction to apply online Montana Construction
Application, and access Montana New Service Guide to provide information on electric
and gas service requirements. Once an application is submitted the NWE project
engineer will be in contact with the applicant. Electrical and gas loads will be required for
the NWE engineer to size the services needed.
Solid Waste Division
Russ Ward, rward@bozeman.net, 406-582-3235
1.Need detailed plan for refuse enclosures
a.See Site plan and Sheet A1.22
2.Doors must swing open a minimum of 180 degrees.
a.See sheet A1.22
Building Department
Ben Abbey,babbey@bozeman.net
1.Covered parking is required to be permitted
2.Cover sheet calls for only 6 accessible spaces, per table 1106.1 with their total onsite
parking totals of 336 space would require 8 accessibly spaces. Also verify with Section
1106.2 (1) for calculating additional spaces.
a.(8) Accessible spaces are now shown on parking calcs/site plan.
3.Section 106.5 Van accessible spaces are required.
a.(2) Van accessible spaces are now shown on parking calcs/site plan.
4.Design standard for Accessibilities requirements shall comply with Chapters 11 of the
2018 IBC and ICC A117.1-2009
5.The requirement for Type A units is calculated as a site in total, or total dwelling units per
Section 1107.6.2.2.1 of the 2018 IBC.
6.For building permit submittal please provide enlarged detailed drawings of Accessibilities
requirements for the Type A and Type B showing, clearances, reach, height’s, controls,
etc…
a.See Sheet A0.11
7.All dwelling units are considered to be Type B on all floors with elevator service.
8.Any spray Foam products are required to be installed according to their listing and
manufacture’s specifications. This can include thermal barrier requirements allowed
within the IBC. Intumescent coatings or paints are require approval from Building and
require special inspections from a certified third party.
9.Commercial Shell permit by its self, and TI’s separately permitted.
Forestry Division
Alex Nordquest,anordquest@bozeman.net,
1.L10: The Forestry Division strongly recommends a substitution for ‘Lewis & Clark’ Prairie
Expedition Elm. This cultivar is susceptible to European Elm Scale. Preferred substitutes
include Accolade, Triumph, Commendation, and Discovery.
a.Lewis and Clark Elm has now been changed to the Accolade Elm.
2.L10: The Forestry Division recommends a minimum of 2 tree species per street
boulevard. Greater variety increases the landscape resiliency to any one pest, disease,
or weather-related issue.
a.Two species of trees have been chosen to meet the boulevard requirements.
(See Landscape Plan and Plant schedule on sheet L1.01)
Fire Department
Scott Mueller,smueller@bozeman.net
1.No comments received at this time.
Water Conservation Division
1.No comments received at this time.
Engineering Comments
Easements:
1.BMC 38.410.060 (B.2) - The applicant must provide a ten (10) foot utility easement
(power, gas, communication, etc.) along the developments property frontage prior to Site
Plan approval.
2.BMC 38.410.060 (C.1) - The applicant must provide a thirty (30) foot public utility
easement to accommodate both water and sewer. An additional ten (10) feet of width is
required for each additional main that occupies the easement.
3.BMC 38.410.060 - All public easements must be provided with respective site plan
submittal in a clean draft format for review prior to individual phase’s site plan approval.
Easements will be deemed inadequate if they are not in a final draft format (signatures
are not required for the draft review). Easements must be stamped by a licensed
professional surveyor.
4.DSSP Section V.D (5.b) - Utility easements will be required for all fire hydrants
maintained by the City of Bozeman.
5.BMC 38.410.060.C - The applicant will need to provide drainage easements over all
detention ponds for possible future maintenance purposes by the City. Public sidewalks
associated easements will need to be provided.
Water Rights:
1.BMC 38.410.130 - Water Rights - The applicant must contact Griffin Nielsen with the City
Engineering Department to obtain a determination of cash-in-lieu of water rights
(CILWR). CILWR must be paid prior to site plan approval.
a.Our initial estimate of annual domestic water usage for the proposed
development is 17.8 ac-ft, as detailed in the preliminary water report, which
translates to $106,800. This number will be finalized in the updated water
report.(See attached document “Engineering Report - Water”)
Water and Wastewater
1.DSSP Section V.B Sanitary Sewer System Design Criteria - The applicant must provide
an estimate of the peak-hour sanitary sewer demand for the development certified by a
professional engineer prior to final plan approval. This information is used to verify
downstream sewer capacity as well as keep the City’s wastewater hydraulic model
updated.
a.Peak hour estimate is provided in the preliminary sewer report. (See attached
document “Engineering Report - Sewer”)
2.DSSP Section V.A Main Size - A water design report must be prepared by a professional
engineer for the proposed project. The water distribution system must be designed to
meet the maximum day demand plus fire flow and the peak hour demand.
a.The proposed water system should meet the maximum demand plus fire flow.
See preliminary water report for peak hour demand.(See attached document
“Engineering Report - Water”)
3.The applicant is advised that due to the known high groundwater and soil conditions
within the proposed area of development an increased rate of corrosion has been
observed with ductile iron water mains, thus decreasing the longevity of publicly owned
and maintained infrastructure. The applicant must provide corrosion protection for all
future water mains within the development and identify how the mains will be protected
with future infrastructure submittal. Acceptable protection methods include zinc coated
ductile iron or v-bio enhanced polyethylene encasement of the main. Corrosion
protection can be waived, if the applicant can demonstrate that corrosion protection is
not applicable for the proposed development. Typically, in order for a waiver to be
granted, the applicant must consult the latest American Water Works Association and
Ductile Iron Pipe Research Association (DIPRA) documentation for testing\evaluation
procedures and provide an analysis demonstrating that corrosion protection is not
needed throughout the entire development. If a wavier is pursued, the waiver must be
requested and approved prior to infrastructure approval.
a.The proposed stormwater treatments will maintain a 3-ft separation between
seasonal high groundwater and the bottom of proposed facilities. A corrosion test
will be performed to determine if corrosion protection will be required.
4.DSSP Fire Service Line Standard - The applicant must prepare plans and specifications
for any fire service line in accordance with the City’s Fire Service Line Policy. The plans
must be prepared by a Professional Engineer and be provided to and approved by the
City Engineer prior to initiation of construction of the fire service or fire protection system.
The applicant must also provide Professional Engineering services for construction
inspection, post-construction certification and preparation of mylar record drawings. Fire
service plans, and domestic services 4” or larger, must be a standalone submittal,
separate from the site plan submittal. City of Bozeman applications for service must be
completed by the applicant.
Stormwater
1.BMC 38.410.060.C - The applicant is showing stormwater features on the site that are
located outside their property boundary. Based upon Engineering’s understanding
there’s no legal documentation allowing the location of these proposed features. Legal
documentation (existing/future) must be provided which show the applicant has lawful
authority to place these stormwater features as presently shown.
a.Stormwater features off site are no longer being used.
2.The applicant must follow and demonstrate compliance with DSSP Section V.C for
culvert design standard specifications to provide continued storm drainage conveyance
through the existing swale at the Ferguson Avenue access.
a.A 30” culvert at the Ferguson access is proposed. See sheet C1.4
3.The applicant must show storm sewer piping and connection of building roof drains on
the drainage plan sheet.
4.The applicant must provide details for the proposed drywells.
5.DSSP Section II (B.1) - The applicant must delineate the drainage basins on the
drainage sheet or a separate exhibit and include the identification and square foot
coverage of the various ground surfaces.
a.The stormwater system being proposed uses a combination of detention and
retention ponds, as well as infiltration basins to collect the site post run-off.
6.DSSP Section II (B.2) - The applicant must provide topographic contours (one-foot
intervals) and sufficient spot elevation data on the drainage plan sheet.
7.DSSP Section II (B.3) - The applicant must provide a description of the ultimate
destination of stormwater runoff from the project in an overflow event.
a.The proposed stormwater detention ponds will release limited to the 10-yr, 2-hr
storm intensity. Retention ponds have been sized for larger enets as detailed in
the stormwater report. (See attached document “Engineering Report - Storm”)
8.DSSP Section II (B.6) - The applicant must provide details and specifications (including
invert and other pertinent elevation information) for all storm drainage improvements.
9.BMC 40.04.720 - The applicant must draft a stormwater maintenance plan which defines
ownership and responsibility of stormwater facilities (on-site and off-site) and shall create
and maintain records of installation and maintenance and repair for the life of the
development and shall be made available to the engineering department upon request.
10.BMC 38.540.020.M - The applicant must identify snow storage areas on the Site Plan for
the parking area. Snow removal storage areas must be sufficient to store snow
accumulation on site. Such areas shall not cause unsafe ingress/egress to the parking
areas, shall not cause snow to be deposited on public rights-of-way, shall not include
areas provided for required parking access and spaces, and shall not be placed in such
a manner as to damage landscaping. Confirm snow storage runoff will be retained and
treated onsite.
a.Snow storage is shown on site plan. (See A1.01)
Transportation
1.BMC 38.210.060 (A.12) - The Traffic Impact Study (TIS) must include discussion and
analysis without traffic mitigation measures by future development in the area (i.e.
single-lane modern roundabout at the intersection of South Ferguson and Fallon Street).
a.See attached document “Traffic Impact Study”
2.BMC 38.400.010 (A.2) - Relation to developed areas - The developer must arrange the
streets and alleys to provide for the continuation of streets and alleys between adjacent
developed properties when such continuation is necessary for the convenient movement
of traffic, effective provision of emergency services and efficient provision of utilities. The
applicant must consider continuation of the driveway extension on Mill Creek Drive
(adjacent development to the southeast). If a connection to Mill Creek Drive is not
possible, the applicant must provide documentary evidence as to why this connection
cannot be provided. The applicant must provide documentation regarding the public
access easement shown along S. Hanley Avenue If changes have taken place, please
provide updated documentation.
a.Attached is a Final Plat for the adjacent Cottonwood Condominiums which
depicts an existing 60ft wide access and utility easement along the West side of
the property which should suffice as access to Hanley Avenue and the SW
entrance for this development. All use of property alongside Hanley for
stormwater and landscaping has been removed from the site plan. Should the
city determine this easement as insufficient, we will abandon the SW entrance for
this development. (See attached document “Cottonwood Condominiums Final
Plat”)
3.Public sidewalks along Babcock Street and Ferguson Avenue must be located in the
right-of-way with one foot of separation from the property boundary.
a.Public sidewalks are now at least 5’ wide with a 1’ separation between property
boundary. (See Site Plan, Sheet A1.01)
4.Public sidewalks with associated easements must be installed along the west property
line connecting the sidewalk along Babcock Street to the trail along the development’s
southern boundary.
a.See Site Plan, Sheet A1.01
5.DSSP Section IV (B.3) - All sidewalks shall have a minimum width of five (5) feet; ensure
sidewalk width matches the existing sidewalk along West Babcock Street.
a.See Site Plan, Sheet A1.01
b..
Lighting
1.BMC 38.400.070 Street Lighting - City standard street lights are required along the
frontages of Babcock Street and Ferguson Avenue, per the collector spacing
requirements. The street lighting must be shown on the site plan. Infrastructure plans for
the construction for the street lights must be submitted to the City Engineering
Department per the Design Standards and Specifications Policy Manual. The street
lights must be part of an SILD prior to occupancy of the proposed project.
a.See site plan and lighting plan.
Conditions of Approval
City of Bozeman Resolution 5076, Policy 1 - The applicant must provide and file with the County
Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special
Improvement Districts (SID’s) on City standard form for the following:
1.Street improvements to Babcock Street between Cottonwood Road and Main Street
including lighting, signalization, paving, curb/gutter, sidewalk, and storm drainage.
2.Street improvements to Ferguson Avenue between Huffine Lane and Durston Road
including lighting, signalization, paving, curb/gutter, sidewalk, and storm drainage.
3.Intersection improvements at Babcock Street and Cottonwood Road Lane including
lighting, signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage.
4.Intersection improvements at Babcock Street and Ferguson Avenue including lighting,
signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage.
5.Intersection improvements at Babcock Street and Main Street including lighting,
signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage.
6.Intersection improvements at Ferguson Avenue and Huffine Lane including lighting,
signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage.
7.Intersection improvements to Ferguson Avenue and Durston Road including lighting,
signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage.
a.On November 22, 2021, we, through our attorneys (The Rabb Law Firm), sought
the City’s legal authority to require the signing of the Waiver of Right to Protest
Creation of Special Improvement Districts (“Waiver”). However, we have not
received an answer with the specific legal authority the City is relying on. As
such, we are assuming that the City does not have any legal authority to require
us to sign the Waiver and that the City will now be willing to drop the Waiver
requirement. If the City is not willing to drop the Waiver requirement then please
immediately provide us with the legal authority that the City is relying on to
require us to sign the Waiver.
The document filed must specify that in the event an SID is not utilized for the
completion of these improvements, the developer agrees to participate in an alternate
financing method for the completion of the improvements on a fair share,
proportionate basis as determined by square footage of property, taxable valuation of
the property, traffic contribution from the development, or a combination thereof. The
applicant must provide a copy of the filed SID waiver prior to final plan approval.