HomeMy WebLinkAboutProjectFlow - Changemarks Rev 2Changemarks Report
Project Name:
Workflow Started:
Report Generated:
Grouping
Main Workflow
Cycle
1
21235 Six Range Condominiums SP
12/16/2021 7:58 AM
02/22/2022 01:06 PM
Ref #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
48
49
50
51
52
55
60
61
62
63
64
65
66
67
68
69
70
73
74
75
76
77
78
79
80
Complete?
True
True
True
True
True
True
True
Status
Revised
Revised
revised
Revised
Revised
Revised
Revised
Revised
Revised
revised
revised
revised
Revised
Revised
Revised
revised
Revised
Revised
Revised
Revised
Revised
Revised
Revised
Info Only
Info Only
Info Only
Info Only
Info Only
Info Only
Info Only
Revised
Revised
revised
Revised
Revised
Revised
Revised
Revised
Revised
revised
revised
Revised
Revised
revised
Revised
Revised
Revised
Revised
Revised
Revised
revised
Revised
Revised
Revised
Revised
revised
Revised
Revised
Revised
Revised
Revised
Revised
Revised
Revised
Revised
Revised
Revised
revised
Revised
revised
Department
Solid Waste
Water and Sewer Division
Water and Sewer Division
Water and Sewer Division
Water and Sewer Division
Water and Sewer Division
Water Conservation Division
Water Conservation Division
Water Conservation Division
Forestry Division
Forestry Division
Forestry Division
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Building Division
Building Division
Building Division
Building Division
Building Division
Building Division
Building Division
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Engineering
Engineering
Engineering
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Planning
Snapshot
File
029 Dumpster Enclosure & Mech Screening.pdf
016 Sewer Plan.pdf
016 Sewer Plan.pdf
016 Sewer Plan.pdf
016 Sewer Plan.pdf
016 Sewer Plan.pdf
059 Irrigation Plan Overall.pdf
053 Landscape Plan.pdf
059 Irrigation Plan Overall.pdf
053 Landscape Plan.pdf
053 Landscape Plan.pdf
053 Landscape Plan.pdf
020 Drainage Plan.pdf
City of Bozeman - Response Letter.pdf
City of Bozeman - Response Letter.pdf
Engineering Report - Water.pdf
Engineering Report - Storm.pdf
Engineering Report - Storm.pdf
016 Sewer Plan.pdf
020 Drainage Plan.pdf
020 Drainage Plan.pdf
Engineering Report - Storm.pdf
Engineering Report - Storm.pdf
001 Cover Sheet.pdf
005 Accessibility Details.pdf
061 1st Floor - A - Overall .pdf
061 1st Floor - A - Overall .pdf
061 1st Floor - A - Overall .pdf
089 Main Floor Plan Triplex.pdf
102 Site Plan West.pdf
Engineering Report - Sewer.pdf
Engineering Report - Water.pdf
City of Bozeman - Response Letter.pdf
City of Bozeman - Response Letter.pdf
Engineering Report - Storm.pdf
021 Drainage Details.pdf
027 Site Plan.pdf
009 Civil Site Plan .pdf
093 Elevations Triplex.pdf
088 Site Plan Triplex.pdf
027 Site Plan.pdf
027 Site Plan.pdf
027 Site Plan.pdf
054 Landscape Planting Plan West.pdf
066 Overall Elevations - Building A.pdf
021 Drainage Details.pdf
020 Drainage Plan.pdf
Engineering Report - Storm.pdf
089 Main Floor Plan Triplex.pdf
074 Overall Elevations.pdf
082 Overall Elevations.pdf
082 Overall Elevations.pdf
001 Cover Sheet.pdf
001 Cover Sheet.pdf
027 Site Plan.pdf
027 Site Plan.pdf
030 Material Pallete.pdf
053 Landscape Plan.pdf
053 Landscape Plan.pdf
053 Landscape Plan.pdf
053 Landscape Plan.pdf
053 Landscape Plan.pdf
053 Landscape Plan.pdf
053 Landscape Plan.pdf
053 Landscape Plan.pdf
053 Landscape Plan.pdf
053 Landscape Plan.pdf
054 Landscape Planting Plan West.pdf
055 Landscape Planting Plan East.pdf
105 Photometric Plan East.pdf
Markup Name
refuse enclosure
Nick Pericich
Nick Pericich
Nick Pericich
Nick Pericich
Nick Pericich
Chelsey Trevino
Chelsey Trevino
Chelsey Trevino 02
Forestry Comments - 21235 Six Range SP
Forestry Comments - 21235 Six Range SP
Forestry Comments - 21235 Six Range SP
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Ben Abbey
Ben Abbey
Ben Abbey
Ben Abbey
Ben Abbey
Ben Abbey
Ben Abbey
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Lynn Hyde
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Planning_LynnHyde
Changemark Subject
Changemark note #01
W/S Existing Sewer Access
W/S Sewer Service
W/S Existing Sewer Main Stubs
W/S Existing Sewer Main Stubs
W/S Existing Sewer Main Stubs
WTRCON - No Irrigation Turf
WTRCON - Non-Irrigated Native Grass Description
WTRCON - Irrigation Notes
Blvd Tree Spacing
Blvd Tree Spacing
Tree Species Recommendation
ENG Stormwater Basin
ENG Utility Easement
ENG Water/Sewer Easement
ENG CIL Water Rights
ENG Drainage Report
ENG Stormwater Maintenance Plan
ENG 8" Sewer Service
ENG Culvert Design
ENG Ultimate Runoff
ENG Geotech Report
ENG Groundwater Measurements
BLDG - Code Adoptions
BLDG - Accessible Codes
BLDG - Type A Units
BLDG - Type B Units
BLDG - Spray Foam Products
BLDG - IBC
BLDG - Parking
ENG Sewer Report Certify
ENG Water Report Certify
ENG Street Lighting
ENG SID Waiver
ENG Stormwater Basin
ENG Dry Wells
ENG Legal Access
ENG Crosswalk
Block Frontage - 38.510
Parking - 38.540
Parking - 38.540
Parking - 38.540
Parking - 38.540
Site Plan and Landscaping Plan Discrepencies
PLNG - Missing Elevations
ENG Curb Scupper
ENG Proposed Dry Well
ENG Dry wells
PLNG - Internal residential garage dimensional standards
PLNG - Block frontage
PLNG - Blank Wall Treatment
PLNG - Blank Wall Treatment
PLNG - Bike parking calculations
PLNG - Bicycle Parking
PLNG - Building A's Northern facade
PLNG - HRDC Approval
PLNG- Painted Panel
PLNG - Landscaping screening
PLNG - Block Frontage Standards
PLNG - Shared Open Space Amenities
PLNG - Shared Open Space
PLNG - On-site commercial open space
PLNG 38.550.050 - Mandatory landscaping
PLNG - Parking lot screening from residential
PLNG - Parking lot trees provided
PLNG - tree planting location
PLNG - Parking lot landscaping
PLNG - Detail provided
PLNG - Open space
PLNG - Lighting specifications
Changemark Details
roof of enclosure may not overhang the clear opening to allow truck access
We will need to be able to access the existing sewer main and manhole. This will require an all weather access to this manhole. The sewer easement will need to be void of trees and
permanent structures.
Sewer Service needs to be perpendicular to the main for the length of the easement.
There are stubs south into or close to the north property line of this project from the existing manholes on the north (3 manholes). Plug the south inverts in the manhole or relocate
any trees to provide 10' separation from existing 8" stubs.
There are stubs south into or close to the north property line of this project from the existing manholes on the north (3 manholes). Plug the south inverts in the manhole or relocate
any trees to provide 10' separation from existing 8" stubs.
There are stubs south into or close to the north property line of this project from the existing manholes on the north (3 manholes). Plug the south inverts in the manhole or relocate
any trees to provide 10' separation from existing 8" stubs.
Temporary watering will be needed to establish the native non-irrigated turf. Please indicate how water will be distributed to the native turf during the turf establishment period.
Indicate the type of non-irrigated native grass to be installed (sod versus seed).
Indicate the install of a smart (weather-based) irrigation controller and rain/freeze sensor will be installed.
No trees shall encroach Street Vision Triangles. No Blvd trees within 10' of hydrants/streetlights.
No Blvd trees within 10' of hydrants/streetlights.
Proposed species of Ohio Buckeye and Toba Hawthorn are acceptable, but not optimal. The growing space appears suitable for larger-growing species that will provide more eco-benefits.
If there are otherwise limiting site conditions that the Forestry Division is unaware of, please disregard this comment.
DSSP II.C - Basin 6B is mentioned in the stormwater report/calculations but it is not shown on the Drainage Plan.
BMC 38.410.060 (B.2) - The applicant must provide a ten (10) foot utility easement (power, gas, communication, etc.) along the developments property frontage prior to Site Plan approval.
BMC 38.410.060 (C.1) - The applicant must provide a thirty (30) foot public utility easement to accommodate both water and sewer. An additional ten (10) feet of width is required for
each additional main that occupies the easement.
BMC 38.410.130 - The applicant must contact Griffin Nielsen with the City Engineering Department to obtain a determination of cash-in-lieu of water rights (CILWR). CILWR must be paid
prior to site plan approval.
BMC 40.04.700 (A.5) - All drainage system reports, peak flow rates and runoff volume calculations, safety requirements, and grading plans shall be certified by a licensed professional
authorized by the state to perform such functions.
DSSP II.B.5. A storm drainage facilities maintenance plan. The plan shall:
a. Identify ownership of all facilities.
b. Establish a schedule for maintenance activities necessary to keep the system operationally effective.
c. Identify the responsible party in charge of the specific maintenance duties.
The stormwater drainage plan needs to address maintenance of the proposed dry wells as well as the permeable pavers to the west of the subject property.
DSSP 5.C.6 - Manholes are required for 8" sewer services connecting to 8" mains.
The applicant must follow DSSP V.C.7 & 8 for culvert design standards. The applicant needs to clearly show existing stormwater facilities that take drainage from the neighboring development
south east adjacent to this site.The applicant must evaluate what is permitted by the adjacent development. and verify that any additional stormwater from the subject property is not
adversly affecting the existing drainage system. Furthermore, it is unclear in the report on the sizing of the culverts. For example, Basin 2B drains into an existing system and calls
for a 30 inch diameter RCP culvert, yet the report shows calculations for a 15 inch and 18 inch culvert. Again, Basin 8 shows a new culvert, but does not provide any sizing or downstream
capacity details. The applicant needs to confirm the culvert sizes and provide sufficent information to determine if downstream capacity is adquate.
DSSP Section II (B.3) - The applicant must provide a description of the ultimate destination of stormwater runoff from the project in an overflow event. How and where will the runoff
from the permeable pavers be directed. How will the overflow be routed east of the subject property. Considerting the grade, how will runoff flow to the basins south of the property.
The applicant is advised that all runoff generated from the subject property must be accounted for and that overland flow to the adjacent development is not allowed.
Provide geotechnical results for this site.
BMC 38.220.120.A.2.c (3.a) - A description of the hydrologic conditions of the site with analysis of water table fluctuation and a statement of site suitability for intended construction
and proposed landscaping. The description of the hydrologic conditions must include depth to groundwater measurements taken May 15 through September 15.
City of Bozeman and the State of Montana are adopting the new ICC 2021 Building Codes Spring of 2022. Construction documents submitted May 1st shall be review under the 2021 building
codes.
All Accessible requirements shall be in accordance with the ICC A117.1-2009. It is unclear if the state will be adopting the new A117.1-2017 at this time.
The requirement for Type A units is calculated as a site in total, or total dwelling units per Section 1107.6.2.2.1 of the 2018 IBC.
All dwelling units are considered to be Type B on all floors with elevator service.
Any spray Foam products are required to be installed according to their listing and manufacture’s specifications. This can include thermal barrier requirements allowed within the IBC.
Intumescent coatings or paints are require approval from Building and require special inspections from a certified third party.
Triplex Plans shall be designed in accordance with the IBC. These unit will count towards the total dwelling on the site for Accessible Type A Units required. However no Type A or Type
B are required with in the Triplex’s because of the configuration as proposed.
(IBC - 1107.6.2.2.1)
Parking shall be in accordance with table 1106.1 for the total onsite parking spaces that would be accessible.
DSSP Section (V.B) Sanitary Sewer System Design Criteria - The applicant must provide an estimate of the peak-hour sanitary sewer demand certified by a professional engineer for the
proposed project.
DSSP Section (V.B) Sanitary Sewer System Design Criteria - The applicant must provide an estimate of the peak-hour sanitary sewer demand certified by a professional engineer for the
proposed project.
BMC 38.400.070 - The required public street light(s) must be included in a Special Improvement Lighting District (SILD), in accordance with the City of Bozeman Lighting and Electrical
Specifications, prior to occupancy.
Refer to EMAIL from Kelley Rischke, Assistant City Attorney to Olivia Wathne (Six Range Group Rep)
Fri 2/4/2022 10:34 AM
KRischke@BOZEMAN.NET
Kelley Rischke | Assistant City Attorney
City of Bozeman | 121 N. Rouse Ave. | Bozeman, MT 59715 | 406.582.2289
DSSP II.C - Basin 6B is mentioned in the stormwater report/calculations but it is not shown on the Drainage Plan.
The applicant must provide details for the proposed drywells as presented no details are shown on sheet C5.1. The drywell detail should indicate the seasonal high groundwater elevation.
The applicant must provide documentation regarding the public access easement shown along South Hanley Avenue if changes have taken place, please provide updated documentation. The Final
Plat of Minor Subdivision No.365A indicates that the "existing 60' wide access and utility easement per COS 1874 to be abandoned."
Crosswalk shown on sheet A1.01 Site Plan, needs to be shown in all civil site plans.
Provide transparency calculations for the facade facing W Babcock. It appears your facade is meeting the required transparency calculations of 15% of the entire facade, however they
percentage needs to be provided on the elevations sheet.
See 38.510.030.C. for requirements.
38.540.010.A.4. precludes stacking off off-street parking spaces with the exceptions of a number of types of housing including townhouse/rowhouses. If stacking is proposed with these
housing types, physical separation that meets the requirements found within must be provided.
Please provide the physcial separation on next submittals for all triplex buildings parking.
Concrete sidewalks a minimum of five feet in width must be provided between any existing or proposed building and adjacent parking lot. Where sidewalk curbs serve as wheel stops, an
additional two feet of sidewalk width is required.
There are a number of locations where the sidewalk between the parking lot and building is only 5', not the required 7' when it is functioning as the wheelstop.
Concrete sidewalks a minimum of five feet in width must be provided between any existing or proposed building and adjacent parking lot. Where sidewalk curbs serve as wheel stops, an
additional two feet of sidewalk width is required.
There are a number of locations where the sidewalk between the parking lot and building is only 5', not the required 7' when it is functioning as the wheelstop.
Concrete sidewalks a minimum of five feet in width must be provided between any existing or proposed building and adjacent parking lot. Where sidewalk curbs serve as wheel stops, an
additional two feet of sidewalk width is required.
There are a number of locations where the sidewalk between the parking lot and building is only 5', not the required 7' when it is functioning as the wheelstop.
It appears the layout of the triplexes do not match from the civil plan to the landscape plan. The entrances to the garages and front entries are not matching up.
Is this an error on the landscaping plan? I have only seen one triplex floor plan and elevations. Is there another one that should have been submitted?
Where is the north and south east 'endcap' elevations.
One of the perspective images appeared to show the northern end of the building with a wall that meets our blank walls standards as found in 38.530.070, however its difficult to tell
without the elevation.
Also show how the northern elevation is meeting the block frontage standards. In particular note the transparency requirements.
Provide detail on the proposed curb scupper presented on sheet C5.O Drainage Plan.
The proposed dry well is off the property site, please provide additonal information.
Applicant needs to demonstrate that the wells will infiltrate with in the 42-hr period.
The individual residential garage dimension standards requires the stalls to be 20' x 9' with an additional foot on all sides of the parking space. Thus for a single car garage, this
would require 22' x 11'. These stalls appear to be slightly undersize in depth or length at 21'.
Refer to BMC 38.540.020.
Provide transparency calculations for block frontage showing how the northern facade is meeting the block frontage standards.
BMC 38.510.030
This section meets the definition of a blank wall and needs to be have an appropriate treatment.
Blank Wall Definition: A wall (including building façades and retaining walls) is considered a blank wall if it is over ten feet in height, has a horizontal length greater than 15 feet,
and does not include a transparent window or door.
Refer to BMC 38.530.070
This section meets the definition of a blank wall and needs to be have an appropriate treatment.
Blank Wall Definition: A wall (including building façades and retaining walls) is considered a blank wall if it is over ten feet in height, has a horizontal length greater than 15 feet,
and does not include a transparent window or door.
Refer to BMC 38.530.070
Provide bicycle parking calculations including covered vs not covered.
Did you provide a specification for your bicycle racks? If so please direct me to it, if not, please provide.
Provide additional details for Buidling A's northern facade that show how its meeting the block frontages standards and ensure there are no blank walls present.
Provide documentation of HRDC approval (this can be in email form). This is required to be eligible for the 10% parking reduciton for residential parking requirements.
What material is this painted cementious panel? Where does it match the samples below? I don't see a white horizontal patterned material in the samples provided below.
What is the reason for the landscape gap here? Please provide additional landscaping or reasoning for the gap.
As required in 38.510.030.I., residential units on the ground floor need to have a treatment provided to ensure privacy for residents and an attractive safe pathway.
The project appears to be proposing the ten foot landscape setback between the sidewalk and residence. In order for that to count, ensure you are providing landscaping for the entire
10' depth which is not being done here.
BMC 38.520.060.B.2.d. Shared open space must feature paths or walkable lawns, landscaping, seating, lighting, and play structures, or other pedestrian amenitites to make the area more
functional and enjoyable for a range of users.
You have the pathways, please show other amenities consistent with this code section that makes this open space enjoyable for a range of users.
38.520.060- it appears there are play amenities proposed here although they are difficult to see. Please provide specifications of what these amenities are.
Per BMC 38.520.060.C.2. Mixed use sites.
Refer to the code to provide calculations showing how much of the site is for commercial areas (areas solely for residential use may be omitted). If the areas designated for commercial
equal less than 1 acre, no open space is required for the commercial uses. If the area is greater than 1 acre, open space needs to be provided at a ratio of 2% of the total area dedicated
to commercial uses.
Please provide a diagramn showing the areas of the site that are designated for commercial uses (including parking service areas, etc.) to determine the threshold. If open space is required,
it will need to meet the codes definitions of what can count as open space.
Drought tolerant species - landscape plan must provide 75 percent or greater of the proposed trees and shrubs as drought tolerant species.
Provide calculations showing you are meeting the drought tolerant requirements of 75%.
Due to the sensitivity of the adjacent residential development, the robust screening is imperative along this property line. It still does not appear to meeting the requirements of not
less than four feet in width, and maintained at a height of four to six feet.
Please supplement the landscaping with additional landscaping that will provide this screening. If you feel you are providing adequate screening, submit a perspective showing how the
parking lot will be adequately screened, year round.
Refer to BMC 38.550.050.C. for supporting code language.
Staffs calculations indicate you are meeting this provision, however please provide a reference as to the quantity and types (i.e., large canopy trees, large non-canopy trees, or small
trees), that you are proposing that enable your proposal to meet the required parkng lot trees.
Refer to BMC 38.550.050.C.2.b for full code provision.
BMC 38.550.050.C.2.d
No tree shall be planted closer than three feet to the back of the curb or edging equivalent.
There are a few locations where the trees appear to be closer than 3'. Ensure all trees are located in a location where they have the full 3' that will ensure survivability and keep
the hardscape in good condition (i.e., no asphalt lift caused by roots.)
The parking lot is required to provide parking lot landscaping at a ratio of 20sf per off-street parking space.
Provide square footage calculations showing how you are meeting this requirement. Note that the area that counts must be contained within the parking lot, not adjacent but on the outside
of it, so it needs to be met within the islands or potentially corners/endcaps.
Refer to BMC38.550.050C.2.e for full code requirements.
Have you provided a detail for the proposed separation of the triplex parking? What are these features (height, material, etc.)
Please elaborate on what is happening here and how this stormwater feature can qualify for open space. It seems it will be a steep grade, and potentially filled with water?
Provide additional features or renderings showing how this can be a usable open space amenity for the residents.
What are these symbols that appear in the middle of the parking stalls? I've not been able to match them up with any specification sheet symbol, nor does it make sense to have a lightpole
in the middle of a parking stall.
Please clarify for me.
Markup Date
01/10/2022 12:48 PM
01/31/2022 11:02 AM
01/31/2022 11:03 AM
01/31/2022 11:03 AM
01/31/2022 11:03 AM
01/31/2022 11:03 AM
01/31/2022 11:56 AM
01/31/2022 12:55 PM
01/31/2022 12:58 PM
02/01/2022 12:56 PM
02/01/2022 12:56 PM
02/01/2022 12:56 PM
02/10/2022 2:57 PM
02/08/2022 2:12 PM
02/08/2022 2:12 PM
02/07/2022 5:40 PM
02/10/2022 2:59 PM
02/10/2022 2:59 PM
02/07/2022 10:08 AM
02/10/2022 2:57 PM
02/10/2022 2:57 PM
02/10/2022 2:59 PM
02/10/2022 2:59 PM
02/08/2022 9:39 AM
02/08/2022 9:43 AM
02/08/2022 9:57 AM
02/08/2022 9:57 AM
02/08/2022 9:57 AM
02/08/2022 10:27 AM
02/08/2022 10:47 AM
02/07/2022 5:37 PM
02/07/2022 5:40 PM
02/08/2022 2:12 PM
02/08/2022 2:12 PM
02/10/2022 2:59 PM
02/10/2022 2:53 PM
02/08/2022 2:07 PM
02/08/2022 2:51 PM
01/26/2022 10:50 AM
01/26/2022 11:07 AM
02/16/2022 9:49 AM
02/16/2022 9:49 AM
02/16/2022 9:49 AM
02/16/2022 11:31 AM
02/18/2022 10:43 AM
02/10/2022 2:53 PM
02/10/2022 2:57 PM
02/10/2022 2:59 PM
02/14/2022 10:15 AM
02/14/2022 11:13 AM
02/18/2022 10:37 AM
02/18/2022 10:37 AM
02/16/2022 10:21 AM
02/16/2022 10:21 AM
02/16/2022 9:49 AM
02/16/2022 9:49 AM
02/15/2022 3:41 PM
02/16/2022 11:23 AM
02/16/2022 11:23 AM
02/16/2022 11:23 AM
02/16/2022 11:23 AM
02/16/2022 11:23 AM
02/16/2022 11:23 AM
02/16/2022 11:23 AM
02/16/2022 11:23 AM
02/16/2022 11:23 AM
02/16/2022 11:23 AM
02/16/2022 11:31 AM
02/16/2022 11:29 AM
02/16/2022 12:04 PM
Updated By
Russell Ward
Nick Pericich
Nick Pericich
Nick Pericich
Nick Pericich
Nick Pericich
Chelsey Trevino
Chelsey Trevino
Chelsey Trevino
Alex Nordquest
Alex Nordquest
Alex Nordquest
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Ben Abbey
Ben Abbey
Ben Abbey
Ben Abbey
Ben Abbey
Ben Abbey
Ben Abbey
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Alicia Paz-Solis
Alicia Paz-Solis
Alicia Paz-Solis
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Lynn Hyde
Applicant Response
Roof Over Hang is 6" back from Opening
A driveway approach and all-weather access road were added to the plans in order to access the existing sanitary sewer mahole. The existing road extension east of Hanley will be demolished.
The sewer service into Building D was reconfigured to be perpendicular to the new main extension
Notes to plug the south stubs at the existing manholes have been added to the sewer plans
Notes to plug the south stubs at the existing manholes have been added to the sewer plans
Notes to plug the south stubs at the existing manholes have been added to the sewer plans
Added in Notation
Notation Added
Notation Added
Trees have been adjusted
Trees have been adjusted
Intentional
Basin 6B was eliminated and no longer is included in the stormwater calculations
The property already has gas and electric easements around the perimeter. See Sheet C0.2
See draft Water and Sewer Easement provided
1) We are attempting to contact. See email. Applicant will pay Cash-in-lieu water right fee prior to final site-plan approval, once final amount is known. 2) See updated water
report. The estimated annual usage in Section 1.1.5 was determined to be 30.44 ac-ft. At $6000/ac-ft, the CILWR fee would be $182,649.10 An email to Mr. Neilson has been sent with
this information (see enclosed).
See Report
Applicant will incorporate a Stormwater Management Plan into the HOA document, before filing legally required HOA bylaws. Note: A.B. & C are now incorperated in Report
New manholes have been added where the 8" service lines tie into the new 8" main.
The Six-Range stormwater ponds are NOT taking any of the adjacent development's runoff. Currently their SE pond's outlet pipe encroaches on the Six-Range tract. The 30" outlet pipe
has a 2"-wide wier inside its flow control manhole.
This is further addressed in the stormwater report, but the ultimate destination of the stormwater retention ponds will be infiltrated into the underlying groundwater. If, by chance,
the permeable paver section exceeds capacity of the gravel section, stormwater will flow west to the existing stormwater pond for the Cottonwood Condominiums
The geotech report is included as an appendix in the utility reports.
See enclosed groundwater monitoring results collected by Allied Engineering. Note: the DIPRA report is relavant to the water main installation, not groundwater monitoring results
Understood
Understood
Understood
Understood
Understood
Understood
Understood
Peak hour flows have been updated in the sewer report in Section 11.12.
Peak hour flows have been updated in the water report in Section 1.1.5
SILD Zone Added
Waiver Added in Documents
The basins have been re-configured and 6B no longer exists.
See Sheet C 5.1 for the dry well detail.
Abandoned Access to Hanley
Notation Added
Fenced/planters Detail added to sheet
All sidewalks next to parking is 7'.
All sidewalks next to parking is 7'.
Landscape and overall site plan are correct. Will ensure civils matches
see additional sheets: 66.1, 66.2 and 66.3
Added to 021 Drainage Details
Removed
The stormwater report demonstrates that the ponds will infiltrate within the requesite 42-hr period.
Adjusted
See 30.1 Overall Elevations
See 066.2 for screening
See 066.2 for screening
noted
see 057 Detail number 2
see 66.2
supplied email and documents
Cementitious Panel (Fiber Cement) is the Material. It would get a red paint on it. There would be no horizontal or vertical pattern on this. The other material is now a shake and the
pattern is shown.
Fixed For Sidewalk
Added Hatch for Rock Mulch
See sheets 054, 055 Keynotes
Provided - See Bab Play Docs
Provided - No open area required. Commercial area is 13850 sf
Added to Sheet
Added Additional Screen plants trees to ensure proper coverage.
This is already provided on the sheet. See Top left section "Parking Lot Landscaping."
Relocated
This is already provided on the sheet. See Top left section "Parking Lot Landscaping."
Steel Planter Boxes See sheet 057 Landscape Site Details
This a landscape mound for the Play structures.
These maks are Type F2 Light Fixtures. Shown and labeled on sheet ES1.1