HomeMy WebLinkAbout009 Gran Cielo Sub Supplemental TIS Letter Report MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 Mailing Address: P.O. Box 80785 Billings, MT 59108-0785 Phone: 406-655-4550 FAX: 406-655-4991 Page 1 Chris Budeski, P.E. Madison Engineering 895 Technology Blvd, Suite 203 Bozeman, MT 59718 December 11, 2017 Re: Gran Cielo Subdivision Traffic Impact Study Addendum Subsequent to submittal of a Traffic Impact Study (TIS) dated October 24, 2017 for the proposed Gran Cielo Subdivision, the City of Bozeman Planning staff reviewed the study and requested additional information in a memo dated November 18, 2017. Item number 9 in that letter indicated that there are several development projects within the vicinity of the subdivision that were not included in future traffic projections that need to be included in the analysis. The three developments mentioned in the letter are all contained within the boundaries of the Meadow Creek Subdivision. Since there were no TIS reports prepared for the individual projects listed, it was determined that the entirety of Meadow Creek Subdivision should be included in the analysis A TIS for Meadow Creek Subdivision was completed by Robert Peccia and Associates in 2005. That study indicated that the subdivision would generate 5,382 trips on the average weekday with 414 in the peak am hour and 530 in the peak pm hour. Trip distribution and traffic assignment analysis completed with that study no longer apply to 2017 conditions because of new street links that have been created and additional development in the southern areas of Bozeman. Therefore, trip distribution percentages determined for the Gran Cielo subdivision were used to assign Meadow Creek Subdivision traffic. Attached Figure 7 was created to illustrate the additional traffic that would be attributed to Meadow Creek Subdivision on the area street system. Since a portion of Meadow Creek Subdivision has already been developed, it was necessary to subtract existing traffic from the overall trip generation totals, as noted in Figure 7. The resultant trip generation from future development of Meadow Creek Subdivision would be 3,682 average weekday trips (AWT) with 284 in the AM hour and 362 in the peak PM hour. The Meadow Creek Subdivision traffic assignment volumes shown in Figure 7 were added to traffic shown in Figure 6 of the original TIS for Gran Cielo Subdivision. Figure 6 Revised is attached and represents an estimate of year 2032 traffic volumes with full occupation of the Gran Cielo Subdivision. MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 Mailing Address: P.O. Box 80785 Billings, MT 59108-0785 Phone: 406-655-4550 FAX: 406-655-4991 Page 2 Capacity calculations (Revised Appendix C-3 attached) were completed for future conditions based upon the peak am and peak pm volumes, as shown in Figure 6 Revised. Table 4 Revised, below, is a summary of the capacity calculations results. In comparing Table 4 Revised to the original Table 4, it can be seen that some of the levels of service (LOS) for individual movements have changed at the two intersections on S 19th Avenue. The most appreciable difference would be at the Stucky Road and S 19th Avenue intersection during the peak pm hour, where the overall intersection LOS would drop from LOS “C” to LOS “D”. L TR L TR L TR L TR Control Delay (s/veh)29.2 19.8 19.1 22.7 6.5 20.1 8.3 19.2 LOS CB BC AC AB V/C Ratio 0.68 0.18 0.06 0.54 0.07 0.45 0.28 0.37 Queue Length (95%)41 14 25 56 L TR L TR L TR L TR Control Delay (s/veh)24.4 21.1 20.4 22.6 6.9 19.2 7.1 23.7 LOS CC CC AB AC V/C Ratio 0.54 0.15 0.03 0.39 0.10 0.37 0.28 0.67 Queue Length (95%)43 03 25 69 L TR L TR L TR L TR Control Delay (s/veh)19.8 36.4 15.5 36.6 13.2 33.1 15.6 25.0 LOS BD BD BC BC V/C Ratio 0.56 0.29 0.04 0.32 0.06 0.81 0.05 0.48 Queue Length (95%)62 13 210 17 L TR L TR L TR L TR Control Delay (s/veh)24.6 35.9 19.1 36.5 16.9 24.7 12.1 12.7 50.5 LOS CD BD BC BD V/C Ratio 0.61 0.24 0.02 0.32 0.13 0.51 0.23 0.98 Queue Length (95%)72 13 27 518 LTR LTR LTR LTR Control Delay (s/veh)7.3 7.4 9.4 10.3 LOS AAAB V/C Ratio 0.00 0.01 0.08 0.05 Queue Length (95%)0011 LTR LTR LTR LTR Control Delay (s/veh)7.4 7.4 10.2 11.0 LOS AABB V/C Ratio 0.00 0.03 0.02 0.06 Queue Length (95%)0111 LLR Control Delay (s/veh)8.0 11.7 11.0 LOS ABB V/C Ratio 0.02 0.03 0.13 Queue Length (95%)111 LLR Control Delay (s/veh)8.014.09.9 LOS ABA V/C Ratio 0.09 0.03 0.07 Queue Length (95%)111 S. 19th Avenue & Stucky Road AM Hour 28.4 C Movement Group 37.5 D 0.79 OVERALL 19.7 Table 4 Revised - Year 2032 Future Plus Site - Peak Hour Capacity Analysis Summary Intersection MOE EB WB OVERALL B S. 19th Avenue & Stucky Road PM Hour Movement Group S. 27th Avenue & Graf Street AM Hour NB SB Intersection Movement Group S. 19th Avenue & Graf Street AM Hour Movement Group S. 19th Avenue & Graf Street PM Hour Movement Group OVERALL 0.55 0.58 20.3 C 0.67 OVERALL Movement Group S. 27th Avenue & Stucky Road PM Hour Movement Group S. 27th Avenue & Graf Street PM Hour Movement Group S. 27th Avenue & Stucky Road AM Hour MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 Mailing Address: P.O. Box 80785 Billings, MT 59108-0785 Phone: 406-655-4550 FAX: 406-655-4991 Page 3 From this supplemental TIS analysis it appears that the addition of the Gran Cielo Subdivision, as proposed, would not substantially impact the surrounding streets or intersection operations, if it existed at the present time. However, future operations at the intersection of Stucky Road and S 19th Avenue would experience increased delays during the peak pm hour periods, if Gran Cielo is fully developed at the same time as all other area developments are in-place. It should be noted that future area street improvements have the potential to mitigate these impacts if implemented within the next 15 years. An extension of S 27th Avenue from Stucky Road to Garfield street would draw appreciable traffic demand from S 19th Avenue, which could allow acceptable operation at the Stucky Road and S 19th Avenue intersection in the year 2032. In the event that that the S 27th Avenue connection is not completed in that time period, dual left turn lanes for eastbound traffic on Stucky Road and an exclusive southbound right-turn lane on S 19th Avenue could be considered when future improvements to Stucky Road is designed. Robert R. Marvin, P.E., P.T.O.E. REVISED APPENDIX C-3 Future Capacity Calculations HCM Analysis Summary Future Plus SIte R Marvin Peak AM Hour Analysis Duration: 15 mins. Graf Street/S 19th Avenue 12/8/17 Case: Graf & 19th AM Future Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 166 0.92 2 54 0.92 2 43 0.92 2 20 0.92 2 56 0.92 2 250 0.92 2 39 0.92 2 451 0.92 5 30 0.92 2 150 0.92 2 255 0.92 5 161 0.92 2 15 5 0 0 --- --- 80 0 0 0 --- --- 10 5 0 0 --- --- 40 0 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP L L LTP LTP 0 20.0 3.5 1.5 13.0 4.0 0.0 24.0 4.0 2.0 Actuated 72.0 Sec 15.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * L 263 0.190 0.278 L 0.684 29.2 C 26.1 C TR 490 0.050 0.278 TR 0.182 19.8 B WB L 360 0.017 0.278 L 0.061 19.1 B 22.4 C TR 459 0.149 0.278 TR 0.536 22.7 C NB Lper 311 0.000 0.417 19.1 B Lpro 320 0.024 0.181 L 0.067 6.5 A * TR 1138 0.150 0.333 TR 0.450 20.1 C SB Lper 258 0.000 0.417 16.1 B * Lpro 320 0.092 0.181 L 0.282 8.3 A TR 1101 0.124 0.333 TR 0.371 19.2 B Intersection: Delay = 19.7sec/veh Int. LOS=B Xc= 0.55 * Critical Lane Group (v/s)Crit= 0.43 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Future Plus SIte R Marvin Peak AM Hour Graf Street/S 19th Avenue 12/8/17 Case: Graf & 19th AM Future App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 3 / 4 6.9 0.0 TR 1 / 1 22.2 0.0 All 12.6 0.0 WB L 0 / 1 7.9 0.0 TR 3 / 4 19.5 0.0 All 18.9 0.0 NB L 1 / 2 13.4 0.0 TR 4 / 5 13.0 0.0 All 13.0 0.0 SB L 2 / 5 13.6 0.0 TR 3 / 6 14.7 0.0 All 14.5 0.0 Intersect. 14.3 SIG/Cinema v3.08 Marvin & Associates Page 2 166 54 43 20 56 250 39 451 30 150 255 161 1 19 24 1 19 24 2 13 04 2 13 04 3 24 24 3 24 24 HCM Analysis Summary Future Plus Site R Marvin Peak PM Hour Analysis Duration: 15 mins. Graf Street/S 19th Avenue 12/8/17 Case: Graf & 19th PM Future Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 146 0.92 2 39 0.92 2 38 0.92 2 10 0.92 2 61 0.92 2 120 0.92 2 49 0.92 2 381 0.92 5 10 0.92 2 170 0.92 2 530 0.92 5 236 0.92 2 15 5 0 0 --- --- 30 0 0 0 --- --- 0 5 0 0 --- --- 80 0 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP L L LTP LTP 0 18.0 3.5 1.5 15.0 4.0 0.0 24.0 4.0 2.0 Actuated 72.0 Sec 15.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * L 297 0.134 0.250 L 0.535 24.4 C 23.4 C TR 439 0.038 0.250 TR 0.153 21.1 C WB L 331 0.008 0.250 L 0.033 20.4 C 22.5 C TR 424 0.097 0.250 TR 0.387 22.6 C NB Lper 158 0.000 0.417 17.8 B Lpro 369 0.030 0.208 L 0.101 6.9 A TR 1141 0.124 0.333 TR 0.372 19.2 B SB Lper 302 0.000 0.417 20.4 C * Lpro 369 0.105 0.208 L 0.276 7.1 A * TR 1118 0.222 0.333 TR 0.667 23.7 C Intersection: Delay = 20.3sec/veh Int. LOS=C Xc= 0.58 * Critical Lane Group (v/s)Crit= 0.46 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Future Plus Site R Marvin Peak PM Hour Graf Street/S 19th Avenue 12/8/17 Case: Graf & 19th PM Future App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 3 / 4 7.2 0.0 TR 1 / 3 17.4 0.0 All 11.5 0.0 WB L 0 / 0 0.0 0.0 TR 2 / 3 17.5 0.0 All 17.5 0.0 NB L 1 / 2 16.0 0.0 TR 3 / 5 13.0 0.0 All 13.2 0.0 SB L 2 / 6 13.3 0.0 TR 6 / 9 12.2 0.0 All 12.3 0.0 Intersect. 12.8 SIG/Cinema v3.08 Marvin & Associates Page 2 146 39 38 10 61 120 49 381 10 170 530 236 1 17 24 1 17 24 2 15 04 2 15 04 3 24 24 3 24 24 HCM Analysis Summary Future Plus Site R Marvin Peeak AM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 12/8/17 Case: Stucky & 19th AM Future Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 321 0.92 2 35 0.92 2 30 0.92 2 20 0.92 2 25 0.92 2 50 0.92 2 20 0.92 2 865 0.92 5 30 0.92 2 10 0.92 2 319 0.92 5 256 0.92 2 5 5 0 0 --- --- 10 5 0 0 --- --- 10 5 0 0 --- --- 70 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L LTP LTP L L LTP LTP 0 22.0 4.0 0.0 12.0 3.5 1.5 7.0 4.0 0.0 32.0 4.0 2.0 Actuated 92.0 Sec 19.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB Lper 197 0.000 0.185 22.4 C * Lpro 423 0.197 0.239 L 0.563 19.8 B TR 227 0.037 0.130 TR 0.286 36.4 D WB Lper 202 0.000 0.185 31.6 C Lpro 423 0.012 0.239 L 0.035 15.5 B * TR 219 0.042 0.130 TR 0.320 36.6 D NB Lper 240 0.000 0.413 32.7 C * Lpro 135 0.012 0.076 L 0.059 13.2 B * TR 1192 0.281 0.348 TR 0.807 33.1 C SB Lper 88 0.000 0.413 24.8 C Lpro 135 0.006 0.076 L 0.049 15.6 B TR 1138 0.168 0.348 TR 0.482 25.0 C Intersection: Delay = 28.4sec/veh Int. LOS=C Xc= 0.67 * Critical Lane Group (v/s)Crit= 0.53 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Future Plus Site R Marvin Peeak AM Hour Stucky Road/S 19th Avenue 12/8/17 Case: Stucky & 19th AM Future App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 6 / 6 12.4 0.0 TR 1 / 2 10.4 0.0 All 12.1 0.0 WB L 1 / 1 14.3 0.0 TR 2 / 3 10.5 0.0 All 11.4 0.0 NB L 0 / 2 6.5 0.0 TR 9 / 10 10.2 0.0 All 10.1 0.0 SB L 0 / 1 8.7 0.0 TR 5 / 7 12.2 0.0 All 12.1 0.0 Intersect. 11.1 SIG/Cinema v3.08 Marvin & Associates Page 2 321 35 30 20 25 50 20 865 30 10 319 256 1 22 04 1 22 04 2 11 24 2 11 24 3 7 04 3 7 04 4 32 24 4 32 24 HCM Analysis Summary Future Plus Site R Marvin Peeak PM Hour Analysis Duration: 15 mins. Stucky Road/S 19th Avenue 12/8/17 Case: Stucky & 19th PM Future Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 290 0.94 2 25 0.94 2 35 0.94 2 10 0.94 2 35 0.94 2 50 0.94 2 35 0.94 2 602 0.94 5 10 0.94 2 90 0.94 2 936 0.94 5 357 0.94 2 5 5 0 0 --- --- 10 5 0 0 --- --- 10 5 0 0 --- --- 150 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L LTP LTP L L LTP LTP 0 16.0 4.0 0.0 14.0 3.5 1.5 11.0 4.0 0.0 35.0 4.0 2.0 Actuated 95.0 Sec 19.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB Lper 210 0.010 0.200 26.4 C * Lpro 298 0.168 0.168 L 0.608 24.6 C TR 251 0.035 0.147 TR 0.235 35.9 D WB Lper 228 0.000 0.200 34.4 C Lpro 298 0.006 0.168 L 0.021 19.1 B * TR 251 0.047 0.147 TR 0.319 36.5 D NB Lper 79 0.000 0.432 24.3 C Lpro 205 0.021 0.116 L 0.130 16.9 B TR 1267 0.186 0.368 TR 0.505 24.7 C SB Lper 218 0.000 0.432 47.7 D * Lpro 205 0.054 0.116 L 0.227 12.7 B * TR 1243 0.361 0.368 TR 0.978 50.5 D Intersection: Delay = 37.5sec/veh Int. LOS=D Xc= 0.79 * Critical Lane Group (v/s)Crit= 0.63 SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Future Plus Site R Marvin Peeak PM Hour Stucky Road/S 19th Avenue 12/8/17 Case: Stucky & 19th PM Future App Group Lane (veh) Avg/MaxPer LaneQueues (mph) SpeedAverage Period) (% of PeakWorst LaneSpillback in EB L 6 / 7 11.1 0.0 TR 1 / 2 14.7 0.0 All 11.4 0.0 WB L 0 / 1 17.8 0.0 TR 2 / 3 9.4 0.0 All 9.5 0.0 NB L 1 / 2 7.5 0.0 TR 5 / 7 11.4 0.0 All 11.2 0.0 SB L 3 / 5 7.2 0.0 TR 15 / 18 6.9 0.0 All 6.9 0.0 Intersect. 8.3 SIG/Cinema v3.08 Marvin & Associates Page 2 290 25 35 10 35 50 35 602 10 90 936 357 1 16 04 1 16 04 2 13 24 2 13 24 3 11 04 3 11 04 4 35 24 4 35 24 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 27th & Graf St Agency/Co.Marvin Associates Jurisdiction City of Bozeman Date Performed 12/8/17 East/West Street Graf Street Analysis Year 2032 North/South Street S 27th Avenue Time Analyzed Peak AM Future Peak Hour Factor 0.85 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description Gran Cielo Subdivision TIS Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 1 0 0 1 0 Configuration LTR LTR LTR LTR Volume, V (veh/h)1 65 1 16 16 5 1 14 46 20 8 1 Percent Heavy Vehicles (%)2 2 2 2 2 2 2 2 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized No No No No Median Type/Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Critical Headway (sec)4.12 4.12 7.12 6.52 6.22 7.12 6.52 6.22 Base Follow-Up Headway (sec)2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Follow-Up Headway (sec)2.22 2.22 3.52 4.02 3.32 3.52 4.02 3.32 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)1 19 72 34 Capacity, c (veh/h)1574 1506 891 719 v/c Ratio 0.00 0.01 0.08 0.05 95% Queue Length, Q₉₅ (veh)0.0 0.0 0.3 0.1 Control Delay (s/veh)7.3 7.4 9.4 10.3 Level of Service, LOS A A A B Approach Delay (s/veh)0.1 3.3 9.4 10.3 Approach LOS A B Copyright © 2017 University of Florida. All Rights Reserved. HCS7™ TWSC Version 7.4 Generated: 12/9/2017 3:23:17 PMS 27th Graf AM Future Plus.xtw HCS7 Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 27th & Graf St Agency/Co.Marvin Associates Jurisdiction City of Bozeman Date Performed 12/8/17 East/West Street Graf Street Analysis Year 2017 North/South Street S 27th Avenue Time Analyzed Peak PM Future Peak Hour Factor 0.88 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description Gran Cielo Subdivision TIS Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 1 0 0 1 0 Configuration LTR LTR LTR LTR Volume, V (veh/h)1 39 1 45 71 22 1 8 5 11 21 1 Percent Heavy Vehicles (%)2 2 2 2 2 2 2 2 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized No No No No Median Type/Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Critical Headway (sec)4.12 4.12 7.12 6.52 6.22 7.12 6.52 6.22 Base Follow-Up Headway (sec)2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Follow-Up Headway (sec)2.22 2.22 3.52 4.02 3.32 3.52 4.02 3.32 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)1 51 16 38 Capacity, c (veh/h)1471 1548 713 639 v/c Ratio 0.00 0.03 0.02 0.06 95% Queue Length, Q₉₅ (veh)0.0 0.1 0.1 0.2 Control Delay (s/veh)7.4 7.4 10.2 11.0 Level of Service, LOS A A B B Approach Delay (s/veh)0.2 2.6 10.2 11.0 Approach LOS B B Copyright © 2017 University of Florida. All Rights Reserved. HCS7™ TWSC Version 7.4 Generated: 12/9/2017 3:20:40 PMS 27th Graf PM Future Plus.xtw HCS7 Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 27th Ave & Stucky Road Agency/Co.Marvin & Associates Jurisdiction City of Bozeman Date Performed 12/8/17 East/West Street Stucky Road Analysis Year 2032 North/South Street S 27th Avenue Time Analyzed Peak AM Future Peak Hour Factor 0.90 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description Gran Cielo Sub TIS Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 1 1 0 1 0 1 0 0 0 Configuration TR L T L R Volume, V (veh/h)297 6 27 157 14 80 Percent Heavy Vehicles (%)2 2 2 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized No No No No Median Type/Storage Left Only 1 Critical and Follow-up Headways Base Critical Headway (sec)4.1 7.1 6.2 Critical Headway (sec)4.12 6.42 6.22 Base Follow-Up Headway (sec)2.2 3.5 3.3 Follow-Up Headway (sec)2.22 3.52 3.32 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)30 16 89 Capacity, c (veh/h)1210 551 693 v/c Ratio 0.02 0.03 0.13 95% Queue Length, Q₉₅ (veh)0.1 0.1 0.4 Control Delay (s/veh)8.0 11.7 11.0 Level of Service, LOS A B B Approach Delay (s/veh)1.2 11.1 Approach LOS B Copyright © 2017 University of Florida. All Rights Reserved. HCS7™ TWSC Version 7.4 Generated: 12/9/2017 3:25:24 PMS 27th Stucky AM Future Plus.xtw HCS7 Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 27th Ave & Stucky Road Agency/Co.Marvin & Associates Jurisdiction City of Bozeman Date Performed 12/8/17 East/West Street Stucky Road Analysis Year 2032 North/South Street S 27th Avenue Time Analyzed Peak PM Future Peak Hour Factor 0.92 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description Gran Cielo Sub TIS Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 1 1 0 1 0 1 0 0 0 Configuration TR L T L R Volume, V (veh/h)207 20 104 314 13 50 Percent Heavy Vehicles (%)2 2 2 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized No No No No Median Type/Storage Left Only 1 Critical and Follow-up Headways Base Critical Headway (sec)4.1 7.1 6.2 Critical Headway (sec)4.12 6.42 6.22 Base Follow-Up Headway (sec)2.2 3.5 3.3 Follow-Up Headway (sec)2.22 3.52 3.32 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)113 14 54 Capacity, c (veh/h)1306 415 785 v/c Ratio 0.09 0.03 0.07 95% Queue Length, Q₉₅ (veh)0.3 0.1 0.2 Control Delay (s/veh)8.0 14.0 9.9 Level of Service, LOS A B A Approach Delay (s/veh)2.0 10.8 Approach LOS B Copyright © 2017 University of Florida. All Rights Reserved. HCS7™ TWSC Version 7.4 Generated: 12/9/2017 3:26:42 PMS 27th Stucky PM Future Plus.xtw