HomeMy WebLinkAboutStormWaterMaintenancePlanSTORM WATER MAINTENANCE PLAN
Lots 4 & 5, Block 5, Flanders Creek Subdivision
Oak & Cottonwood Apartments
City of Bozeman, Montana
PROPERTY OWNER'S ASSOCIATION RESPONSIBILITIES
FOR ROUTINE INSPECTION AND MAINTENANCE:
1. Routine Maintenance Activities (1-3 month interval)
• Designate no cut zones in the bottom of basins
• Remove trash, leaves, grass clippings and debris
• Establish a chemical free zone in and around the basin
• Inspect for uniform ponding, and that water disappears within three days
of rain events
2. Annual Maintenance Activities (Annually)
• Cut vegetation to 6” and remove clippings
• Re-establish vegetation on eroded and barren areas
• Remove excess sediment build-up
• Update maintenance plan and inspection log
3. Long Term Maintenance Activities (5-10 year interval)
• Consult a qualified professional to inspect and return storm water basin
back to initial design found on the subdivision and/or site plan engineering
plans.
• Dredge basin if sediment buildup is greater than 6”
• Re-establish vegetation
\20006\Storm Water Maintenance Plan.Doc