Loading...
HomeMy WebLinkAboutOak and Cottonwood Apartments Phase I response letter 1 January 31, 2022 City of Bozeman Planning Department 20 East Olive Street Bozeman, MT 59715 Re: Oak and Cottonwood Apartments - 21379 Response: This letter is in response to the Planning Department review of 12/28/2021. The following corrections/additions have been made to the Architectural drawings in order to comply with the review: 1. Cover: The site calculations have been corrected to show only the Phase 1 data. 2. A100: In accordance with the C.O.B. email of 2/28/2022 the open space has been adjusted to meet the occupancy requirements for Phase 1. This open space does not match the master site plan since Phase 1 and Phase 2 share open space in the master plan. When Phase 2 is constructed, the open space will be adjusted to be in conformance with the master site plan. 3. A300 and A301: There is no building mounted equipment so no screening is required. The elec. meters are screened with landscaping in accordance with Northwestern Energy requirements. The corrections for the Civil drawings have been addressed in a separate letter from the Civil Engineer. Thanks for everyone’s time in the review of the Cottonwood and Oak project. Jesse Sobrepena, AIA JDS Architects, Inc.