Loading...
HomeMy WebLinkAbout007 C400UtilityPlaninfo0.25 AC.10,857 SqFt SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSWWWWW WW WW WWW W W W W W W W W W W W W W W W W SS SS W WWSDSDSDTV WSS S15°44'14"W NOT FOR CONSTRUCTIONVERIFY SCALE! THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY! 2021COPYRIGHT © MORRISON-MAIERLE, INC., SHEET NUMBER PROJECT NUMBER DRAWING NUMBER DATEDESCRIPTIONNO.BY N:\6883\001\ACAD\SHEETS\6883.001-UTILITY PLAN.DWG PLOTTED BY:CELINE SAUCIER ON Aug/27/2021 REVISIONS DRAWN BY: DSGN. BY: APPR. BY: DATE: Q.C. REVIEW DATE: BY: 2880 Technology Blvd West Bozeman, MT 59718 406.587.0721 www.m-m.net engineers surveyors planners scientists MorrisonMaierle BOZEMAN GATEWAY SUBDIVISION PUD COMMON AREA 7 & 8 PARKING PUD 6883.001 MONTANA UTILITY PLAN 6 C400 X X JAU 8/2021 BOZEMAN EXISTING 8" SANITARY SEWER MAIN EXISTING 8" WATER MAIN EXISTING WATER SERVICE EXISTING SEWER SERVICE 1.ALL IMPROVEMENTS ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, 6TH EDITION DATED APRIL 2010 (MPWSS); THE CITY OF BOZEMAN MODIFICATIONS TO THE MPWSS; AND THE PROJECT SPECIFICATIONS. 2.THE CONTRACTOR SHALL RESTORE ALL ROADWAY SURFACES TO EQUAL OR BETTER CONDITION THAN EXISTED PRIOR TO EXCAVATION AS DETERMINED BY AGENCY, OWNER, AND/OR ENGINEER. 3.ASPHALT, CONCRETE CURB, AND SIDEWALK SHALL BE SAW CUT OR NEAT CUT AS APPROVED BY AGENCY AND/OR ENGINEER. 4.ALL TEXT AND FEATURES SHOWN SHADED ARE EXISTING. SEE SHEET C010 FOR MORE COMPLETE DEPICTION OF EXISTING IMPROVEMENTS. 5.THE LOCATION, DEPTH, AND SIZE OF THE EXISTING UTILITIES SHOWN ON THESE PLANS IS APPROXIMATE. THE CONTRACTOR SHALL VERIFY THE EXISTENCE, LOCATION, DEPTH, AND SIZE OF THE UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY DAMAGE TO THE EXISTING FACILITIES DUE TO FAILURE TO LOCATE OR PROPERLY PROVIDE PROTECTION WHEN LOCATION IS KNOWN. 6.ALL WATER VALVES OWNED AND OPERATED BY THE CITY OF BOZEMAN SHALL BE OPERATED BY AUTHORIZED CITY OF BOZEMAN PERSONNEL ONLY. 7.SEWER AND WATER CONNECTIONS SHALL BE PERFORMED BY A LICENSED PLUMBER. 8.GENERAL CONTRACTOR TO COORDINATE DRY UTILITY AND IRRIGATION REQUIREMENTS. GENERAL UTILITY NOTES: Know what's below. before you dig.Call R EXISTING BURIED POWER EXISTING GAS LINE EXISTING BURIED POWER EXISTING SANITARY SEWER SERVICE