HomeMy WebLinkAboutSewer_Water_DemandMemomemo
Page 1
TO: City of Bozeman, Engineering Division
FROM: Cooper Krause, PE
DATE:
June 16, 2022
JOB NO.: 5755.008
RE: MSU Innovation Campus- Aurora Site Plan- Sewer and Water Demand
CC: File
Urgent For Review Please Comment Please Reply For Your Use
The Aurora building is estimated to contain a maximum of 200 employees. Based on DEQ 4
Table 3.1-1, the estimated average wastewater flow from an office building is 13 gpd/ person.
The irrigation demand for the site is estimated to be 14,664 gallons per week with a maximum
flowrate of 35 gpm. The above average day demand does not include the irrigation demand. If
the irrigation is estimated to be 14,664 gallons per week for an average of 20 weeks per year
and spread across the entire year, the average day demand is increased by about 0.57 gpm.
Aurora Sewer Demand
Employees
Average Day
Demand (gpd/
person)
Average Day
Demand
(gpd)
Average Day
Demand
(gpm)
Equivalent
Population*Peaking Factor
Peak Hour
Flow (gpm)
200 13.0 2600 1.8 40 4.33 7.82
*Equivalent Population based on City Of Bozeman published value of 64.4 gpd/ person
Aurora Water Demand
Employees
Average Day
Demand (gpd/
person)
Average Day
Demand
(gpd)
Average Day
Demand
(gpm)
Max Day
Demand**
(gpm)
Max
Irrigation
Demand***
(gpm)
Max Day
Demand w/
Irrigation
(gpm)
200 13.0 2600 1.8 4.15 2.90 7.05
**Max Day = 2.3 x Average, Excluding Irrigation
*** Max Irrigation Demand Assumptions
a)14,664 gallons per week