Loading...
HomeMy WebLinkAboutSewer_Water_DemandMemomemo Page 1 TO: City of Bozeman, Engineering Division FROM: Cooper Krause, PE DATE: June 16, 2022 JOB NO.: 5755.008 RE: MSU Innovation Campus- Aurora Site Plan- Sewer and Water Demand CC: File Urgent For Review Please Comment Please Reply For Your Use The Aurora building is estimated to contain a maximum of 200 employees. Based on DEQ 4 Table 3.1-1, the estimated average wastewater flow from an office building is 13 gpd/ person. The irrigation demand for the site is estimated to be 14,664 gallons per week with a maximum flowrate of 35 gpm. The above average day demand does not include the irrigation demand. If the irrigation is estimated to be 14,664 gallons per week for an average of 20 weeks per year and spread across the entire year, the average day demand is increased by about 0.57 gpm. Aurora Sewer Demand Employees Average Day Demand (gpd/ person) Average Day Demand (gpd) Average Day Demand (gpm) Equivalent Population*Peaking Factor Peak Hour Flow (gpm) 200 13.0 2600 1.8 40 4.33 7.82 *Equivalent Population based on City Of Bozeman published value of 64.4 gpd/ person Aurora Water Demand Employees Average Day Demand (gpd/ person) Average Day Demand (gpd) Average Day Demand (gpm) Max Day Demand** (gpm) Max Irrigation Demand*** (gpm) Max Day Demand w/ Irrigation (gpm) 200 13.0 2600 1.8 4.15 2.90 7.05 **Max Day = 2.3 x Average, Excluding Irrigation *** Max Irrigation Demand Assumptions a)14,664 gallons per week b)Irrigate every other day