Loading...
HomeMy WebLinkAbout039 E1.1 ELECTRICAL SITE PLAN112255667710101111MMKKHHDDBBFF334488991212AALLJJGGCCEE7 PARKING STALLS8 PARKING STALLS5 PARKING STALLS9 PARKING STALLS8 PARKING STALLS9 PARKING STALLS6 PARKING STALLS7 PARKING STALLS16 PARKING STALLS16 PARKING STALLS16 PARKING STALLS6 PARKING STALLS3 PARKING STALLS9 PARKING STALLS7 PARKING STALLS7 PARKING STALLS11 PARKING STALLS11 PARKING STALLS6 PARKING STALLS5 PARKING STALLSVANVANCARCARCARCAR5 PARKING STALLSE4.12E4.13E4.14E4.111500 KVA TRANSFORMER ON HOUSEKEEPING PAD1EIGHT(8) SETS OF 4-600KCMIL, 1-600KCMIL GND, 4"C. PLUS TWO (2) 4"C SPARES DIRECT BURIED.F24TYPTYP.F222PROPOSED GAS & ELECTRICAL METERING3F23HV-1W1/1#10#10#10#10#10#10#10#101. ALL CONDUIT, CABLE, PIPING AND OTHER ASSOCIATED ELECTRICAL/MECHANICAL SYSTEMS NOT ASSOCIATED WITH TELECOMMUNICATION AREA ROOMS SHALL BE ROUTED AROUND SUCH SPACES IN CORRIDORS OR UNDERSLAB. (TYPICAL FOR SWITCH ROOMS, BATTERY ROOMS, TELCO, RECTIFIER/INVERTER ROOMS, ADJUNCT ROOMS, ACP ROOM, SECURITY ACCESS CONTROL AND CONTROL ROOM.)2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE SITE AND UNDERSTAND THE EXTENT OF THE ELECTRICAL SERVICE ENTRANCE AND PRIMARY SERVICE MODIFICATIONS REQUIRED AS INDICATED BY THE CONTRACT DOCUMENTS.3. UTILITY SHALL PROVIDE ALL CONDUIT, CONDUCTORS, TRENCHING AND BACKFILL FOR THE HIGH SIDE UTILITY CONNECTIONS TO THE PAD MOUNTED TRANSFORMERS UNLESS OTHERWISE NOTED. CONTRACTOR SHALL PROVIDE CONCRETE PAD, HIGH SIDE ELBOWS, AND LOW SIDE CONDUIT AND CONDUCTORS TO SERVICE ENTRANCE DISCONNECT.4. FIELD LOCATE UNDERGROUND PUBLIC AND OWNER UTILITIES OF ALL TRADES AND GROUNDING PRIOR TO ANY EXCAVATION. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REWORK OF ANY DAMAGED UTILITIES AND GROUNDING SYSTEMS.5. COORDINATE WORK WITH UTILITY. COORDINATE ALL SERVICE ENTRANCE OUTAGES WITH UTILITY AND VERIZON.6. ALL CONDUIT AND GROUNDING CONDUCTORS SHALL BE A MINIMUM OF 22" BELOW GRADE UNLESS OTHERWISE NOTED.7. A MINIMUM SEPARATION OF 12" SHALL BE PROVIDED BETWEEN PARALLEL AC POWER AND COMMUNICATION CONDUITS.8. A MINIMUM SEPARATION OF 6" SHALL BE PROVIDED BETWEEN AC POWER AND COMMUNICATION CONDUITS THAT CROSS.9. CONTRACTOR SHALL FOLLOW ALL WIRING CLEARANCE REQUIREMENTS PER SECTION 110.26A OF THE NEC CODE.10. EACH EXTERIOR AC POWER, CONTROL, ALARM, COMMUNICATION, AND CCTV CIRCUITS MUST HAVE A SURGE SUPPRESSOR INSTALLED.GENERAL NOTES:issue dateproject #phasesheetprojectownerrevision date100% CONSTRUCTION DOCUMENTS6/20/2022 4:41:15 PM6/15/221E1.16.10.2022ELECTRICAL SITE PLAN21087.00100% CDAURORA TECHNOLOGIESINNOVATION CAMPUS PARTNERS1" = 30'-0"1SITE POWER PLAN - A&EKEY NOTES:1 PROPOSED 25'-0" LIGHTING POLE WITH LITHONIA LIGHT FIXTURE.2 UTILITY TRANSFORMER PRIMARY ROUTING AND SIZING TO BE COORDINATED WITH LOCAL UTILITYNWE.3 PROPOSED 1500KVA UTILITY TRANSFORMER LOCATION. SPECIFIC LOCATION BEING COORDINATEDWITH LOCAL UTILITY NWE.NORTH30'15'0'30'60'SCALE : 1" = 30'1111