Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
037 A4.1 EXTERIOR ELEVATIONS
LEVEL 1100' -0"LEVEL 1100' -0"LEVEL 2116' -0"LEVEL 2116' -0"ROOF130' -0"ROOF130' -0"125671011348912LOWER ROOF118' -0"LOWER ROOF118' -0"12' - 0"31' - 8"20' - 0"10' - 0"20' - 0"10' - 0"20' - 0"10' - 0"20' - 0"20' - 0"37' - 2 1/2"18' - 0"11' - 0"18' - 0"11' - 0"18' - 0"11' - 0"18' - 0"36' - 6 1/4"4 3/4"9' - 0"7' - 0"10' - 0"27' - 11"12' - 10"26' - 0"10' - 0"26' - 0"10' - 0"26' - 0"49' - 10 7/8"6' - 0 1/8"29' - 9"2' - 9 1/4"WA-5SF-8SF-8SF-8SF-9SF-3SF-3SF-3SF-3SF-1SF-1SF-1SF-1WA-2WA-2WA-1WA-2WA-1WA-2WA-1WA-3WA-3WA-3WA-3WA-3WA-3WA-10SIGNAGEWA-1WA-1A9.47A9.313A9.310A9.39FOOTING96' -0"FOOTING96' -0"MP-3PP-1MP-1MA-1MP-1MP-2MP-1PP-1MP-1PC-1PC-1MP-3PC-1PC-1PC-1PC-2PC-2PC-2PC-2PC-2PP-1LEVEL 1100' -0"LEVEL 1100' -0"LEVEL 2116' -0"LEVEL 2116' -0"ROOF130' -0"ROOF130' -0"125671011348912LOWER ROOF118' -0"LOWER ROOF118' -0"9' - 0"10' - 0"7' - 0"9' - 0"11' - 8"10' - 0"10' - 0"20' - 0"10' - 0"20' - 0"10' - 0"20' - 0"10' - 0"20' - 0"60' - 2 1/2"26' - 0"10' - 0"26' - 0"10' - 0"26' - 0"7' - 4"33' - 7"12' - 0"340' - 4 3/4"4 3/4"36' - 10 1/4"18' - 0"11' - 0"18' - 0"11' - 0"18' - 0"11' - 0"18' - 0"12' - 8"29' - 9"WA-5WA-7WA-11SIGNAGEMA-1SF-1SF-1MP-3MP-2PC-2PC-1PC-2PC-1PC-2PC-1PC-2PC-1PC-2PC-1MP-3SF-1PP-1A9.24A9.26A9.210A9.214FOOTING96' -0"FOOTING96' -0"PP-1PP-1MP-2MP-1MA-1MA-1MA-1MA-1MP-2MP-1MP-2PP-1MA-1T.I.LEVEL 1100' -0"LEVEL 2116' -0"ROOF130' -0"MKHDBFLOWER ROOF118' -0"ALJGCE10' - 0"7' - 0"9' - 0"6' - 4 1/2"78' - 8"9' - 5 1/2"11' - 3"15' - 6"21' - 9"12' - 6"4 3/4"20' - 6 1/4"10' - 0"6' - 0"24' - 0"3' - 8"24' - 0"32' - 8"33' - 10 1/4"4 3/4"154' - 8 1/2"10' - 0"WA-7WA-3SF-6WA-3OVERHEAD COILING DOOROVERHEAD COILING DOORWA-7WA-3WA-3WA-5WA-5SF-11SF-10A9.36A9.33A9.34A9.213A9.46FOOTING96' -0"MP-3MP-1MA-1MA-1PP-1PP-1AL-1MP-1MA-1MP-1MP-2PP-1PP-1MP-2CW-3MASONRY CONTROL JOINTMASONRY CONTROL JOINTT.I.LEVEL 1100' -0"LEVEL 2116' -0"ROOF130' -0"MKHDBFLOWER ROOF118' -0"ALJGCEWA-1WA-1WA-2OVERHEAD COILING DOORWA-11SF-13WA-10WA-9176' - 8"16' - 11"155' - 6"4' - 3"21' - 8"20' - 0"10' - 0"10' - 0"8' - 0"20' - 0"12' - 0"20' - 0"10' - 0"20' - 0"1' - 4"A9.49A9.413A9.414FOOTING96' -0"A9.410A9.416MP-3MP-1AL-1PP-1PC-2PC-1PC-2PC-1PC-2PC-1PC-2AL-1MP-1PP-1CALCULATIONSTRANSPARENCY:SOUTH ELEVATION:(BLOCK FRONTAGE)0'-0"26'-0"3,204 SF32%MIN HGT FROM GRADEMAX HGT FROM GRADETOTAL AREA% OF TOTAL FACADESIGNAGE:PER 38.560.060:NORTH ELEVATION:SOUTH ELEVATION:ALLOWEDPROPOSEDPROPOSED= 85 SF=250 SF -165 SF= 42.5 SF= 42.5 SFEAST ELEVATION:(BLOCK FRONTAGE)EAST FACADE GREATER THAN 20' FROM SIDEWALKMATERIAL PALETTEPC-1: PRECAST CONC. w/ VERT. RIB TEXTUREMA-1 & PC-2: MASONRY VENEERSF-1: GLAZED ALUMINUM STOREFRONTAL-1: SIMULATED WOOD PLANK SIDING/SOFFITPP-1: PHENOLIC PANEL SIDINGMP-1: METAL PANEL: BOX-RIB SIDING -NARROWPT-1: EXP. ARCH STEEL & METAL TRIM / COPINGMP-2: METAL PANEL: BOX-RIB SIDING -WIDEMP-3: METAL PANEL: FLAT PANELMASONRY VENEERMA-1METAL PANEL -TYPE 1MP-1PP-1MP-2AL-1PC-1PC-2METAL PANEL -TYPE 2METAL PANEL -TYPE 3SIMULATED WOOD PLANK ALUM. SIDINGPRECAST CONCRETE PANEL w/ TEXTURED FORM LINERPRECAST CONCRETE PANEL w/ THIN BRICKSF-1GLAZED ALUMINUM STOREFRONTMP-3PHENOLIC PANELMATERIAL LEGENDissue dateproject #phasesheetprojectownerrevisiondate100% CONSTRUCTION DOCUMENTS 6/20/2022 2:59:37 PM6/15/20221A4.106.10.2022EXTERIOR ELEVATIONS21087.00100% CDAURORA TECHNOLOGIESINNOVATION CAMPUS PARTNERSCORE, SHELL AND SITE PACKAGE1/16" = 1'-0"NNORTH ELEVATION1/16" = 1'-0"SSOUTH ELEVATION1/16" = 1'-0"EEAST ELEVATION1/16" = 1'-0"WWEST ELEVATION0'16'8'16'32'SCALE : 1/16" = 1'-0"1