HomeMy WebLinkAbout035 A2.4 ROOF PLAN EAST1. PROVIDE ROOF CRICKETS AT ALL UPSLOPE AREAS OF MECHANICAL EQUIPMENT, CURBS AND ROOF HATCHES.2. CRICKETS TO SLOPE POSITIVELY 1/4" MINIMUM PER FOOT FROM HORIZONTAL PLANE.3. MAINTAIN 1/8" PER FOOT MINIMUM FOR ALL CRICKET VALLEYS.4. CRICKETS SHOWN ARE FOR REFERENCE ONLY; CONTRACTOR TO PROVIDE DETAILED LAYOUT PLAN FOR ARCHITECT'S REVIEW PRIOR TO INSTALLATION.5. ROOF PENETRATIONS OF ANY KIND SHALL NOT BE LOCATED IN CRICKET VALLEYS.6. IN ADDITION TO OPENING AND EQUIPMENT SHOWN ON THIS DRAWING, MECHANICAL AND ELECTRICAL DRAWINGS7. INDICATE ADDITIONAL ITEMS PENETRATING THE ROOF ASSEMBLY; PROVIDE APPROPRIATE FLASHING.8. REFERENCE MECH DRAWINGS FOR VENT LOCATIONS, EQUIPMENT LOCATIONS, AND ADDITIONAL INFORMATION, TYP.1122556677MMKKHHDDBBFF3344A4.1EALJGCEA5.12A5.12A5.13A5.13A5.24A5.24A5.25BA5.25BSLOPE1/8"=12"SLOPE1/4"=12"SLOPE1/4"=12"SLOPE1/4"=12"SLOPE1/4"=12"SLOPE1/4"=12"SLOPE1/4"=12"SLOPE1/4"=12"VALLEYSLOPE1/8"=12"SLOPE1/8"=12"VALLEYSLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"VALLEYV A L L E Y
VALLEYV A L L E Y
VALLEYV A L L E Y
VALLEYV A L L E Y
VALLEYV A L L E Y
VALLEYV A L L E Y SLOPE1/4"=12"SLOPE1/4"=12"SLOPE1/4"=12"SLOPE1/4"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"VALLEYVALLEYVALLEYVALLEYVALLEYVALLEYVALLEYVALLEYVALLEYVALLEYVALLEYVALLEYRIDGERIDGESLOPE1/4"=12"RIDGESLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"SLOPE1/8"=12"VALLEYVALLEYVALLEYVALLEYVALLEYVALLEYVALLEYVALLEYVALLEYVALLEYVALLEYVALLEYRIDGERIDGEVALLEYROOF DRAIN WITH DOWNSPOUT TO LOWER ROOFROOF DRAIN WITH DOWNSPOUT TO LOWER ROOFROOF DRAINROOF DRAIN WITH DOWNSPOUT TO LOWER ROOFROOF DRAIN WITH DOWNSPOUT TO LOWER ROOFROOF DRAIN WITH DOWNSPOUT TO LOWER ROOFROOF TOP MECHANICAL SCREEN -T.I. PACKAGEROOF TOP MECHANICAL UNITS30' - 0"18' - 0"12' - 0"6' - 0"30' - 0"12' - 0"A2.128A2.128SKYLIGHTSKYLIGHTSKYLIGHTSKYLIGHTSKYLIGHTSKYLIGHTA9.11BBBBBBSLOPE1/4"=12"SLOPE1/4"=12"SLOPE1/4"=12"SLOPE1/4"=12"9' - 6"16' - 0"RH2T.I.T.I.T.I.issue dateproject #phasesheetprojectownerrevisiondate100% CONSTRUCTION DOCUMENTS 6/20/2022 2:58:41 PMA2.406.10.2022ROOF PLAN EAST21087.00100% CDAURORA TECHNOLOGIESINNOVATION CAMPUS PARTNERSCORE, SHELL AND SITE PACKAGEROOF PLAN NOTESNORTH0'8'4'8'16'SCALE : 1/8" = 1'-0"1/8" = 1'-0"1EAST ROOF