Loading...
HomeMy WebLinkAbout028.1 G3.1SIGNAGEPLANBLOCK FRONTAGE36' - 0"B LOCK F RONTAG E52' - 0"F R O N T A G E103' - 6 1/2 "ARCHITECTURE · PLANNING · DEVELOPMENT · INTERIORS1425 WEST MAIN ST. · SUITE A · BOZEMAN, MONTANA · 59715TELEPHONE: (406) 587-1204 · EMAIL: FHA@FHARCHITECTS.COM© 2022 FHA. It is unlawful to use any or all of these document without the expressed written consecnt of Faure Halvorsen Architects PC.A R C H I T E C T SF A U R E H A L V O R S E NDATE: 20224/28/2022 3:44:44 PMG3.1LONG SHOT EQUITY, LLCCHERRY CREEK MIXED USE350 GALLATIN PARK DRIVE BOZEMAN, MTSIGNAGEPLANJOB NO: 00-0001" = 20'-0"SIGNAGE PLAN1SIGNAGE NOTES:ALL NEW SIGNS MUST BE PERMITTED AND/OR APPROVED BY THE CITY BEFORE ERECTED.ALL EXISTING SIGNS MUST BE REMOVED WHEN THE PERTAINING BUSINESS LEAVES THE BUILDING.ALL BUSINESSES MUST MAINTAIN THEIR SIGNS IN A WORKING AND ATTRACTIVE MANNER.WINDOW & DOOR SIGNAGE MAY NOT EXCEED 25% OF OVERALL WINDOW/DOOR UNIT AREA. USE THETYPICAL WINDOW/DOOR SIGNAGE AS A GUIDELINE FOR FUTURE WINDOW COVERAGE. THE WINDOWSIGNAGE LAYOUT IS THE RECOMMENDED AREAS FOR FUTURE SIGNAGE.IF NEW SIGNAGE LIGHTING IS REQUESTED, THEN NEW LIGHTING MUST BE CONSISTENT W/ EXISTINGSIGNAGE LIGHTING.WALL SIGNS: CANOPY, WINDOW AND AWNING SIGNS SHALL BE CLASSIFIED AS WALL SIGNS. WALLSIGNS SHALL NOT PROJECT ABOVE THE TOP OF A WALL OR PARAPETTOTAL SIGNAGE SQ. FT. (SEC. 38.560.060)BUILDING 6 EASTBUILDING LENGTH 52' 0" 25' @ 2 = 50 SQ.FT.2' @ 1.5 = 3 SQ.FT.TOTAL = 53 SQ.FT.BUILDING 2 EASTBUILDING LENGTH 36' 0 "25' @ 1 = 25 SQ.FT.11' @ 1.5 = 16.5 SQ.FT.TOTAL = 41.5 SQ.FT.CHERRY CREEK MIXED USE SIGNAGE = 94.5 SQ.FT.ALL SIGNAGE AND EXTERIOR LIGHTING MUST COMPLY WITH THE CITY OF BOZEMAN CODE OFORDINANCES AS SPECIFIED IN SECTION 38.28.010, 38.28.020, 38.28.060 AND 38.28.100NOTE: THE "PROPOSED SIGNAGE BY FUTURE TENANT" AND "PROPOSED FUTURE SIGNAGE"INDICATED ON THE ELEVATIONS SHOWS POTENTIAL LOCATIONS OF SIGNAGE THAT WILL BESUBMITTED AT A LATER DATE. IT DOES NOT REPRESENT ACTUAL SQUARE FOOTAGE OF SIGNAGE.THE FUTURE TOTAL COMBINED SIGNAGE SHALL NOT EXCEED 400 SF PER BUILDING.TRUENORTHTRANSPARENCY CALCULATIONS LANDSCAPED BLOCK FRONTAGEMIN 25% OF THE GROUND FLOOR BETWEEN 4' - 8' ABOVE SIDEWALK (TABLE 38.510.030.C BZN U.D.C.)CALCULATIONSMIN. & MAX. TRANSPARENCY FROM 4' - 8'BUILDING 2 NORTH ELEVATIONTOTAL - 2,496 SF4' -8' -416 SFGLAZING - (MIN. 104 SF) ACTUAL - 120 SF 29%BUIDLING 2 EAST ELAVATIONTOTAL - 936 EF4' -8' -144 SFGLAZING - (MIN. 36 SF) ACTUAL - 44 SF 30%BUIDLING 6 EAST ELAVATIONTOTAL - 1,248 SF4' -8' -208 SFGLAZING - (MIN. 52 SF) ACTUAL - 84 SF 40%