Loading...
HomeMy WebLinkAbout010 PH-1 Phase PlanLOT 12BLOCK 22.01 ACRESMONTANA RAIL LINK //////////// /// ////////////////// /// /// /// /////////8 W 8 W EEEEEG G G GTT TTT T /// ////// /// ///8 SS8 SS8 SS8 SS8 W8 W8 W8 W8 W8 W8 W8 W8 W8 WSS SS SS /// /// ////// /// ////// /// /// ////// /// /// /// /// /// //////////////////////// /// /// /// /// /// /// /// /// /// /// /// /// ///////// /// /// /// ///TEG//////////// ////// /// /// /// /// /// /// /// ////////////////// /// /// /// /// /// /// /// /// 8 W 8 W 8 W8 WWS WS WS WS WS WSWSWS WS WS WS WS WSWS WS 8 W /////////T T T T T T T T T T T T T TTTTTTTTGGGGGGGGGG G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E EE EEEEEEEEEE 10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SSESSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS8 S S 8 S SSSSSWSWSWSWSWSWSWSGGGGGGG8 SS8 SS8 SS8 SS8 SS///////// /// ///PRIVATE OPENPRIVATE OPENSPACE "C"EXISTINGCOMMERCIALBUILDINGEXISTING TRAILCO V E R E D TRA S H BUILDING 1BBUILDING 1ABUILDING 3BUILDING 5BUILDING 4BUILDING 6BUILDING 2WWWWWWWWWWW W W WWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSDSDSDSDSD4 W4 W4 W4 W4 W 4 W 4 W 4 W 4 W 4 W 4 W W W W W W WW W W WWWWWWSSSSSSSSSDSDSDSD SDSDSDSDSDSDSD292.7'216.1'173.7'1 1 4 . 4 '119.4' 124.0'155.8'SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSEEEEEEEEEEEEEEEEE EEE EEG EGGG GG G G GG GGGGGG G G G G G GGGGGGGGGGGGEESSSSWWWWWE E E E E E E EEEEEEEEG G G GGGEEEEEEEEGGGGPHASE 3PHASE 3PHASE 2PHASE 2PHASE 1PHASE 1PHASE 1ACOMPLETE PONDIN PHASE 1333333333333333333222222222222221111111111111111111111111A1A1A1A1A1A1A1A11"X17": 1"= 40 ftGRAPHIC SCALE1 inch = ft.0( IN FEET )10202020H:\1086\017\ACAD\SHEETS\Exhibits\PHASE PLAN.dwg Plot Date: 1/20/2022 11:40 AMHEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2022VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY© HEADWATERS ENGINEERING, INC.REVISION DATE:190 NORTHSTAR LANE, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN01/14/22GPSPHASE EXHIBIT350 GALLATIN PARK DRIVECHERRY CREEK MIXED USE1086.017PH-1PHASE 1:INSTALLATION OF WATER & SEWER SERVICES FORBUILDINGS 1B, 2, 3, 4, 5 AND 6. INSTALLATION OF WATERSERVICE FOR BUILDING 1A. INSTALLATION OF ALLPOWER, GAS, AND COMMUNICATIONS MAINS.INSTALLATION OF TRASH ENCLOSURE, STORMSEPARATOR AND OUTLET PIPE, ALL PARKING LOTASPHALT AND CURB, EXCEPT FOR TIE-INS IN FRONT OFPHASES 1A - 3 BUILDINGS. ACCESS ONTO GALLATIN PARKDRIVE, STRIPING FOR PHASE 1 PARKING LOT SPACES,STRIPING OF HANDICAP SPACES, INSTALLATION OFHANDICAP SIGNS AND FIRE LANE SIGNS, CLUSTERMAILBOX, VALLEY GUTTER, CROSSWALKS, ANDSIDEWALK TO TRASH ENCLOSURE. PHASE 1 WILL ALSOINCLUDE CONSTRUCTION OF BUILDINGS 2 AND 6,INCLUDING SIDEWALK, BIKE RACKS, AND GARAGEAPPROACHES ADJACENT TO THOSE BUILDINGS ANDSIDEWALK REQUIRED FOR CONNECTIVITY BETWEENBUILDINGS. THE STORM POND, AND ALL LANDSCAPINGWITHIN THE PHASE 1 BOUNDARY IS ALSO INCLUDED.PHASE 1A:CONSTRUCTION OF BUILDING 4, INCLUDING SIDEWALK,AND GARAGE APPROACHES ADJACENT TO BUILDING 4.INSTALLATION OF DRYWELL NORTH OF BUILDING 4,STRIPING OF PARKING STALLS IN THE PHASE 1ABOUNDARY. LANDSCAPING WITHIN PHASE 1A BOUNDARY.PHASE 2:CONSTRUCTION OF BUILDING 3 AND BUILDING 5,INCLUDING SIDEWALK, BIKE RACKS, AND GARAGEAPPROACHES ADJACENT TO THOSE BUILDINGS.INSTALLATION OF FENCES BETWEEN BUILDINGS 3 AND 5AND BETWEEN BUILDINGS 5 AND 4. LANDSCAPING WITHINPHASE 2 BOUNDARY.PHASE 3:CONSTRUCTION OF BUILDING 1A AND BUILDING 1B,INCLUDING SIDEWALK, AND GARAGE APPROACHESADJACENT TO THOSE BUILDINGS. INSTALLATION OFSEWER SERVICE TO BUILDING 1A.RESIDENTIAL OPEN SPACE AND PARKING CALCS BY PHASEOPEN SPACE: 150 SF PER 2-BR UNIT REQUIREDRESIDENTIAL PARKING REQUIRED = 2 SPACES PER 2-BDR UNITCOMMERCIAL PARKING REQUIRED = 1/1,000SF + 1 PER 2 EMPLOYEES(TREAT AS 2 SPACES PER 1,000 SF)PHASE 1:BUILDINGS 2 (4-PLEX) AND 6 (DUPLEX):6 UNITS X 150 SF = 900 SF REQUIRED1,622 SF OPEN SPACE PROVIDEDPARKING REQUIRED: 17 SPACES ( 9 COMMERCIAL & 8 RESIDENTIAL)PARKING PROVIDED: 24 SPACESPHASE 1A:BUILDING 4 (4-PLEX)4 UNITS X 150 SF = 600 SF REQUIRED1,622 SF OPEN SPACE PROVIDED(600 SF PHASE 1A + 900 SF PHASE 1A = 1,500 SF TOTAL REQ.)PARKING REQUIRED: 10 SPACES ( 6 COMMERCIAL & 4 RESIDENTIAL)(17 PHASE 1 PLUS 10 PHASE 1A = 27 TOTAL REQ.)PARKING PROVIDED: 32 SPACES (8 W/ PHASE 1A + 24 W/ PHASE 1)PHASE 2:BUILDINGS 3 (4-PLEX) AND 5 (DUPLEX):6 UNITS X 150 SF = 900 SF REQUIRED3,948 SF OPEN SPACE PROVIDED (NE AND SW LOCATIONS)(900 SF PHASE 2 + 1,500 SF PHASE 1/1A = 2,400 SF TOTAL REQ.)PARKING REQUIRED: 17 SPACES ( 9 COMMERCIAL & 8 RESIDENTIAL)(27 PHASE 1/1A + 17 PHASE 2 = 44 TOTAL REQ.)PARKING PROVIDED: 46 SPACES (32 W/ PHASE 1/1A + 14 W/ PHASE 2)PHASE 3:BUILDINGS 1A (4-PLEX) AND 1B (4-PLEX):8 UNITS X 150SF = 1,200 SF REQUIRED3,948 SF OPEN SPACE PROVIDED (NE AND SW LOCATIONS)(1,200 SF PHASE 3 + 2,400 SF PHASE 1/1A/2 = 3,600 SF TOTAL REQ.)PARKING REQUIRED: 20 SPACES ( 12 COMMERCIAL & 8 RESIDENTIAL)(44 PHASE 1/1A + 20 PHASE 3 = 64 TOTAL REQ.)PARKING PROVIDED: 64 SPACES (46 W/ PHASE 1/1A/2 + 18 W/ PHASE 3)NUMBER SHOWN INPARKING STALLDENOTES PHASETHAT STALL ISCOMPLETED2,326 SF OF RESIDENTIAL OPEN SPACENO DIMENSION LESS THAN 15'(BIKE RACK & BIKE REPAIR STATIONAMENITIES)1,622 SF OF RESIDENTIAL OPEN SPACENO DIMENSION LESS THAN 15'(W/ TRAIL, FLOWER GARDEN & BENCHAMENITIES)