Loading...
HomeMy WebLinkAbout006 C-5-DetailsPERMITREQUIRED$100 FINEVANACCESSIBLE HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2022VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\1086\017\ACAD\SHEETS\C-5-DETAILS.dwg Plot Date: 2/5/2022 9:18 AM© HEADWATERS ENGINEERING, INC.REVISION DATE:190 NORTHSTAR LANE, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONC-51086.017GALLATIN PARK MIXED USE350 GALLATIN PARK DRIVEDETAILSGPS01/11/22BOZEMANMONTANAFLAGINVERTED "U" BIKE RACK DETAILBOLT TOCONCRETE30"-36"19"-35"2" SQUAREOR ROUNDSTEEL POSTSIGN POSTFOUNDATIONPER CITY MPWMOD DETAIL09810-1HANDICAP PARKING SIGN DETAIL1.0'4.5'0.5'2.0'1.5'* SIGN CAN BEMOUNTED ON WALLOF BUILDING ATSAME HEIGHTTBCINTEGRAL CURBAND GUTTERPARKING LOT TYPICAL SECTIONPLANT MIX ASPHALT SURFACING3" MIN DEPTH @ 93% MDCRUSHED GRAVEL BASE COURSE6" MIN DEPTH @ 95% MDD6" MINUS SUB-BASE COURSE15" DEPTH @ 95% MDDON GEOTEXTILE FABRIC*COMPACTEDNATIVE SUBGRADEFLOW-THRU GUTTER2.5'*FABRIC NOT NEEDED IF SUBGRADE ISEXCAVATED TO NATIVE GRAVELS. IF SUBGRADEIS SOFT AND UNSTABLE, INSTALL LAYER OFMIRAFI RS580I GEOSYNTHETIC AS DIRECTED BYTHE ENGINEER/GEOTECH.*FLOW -THRU & CONCRETE BORDER DETAILS ADDEDGARAGE DOOR ACCESSFRONT OF BUILDING2% MAX6" CONCRETE,REINFORCED W/FIBER MESH7.0'VARIES3' TO 4'VARIES0.1' LIPCURB CUT DETAILTBCCURB FLOWLINECURB CUT DIMENSION (18" OR 24")ASPHALT PAVEMENTDRYWELL