Loading...
HomeMy WebLinkAbout003 C-2_Site Plan////////////////////////////////////////////////8 WEEG GT T/// ///8 SS8 SS8 W8 W8 W8 W8 W8 W8 WSS //////////// /// /// /// /// /// //////////// /// /// /// /// /// /// /// /// ////// ////// /// /// /// /// ///////// /// /// /// /// 8 W 8 W 8 W8 W8 W8 WWS WS WS WSWS WS WS8 W8 W8 W///////// T T T T T T TTTTGGGGGGG G G G G E E E E E E E E E EEEE 10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SSSSSSSSSSSSSSSSSSSSSS8 SS 8 S S 8 SS8 SS8 SS8 SSSSWSWSWSGGGGGGGGGGGG8 SS8 SS8 SS8 SS8 SS8 SS/// /// /// /// /// /// ///WWWWWWWSSSSSSSSSSSSSDSD4 W4 W4 W 4 W 4 W W W W WWWSSSSSSSDSDSDSD292.7'216.1'173.7'1 1 4 . 4 '119.4' 124.0'155.8'SSSSSSSSSSSSSSSSSSEEEEEEEEEEG GG GGG G G G GGGGGGWWE E E EEEEG GGEEEGGEEESSSSWSWSWSGGGTTT11"X17": 1"= 60 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )15303030H:\1086\017\ACAD\SHEETS\C-2_SITE PLAN.dwg Plot Date: 1/20/2022 4:26 PMSERPOFSTNMOAANG N DR SCHULTZGARRETT41803 PEATNIGSIEOLEREE ERIEN HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2022VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY© HEADWATERS ENGINEERING, INC.REVISION DATE:190 NORTHSTAR LANE, BOZEMAN, MT 59718HEADWATERSMT.NET 406-581-5730PROJECT LOCATIONMONTANABOZEMAN01/11/22GPSGENERAL CIVIL PLAN/SITE PLAN350 GALLATIN PARK DRIVECHERRY CREEK MIXED USE1086.017C-2GALLATIN PARK DRIVE60' R.O.W.3' REAR SETBACKLOT 12BLOCK 22.01 ACRESPRIVATE OPENSPACE "B"3' SIDE SETBACK3' REAR SETBACK3' REAR SETBACK3' SIDE SETBACK20' FR O N T S E T B A C K PRIVATE OPENSPACE "C "EXISTINGCOMMERCIALBUILDINGEXISTINGCOMMERCIALBUILDINGEXISTINGCOMMERCIALBUILDINGEXISTINGCOMMERCIALBUILDINGLOT 1BLOCK 31.158 ACRESLOT 2BLOCK 30.436 ACRESLOT 6BLOCK 10.322 ACRESLOT 7BLOCK 10.322 ACRESLOT 5BLOCK 10.533 ACRESLOT 11BLOCK 20.627 ACRESLOT 10BLOCK 20.432 ACRESEXISTINGCOMMERCIALBUILDINGEXISTING UTILITYROAD/TRAILEXISTING UTILITYROAD/TRAILGALLATIN PARK DRIVEEXISTING CONCRETESIDEWALKCONCRETECROSSWALKCONCRETECROSSWALKCOV E R E D TRA S H HYDRANTBUILDING 1BBUILDING 1ABUILDING 3BUILDING 5BUILDING 4BUILDING 6BUILDING 220" AC SEWERMAIN10" PVC SEWERMAINCURB CUTTO CAPTURESURFACE FLOWFROM PARKING LOTAND BUILDINGS3' WIDE CONCRETEVALLEY GUTTER3' WIDE CONCRETEVALLEY GUTTERPROPOSEDSTORM POND292.7'216.1'173.7'1 1 4 . 4 '119.4'124.0'155.8'EXISTING HIGH PRESSURE GAS MAINEXISTINGREGIONALSTORM PONDCLUSTERMAILBOXFENCE FORSHIELDINGUTILTIES, TYPEXISTINGTREESGA L L A T I N P A R K D R I V E (60' R . O . W . ) OT H E R B L O C K F R O N T A G E VI S I O N T R I A N G L EPROPOSED SNOWSTORAGEBICYCLE RACK(2) SPACES & BIKEREPAIR STATION2,326 SF OF RESIDENTIAL OPEN SPACENO DIMENSION LESS THAN 15'(BIKE RACK & BIKE REPAIR STATIONAMENITIES)1,622 SF OF RESIDENTIAL OPEN SPACENO DIMENSION LESS THAN 15'(W/ TRAIL, FLOWER GARDEN & BENCHAMENITIES)7' SIDEWALK7' SIDEWALK18.0'24.0'18.0'18.0'18.0'18.0'24.0'24.0'24.0'VAN ACCESSIBLE SPACESPARKING AND OPEN SPACE NOTES1. 64 OFFSTREET PARKING SPACES SHOWN = 9,792 SF PARKING STALLS (NOT COUNTING GARAGE SPACES)2. 60 PARKING SPACES REQUIRED (WITH REDUCTION)3. 3 ACCESSIBLE PARKING SPACES PROVIDED, WITH 3 VAN ACCESSIBLE.4. 7 BUILDINGS TOTAL WITH 5 FOUR-PLEXES AND 2 DUPLEXES. EACH RESIDENTIAL UNIT SHALL BE 2 BEDROOMS.5. 3,600 SF OF RESIDENTIAL OPEN SPACE REQUIRED. SHARED RESIDENTIAL OPEN SPACE PROPOSED AS SHOWN.6. M-1 ZONING7. BLOCK FRONTAGE = OTHERCONSTRUCTION NOTES:1. ALL ISLANDS ARE 8' WIDE MINIMUM.2. PARKING SPACES ARE 9' MIN. WIDTH.3. DRIVE AISLES ARE 24' MIN. WIDTH.4. SEE GEOTECHNICAL REPORT FOR PARKING LOT SECTION DEPTHS.5. CURB RADII ARE TO BE 3' UNLESS OTHERWISE NOTED.6. ALL INFRASTRUCTURE SHALL BE INSTALLED IN ACCORDANCE WITH THELATEST EDITION OF THE MONTANA PUBLIC WORKS, THE CITY OF BOZEMANMODIFICATIONS TO MPWSS 6TH EDITION, AND CITY OF BOZEMAN DESIGNSTANDARDS AND SPECIFICATIONS POLICY DATED MARCH 2004.7. THE CONTRACTOR SHALL CONTACT ONE CALL @ 1-800-424-5555 FOR ONSITEUTILITY LOCATION. ALL UTILITIES SHALL BE MARKED BEFORE DIGGING.UTILITIES SHOWN ARE FOR PLANNING PURPOSES ONLY.8. THE CONTRACTOR SHALL NOTIFY THE BOZEMAN WATER & SEWERDEPARTMENT A MINIMUM OF 24 HOURS PRIOR TO BEGINNING ANY WORK.9. CONSTRUCTED SIDEWALKS SHALL MEET ALL SPECIFICATIONS ANDREQUIREMENTS OF THE CITY OF BOZEMAN SIDEWALK POLICY.10. CONSTRUCTION TRAFFIC WILL LEAVE THE SITE THROUGH THE PROPOSEDACCESSES AND THEN TRAVEL ON GALLATIN PARK DRIVE TO MANLEY ROAD,THEN SOUTH TO GRIFFIN DRIVE.LEGENDUNDERGROUND ELECTRICSEWER PIPEWATER SERVICE LINEEASEMENT OR SETBACK AS LABELEDUNDERGROUND GAS LINEUNDERGROUND COMMUNICATION LINEEXISTING CONTOURS 0.5' INTERVAL4" IRRIGATION CONDUITPROPOSED SIDEWALKEXISTING CURB AND SIDEWALKPROPOSED SNOWSTORAGEEXISTINGREGIONALSTORM PONDBOUNDARYEXISTING TRAILPROPOSED SNOWSTORAGEPROPOSED SNOWSTORAGEROOF LINEENCROACHESINTO SETBACKAPPROX. 2'24'BICYCLE RACK(4) SPACES7' SIDEWALK7' SIDEWALK7' SIDEWALK7' SI D E W A L K5.0'3' WIDE CONCRETEVALLEY GUTTERGRAVEL TRAILCONNECTION30' SEWEREASEMENTFILM 4, PAGE 107830' UTILITY EASEMENTPER PLAT J-300AND TRAIL EASEMENTDOC #2074572PROPOSED FENCECOVERED TRASHENCLOSURE ON 6"REINFORCEDCONCRETE SLABINSTALL HANDICAPPARKING SIGN ONSTUB WALLSEE SHEET C-5 FOR DETAILINSTALL HANDICAPPARKING SIGN ONNEW FOUNDATION (2)SEE SHEET C-5 FOR DETAILFIRE LANE FIRE LA N ECONSTRUCTION MANAGEMENT NOTES:1. SEE CONSTRUCTION MANAGEMENT SHEETS FOR DETAILED DESCRIPTION OFCONSTRUCTION MANAGEMENT ACTIVITIES.INSTALL TYPE"D" NO PARKINGFIRE LANESIGNSINSTALL TYPE"D" NO PARKINGFIRE LANESIGNSINSTALL TYPE"D" NO PARKINGFIRE LANESIGNS15'18.6'87.5'46'15.9'ROOF LINE ENCROACHESAPPROX. 1' (TYP. BUILDINGS1A, 1B, AND 2)AIR CONDITIONERS/SCREENINGENCROACH INTO SETBACKAPPROX. 6" (TYP. BOTH LOCATIONSTHIS BUILDING)