Garrett,
If you have been working with Em mtit on this along with Dustin then your good.I have to subm t our NW E standard com m ats for utility installations and
som ttim a there are situations that need to be reviewed and approved by the Construction M anager.If this is the case,I was unaware of the progress m zde
and you should continue to work with Em mt.Sorry I didn't get back to you sooner on this.
Tom
From:Garrett Schultz<gschultz@headwatersm tnet>
Sent:Thursday,M ach 31,2022 2:16 PM
To:M oser,Emm tt<Em mit.M user@contractor.northwestern.com>;Stewart,Thom as<Thom as.Stewart@northwestern.com>
Cc:Jerem yMay<jm ay@headwatersm tnet>
Subject:[EXTERNAL]Cherry Creek Site Plan Review Com m ets
CA U T[0 N:This Email is from an EX TER N A(source outside of N orthWe stern Energy.
The O riginal Sender of this email is gschultz@headwatersm tnet.
Are you expecting the message?Is this different from the message sender displayed above?
D o not click on links or open attachments unless you are sure you recognize the sender and you know the contents are safe.
If you believe the email to be malicious and/or phishing email, please use the Report Phish button.
Hi Tom,
I received your com m ets regarding the Cherry Creek M ked Use Site Plan Subm ttal,SP#22016. The com m ets are m cstly related to the locations of the m eers and
transform as.I spent a considerable am aunt of tim ecoordinating with Em mft M oser and his supervisor for those locations on this project...we actually ended up using the
CAD linework that Em mtit sent m efor the project design.Can we loop in Em mtt and discuss the project?
Thanks,
On W ed,Jan 12,2022 at 5:10 PM M eser,Em mtit<Em mft.M user@contractor.northwestern.com>wrote:
Hi Garrett,
Attached you will find the CAD file and Pdf of m eter locations that work with clearances.If there will not be enough open space after the fences are m cved
please let m eknow how m u:h room I need to m dce for it to pass for the city and I will try to m dce it work with som em hor adjustm arts.
Please call,text,or em al with any questions.
Thanks,
Emmtt Moser
Contractor for NorthWestern Energy
Engineer
Em m It.moser@contractor.northwestern.com
C 406-224-3995
121 East G iffin Drive I Bozem an,M T59715
https://m al.google.com kn 11/u/3/?ik=6cebb722bd&view=pt&search=all&perm 1hid=thread-a%3Ar-8888172433573732294%7Cm sg-f%3A17292205376... 1/9
4/25/22,8:57 AM H eadwaters Engineering Inc M al-RE:[EXTERNAL]Cherry Creek Site Plan Review Com m eits
From:Garrett Schultz<gschultz@headwatersm tnet>
Sent:Tuesday,January 11,2022 8:55 AM
To:M cser,Em mtt<Em mft.M oser@contractor.northwestern.com>
Subject:Re:[EXTERNAL]Re:Clearances and Screening
CA U ZO N:This Email is from an EX TER N A(source outside of N orthWe stern Energy.
The O riginal Sender of this email is gschultz@headwatersmtnet.
Are you expecting the message? Is this different from the message sender displayed above?
Do not click on links or open attachments unless you are sure you recognize the sender and you know the contents are
safe.
If you believe the email to be malicious and/or phishing email, please use the Report Phish button.
OK,thanks.Give m ea call when you're able.
On Tue,Jan 11,2022 at 8:42 AM M oser,Em mtt<Em mft.M cser@contractor.northwestern.com>wrote:
Each 4 plex:Electric= (4)200A,3-Phase 7 Jaw m tters connected to a m an disconnect switch and a cable pulling section.See Pg.47 in elec.Service
requirements and guidelines for diagram s
Gas=(4)AC250 M eters connected by a m tter m aiifold downstream of a single regulator
Each 2-plex=Sam eas 4plex sizing just two electric and gas m rters instead of 4.
If you have any questions on this please let m eknow.
Thanks,
Em mitt M oser
Contractor for Northwestern Energy
Engineer
Em rritt.m oser@contractor.northwestern.com
C 406-224-3995
121 East G iffin Drive I Bozem an,M T59715
From:Garrett Schultz<gschultz@headwatersm tnet>
Sent:Tuesday,January 11,2022 8:25 AM
To:M cser,Em mtit<Em mft.M cser@contractor.northwestern.com>
Subject:Re:[EXTERNAL]Re:Clearances and Screening
CA U ZO N:This Email is from an EX TER N A Isource outside of N orthWe stern Energy.
The O riginal Sender of this email is gschultz@headwatersmtnet.
Are you expecting the message?Is this different from the message sender displayed above?
Donot click on links or open attachments unless you are sure you recognize the sender and you know the contents are
safe.
If you believe the email to be malicious and/or phishing email, please use the Report Phish button.
Cool.Are you able to shoot m ethe sizing real quick?W eare working to m oie A/C's around the m eers and that will help m ehave a better idea,even without final m eer
locations.
On Tue,Jan 11,2022 at 8:23 AM M oser,Em mit<Em mft.M oser@contractor.northwestern.com>wrote:
https://m al.google.com kn 11/u/3/?ik=6cebb722bd&view=pt&search=all&perm hid=thread-a%3Ar-8888172433573732294%7Cm sg-f%3A17292205376... 2/9
4/25/22,8:57 AM H eadwaters Engineering Inc M al-RE:[EXTERNAL]Cherry Creek Site Plan Review Com m eits
Good m cming Garrett,
I just got back from som ePTO from fam ly in town and have 4 m eetings today,But I will be able to get you the m tter locations by tom crrow afternoon.
If I end up having extra tim etoday I will try to get it com iiete and back to you,but tom crrow is m u:h m cre likely.I already have the sizing of m c6t your
m tters com Bete,I just have to get the placem Ent finished.
Thanks,
Emm itt Moser
Contractor for North Western Energy
Engineer
Emm tt.m cser@contractor.northwestern.com
C 406-224-3995
121 East G iffin Drive I Bozem an,M T59715
From:Garrett Schultz<gschultz@headwatersm tnet>
Sent:Tuesday,January 11,2022 8:14 AM
To:Moser,Em mtk<Em mft.M cser@contractor.northwestern.com>
Subject:Re:[EXTERNAL]Re:Clearances and Screening
CA U ZO N:This Email is from an EX TER N A[source outside of N orthWestern Energy.
The O riginal Sender of this email is gschultz@headwatersm tnet.
Are you expecting the message?Is this different from the message sender displayed above?
Donot click on links or open attachments unless you are sure you recognize the sender and you know the contents
are safe.
If you believe the email to be malicious and/or phishing email, please use the Report Phish button.
Good m cming,Em mt.W eare getti rg wrapped up with everything on the Cherry Creek subm ttal and just wanted to touch base on gas and electrical m aer sizing.
Do you think you'll be close on that today?
Thanks,
On Thu,Jan 6,2022 at 9:23 AM M oser,Em mit<Em mit.M user@contractor.northwestern.com>wrote:
Hi Garrett,
I received your em al with the attached files,I will take a look at them and design the elec.and gas m tters and the locations based on these files.We
can then work together on getti rg them screened behind fencing while providing enough open space for your design and attem piing to get them as
close to the corners as we can for us.
If the open space requirem efts are for a certain sq.footage for the entire property,the fence placem eit I'm least concerned with is north of
Building 4.The other two fences Between the buildings would be the ones that would be m ort beneficial for us to be m ae toward the corners.
Thanks,
Em m tt Moser
Contractor for North Western Energy
Engineer
Em mft.m user@contractor.northwestern.com
C 406-224-3995
121 East G Win Drive I Bozem an,M T 59715
https://m al.google.corn kn 11/u/3/?ik=6cebb722bd&view=pt&search=all&perm hid=thread-a%3Ar-8888172433573732294%7Cm sg-f%3A17292205376... 3/9
4/25/22,8:57 AM H eadwaters Engineering Inc M al-RE:[EXTERNAL]Cherry Creek Site Plan Review Com m eits
From:Garrett Schultz<gschultz@headwatersm tnet>
Sent:Thursday,January 6,2022 8:54 AM
To:M oser,Em mtit<Em mit.M cser@contractor.northwestern.com>
Subject:Re:[EXTERNAL]Re:Clearances and Screening
CA U TO N:This Ema it is from an EX TER N A Isource outside of N orthWe stern Energy.
The O dginal Sender of this email is gschultz@headwatersmtnet.
Are you expecting the message?Is this different from the message sender displayed above?
Do not click on links or open attachments unless you are sure you recognize the sender and you know the contents
are safe.
If you believe the email to be malicious and/or phishing email, please use the Report Phish button.
Thanks,that all sounds reasonable.W edon't have a ton of flexibility with the fence locations due to open space and screening requirem arts but I'll see how m u:h
room we have to adjust.
I've included a site plan with this em al that shows window and door locations,and proposed m rter locations.A couple of them will undoubtedly need to be
m aed to be clear from the air conditioners and windows.I've included the architectural elevations also.
On Thu,Jan 6,2022 at 8:42 AM M oser,Em m#t<Em mit.M user@contractor.northwestern.com>wrote:
Hi Garrett,
W ecan push TX3 m are to the NE to get 10'separation of the Sewer Service and keep 10'Separation from the Sewer m an to the North.
For the easem Ent,we only need easem efts for the m ins,prim ay and Transform E-s not the service runs.So from the J-can to TX1 to TX2
(including TX2)then the 2"Gas m an continues north and is capped just South of Building 1A&1B.
The Island being narrowed to 11.4'will work if protection for the equipm Ent is installed.Attached is the specs for Bollards to protect the
equipm Ent,the East and W est sides will need protected but not the front or back of the Transform E•.Use 2-F in the attached standards for design
of Bollards,will need 3-4 on each side of TX2.
For the M eter Locations:
• Before determ hing locations for the M tters I will need profile views of the walls the m tters will be attached to.This is to m antain
clearances from windows,air intakes,vents,etc.
• For our m tters to be behind fencing we will need operable unlocked gates on the fence so that we have access 24/7 to the m tters for
m Eter reading,and m ore im portantly for possible safety issues that m a/arise.
• Is it possible for the fencing to be m aed closer to the corners of the Buildings?Between Bldgs.1A&16 and 3&5 we will have to hand dig
the services in and would have to hand dig for any future repairs.As close to the corners of the buildings as possible would be our
preferred location of the fencing so that we can set our m tters as close to the corners as possible while m antaining clearances and
allowing for it to be screened by fencing.For Bldg.4 the fencing being m wed east toward the corner of the Bldg will allow for us to keep
the Elec.Svc line within our acceptable lengths.
• Attached you will find our New Service Guide that has our gas and elec.M etering standards along with diagram sfor m tter installation and
clearances.
Thanks,
Em m It Moser
Contractor for North Western Energy
Engineer
Em mit.m user@ contractor.northwestern.com
C 406-224-3995
121 East G Win Drive I Bozem an,M T59715
From:Garrett Schultz<gschultz@headwatersm tnet>
Sent:M onday,January 3,2022 3:42 PM
https://m al.google.com kn 11/u/3/?ik=6cebb722bd&view=pt&search=all&perm hid=thread-a%3Ar-8888172433573732294%7Cm sg-f%3A17292205376... 4/9
4/25/22,8:57 AM H eadwaters Engineering Inc M al-RE:[EXTERNAL]Cherry Creek Site Plan Review Com m eits
To:M oser,Em mtit<Em mtt.M oser@contractor.northwestern.com>
Subject:Re:[EXTERNAL]Re:Clearances and Screening
CA U'[O N:This Email is from an EX IER N A[source outside of N orthWe stern Energy.
The O riginal Sender of this email is gschultz@headwatersm tnet.
Are you expecting the message?Is this different from the message sender displayed above?
Donot click on links or open attachments unless you are sure you recognize the sender and you know the
contents are safe.
If you believe the email to be malicious and/or phishing email, please use the Report Phish button.
Thanks Em mtit.Looks pretty good.Wed like to adjust the m tter locations slightly so they are behind fencing rather than out in the open.We'd also like to push
TX3 even m cre northeast,another couple feet,to m antain 10'separation from the sewer service near that location.TX3 would be just inside the existing PUE to
the north.And finally,we'd like to narrow the island north of buildings 3 and 5 to 11.4'from face of curb to face of curb.That still gives over 2'of clearance on
both sides of the transform a pad.W ecould install bollards if necessary to further protect from vehicles.
Also,we should not need easem arts for the services portion of the power and gas runs,just the m ins.
The attached pdf sum m aizes the changes(but does not include revised linework).The attached.dwg shows the revised linework.
On W ed,Dec 29,2021 at 12:41 PM M cser,Em mtit<Em mft.M user@contractor.northwestern.com>wrote:
Hi Garrett,attached is the updated CAD file for the Cherry Creek Sub.The changes m cde to the previous CAD design are:
1. M aed gas SVC for Bldg.2 to the North.
2. M aed TX3 to the NE,and after speaking with m ysupervisor and getti rg approval I was able to rem are the second 3-Ph J-can servicing
TX3.This will provide m cre clearances,and reduce am cunt of labor and above ground equipm Ent.
3. Reduced the size of TX1 to 150KVA and m aed it to the North to get out of the fire protection zone for Bldg.6
a. Changed the appearance of TX1 in CAD file to show how the transform Er will sit on the pad,this was done to help
m ensure the clearances for Bldg.6
Thanks,
Em m tt M user
Contractor for North Western Energy
Engineer
Em mit.m user@contractor.northwestern.com
C 406-224-3995
121 East G iffin Drive I Bozem an,M T59715
From:Garrett Schultz<gschultz@headwatersm tnet>
Sent:Tuesday,Decem ter 28,20218:55 AM
To:M oser,Em mtit<Em mit.M user@contractor.northwestern.com>
Subject:[EXTERNAL]Re:Clearances and Screening
CA U ZO N:This Email is from an EX TER N A[source outside of N orthWestern Energy.
The O riginal Sender of this email is gschultz@headwatersmt.net.
Are you expecting the message? Is this different from the message sender displayed above?
Do not click on links or open attachments unless you are sure you recognize the sender and you know the
https://m al.google.com kn 11/u/3/?ik=6cebb722bd&view=pt&search=all&perm hid=thread-a%3Ar-8888172433573732294%7Cm sg-f%3A17292205376... 5/9
4/25/22,8:57 AM H eadwaters Engineering Inc M al-RE:[EXTERNAL]Cherry Creek Site Plan Review Com m arts
contents are safe.
If you believe the email to be malicious and/or phishing email, please use the Report Phish button.
Thanks Em mtt.W eare looking deeper into the COB screening requirem efts for transform e-s.We've had to screen som e(not all)transform E-s in the past.
After reviewing your proposed layout a bit m cre,I have a few questions:
1.Is there capacity to use the existing J-can at the SE corner of the property,rather than installing new?
2.Can we m ae TX-1 out closer to the street,in order to avoid a fire protection zone and reduced clearances at the building?
3.Can we get rid of TX-3 and service building 2 from TX-1?It would m*e sense in this application to install an 8-12"conduit beneath the subdivision
access approach for future m antenance.If this option is not agreeable,can we m oie the transform a to the NE corner of the site to get further away
from the entrance?
4.Looking at detail sheet 30-D-4,I see that brick,cinder block,concrete and stone are considered non-com bistible.I am going to get our architect
involved here,too,but I'm wondering if m etal-sided buildings can be considered non-com bustible as well?
Thanks,
On M on,Dec 27,2021 at 11:34 AM M oser,Em mtt<Em m#t.M cser@ mntractor.northwestern.com>wrote:
H i G arett,
I talked to the engineer who does m ost of our City design and he said that norm ally Transform Ers and J-Cans don't need to be screened,that it is
prim oily the m der panels are required to be screened by the city.This is something that you would need to discuss with the city to see if they will
require it on this project.
However if the city or custom Er is calling for the Transform ers to be screened,the only way to screen the front that requires a 10,clearance is
with a fence that has a gate for access(specs and drawings for this are in attached 30-D-2 file).The sides and back will only need a 2'clearance
for any shrubs,trees,or fence.The only extra requirem art we have for trees is that deep rooted trees are not placed in our dig path,and the
closest branch of the tree to the transform er will need to be kept trim m d 1' away from transform er.Though our clearance from the transform er
pad for a tree is 2',if it is a larger deep rooted tree we would prefer closer to a 4'distance to prevent future dam age and outages.
Attached you will find pdf 30-D-2 that describes and illustrates the clearances we will need around the Transform er pad for fences,landscaping,
etc.
Also attached is Pdf 30-D-4 that describes and illustrates the clearances we will need for the"fire protection zone'and also includes specs and
inform aion on acceptable fire barriers.
If there is anything else you need from m e please let m e know.
Thanks,
Em m tt M user
Contractor for Northwestern Energy
Engineer
Em mft.m user@contractor.northwestern.com
C 406-224-3995
121 East G iffin Drive I Bozem an,M T59715
##IM PORTANT NOTE:This em al was sent by a contractor of NorthW extern Energy.Any views or opinions represented herein are expressly those of the
author and don't necessarily represent the views of NorthW stern Energy.##
This m ssage is for the nam(d person's use only.It m a/contain confidential,proprietary or legally privileged inform lion.No confidentiality or privilege is
waived or lost by any m'stransm ssion.If you receive this m ssage in error,please im m diately delete it and all copies of it from your system,destroy any
hard copies of it and notify the sender.You m cst not,directly or indirectly,use,disclose,distribute,print,or copy any part of this m ssage if you are not
the intended recipient.NorthW stern Corporation and its subsidiaries each reserve the right to m mitor all a-m al com m nications through its network.
https://m al.google.com kn 11/u/3/?ik=6cebb722bd&view=pt&search=all&perm hid=thread-a%3Ar-8888172433573732294%7Cm sg-f%3A17292205376... 6/9
4/25/22,8:57 AM H eadwaters Engineering Inc M al-RE:[EXTERNAL]Cherry Creek Site Plan Review Comm efts
Garrett Schultz,P.E.
Headwaters Engineering, Inc.
190 Northstar Lane
Bozem an,M T59718
gschultz@ headwatersm tnet
406-570-3676
This com m unication is the property of Headwaters Engineering,Inc.and m ay contain confidential or privileged inform ation.
If you have received this com m unication in error,please notify the sender and delete the com m unication.
##IM PORTANT NOTE:This em al was sent by a contractor of NorthW stern Energy.Any views or opinions represented herein are expressly those of the
author and don't necessarily represent the views of NorthW stern Energy.##
Garrett Schultz, P.E.
Headwaters Engineering, Inc.
190 Northstar Lane
Bozem an,M T59718
gschultz@headwatersm tnet
406-570-3676
This com m inication is the property of Headwaters Engineering,Inc.and m ay contain confidential or privileged inform ation.
If you have received this com m unication in error,please notify the sender and delete the com m unication.
##IM PORTANT NOTE:This ern al was sent by a contractor of NorthW stern Energy.Any views or opinions represented herein are expressly those of the author
and don't necessarily represent the views of NorthW stern Energy.##
Garrett Schultz, P.E.
Headwaters Engineering, Inc.
190 Northstar Lane
Bozeman,M T 59718
gschultz@headwatersm tnet
406-570-3676
This com m unication is the property of Headwaters Engineering,Inc.and m ay contain confidential or privileged inform ation.
If you have received this com m tnication in error,please notify the sender and delete the com m unication.
##IM PORTANT NOTE:This ern all was sent by a contractor of NorthW stern Energy.Any views or opinions represented herein are expressly those of the author and
don't necessarily represent the views of NorthW stern Energy.##
Garrett Schultz, P.E.
Headwaters Engineering, Inc.
190 Northstar Lane
https://m al.google.com kn 1l/u/3/?ik=6cebb722bd&view=pt&search=all&perm hid=thread-a%3Ar-8888172433573732294%7Cm sg-f%W 7292205376... 7/9
4/25/22,8:57 AM H eadwaters Engineering Inc M al-RE:[EXTERNAL]Cherry Creek Site Plan Review Corn rn efts
Bozem an,M T59718
gschultz@headwatersm tnet
406-570-3676
This com m mication is the property of Headwaters Engineering,Inc.and m a/contain confidential or privileged inform Aion.
If you have received this com rn mication in error,please notify the sender and delete the com m mication.
##IM PORTANT NOTE:This ern al was sent by a contractor of NorthW stern Energy.Any views or opinions represented herein are expressly those of the author and
don't necessarily represent the views of NorthW stern Energy.##
Garrett Schultz, P.E.
Headwaters Engineering, Inc.
190 Northstar Lane
Bozem ai,M T59718
gschultz@headwaters,tnet
406-570-3676
This com m mication is the property of Headwaters Engineering,Inc.and m ay contain confidential or privileged inform Aion.
If you have received this com m mication in error,please notify the sender and delete the com rn mication.
##IM PORTANT NOTE:This ern al was sent by a contractor of NorthW stern Energy.Any views or opinions represented herein are expressly those of the author and don't
necessarily represent the views of NorthW stern Energy.##
Garrett Schultz,P.E.
Headwaters Engineering, Inc.
190 Northstar Lane
Bozem an,M T59718
gschultz@headwatersm tnet
406-570-3676
This com m mication is the property of Headwaters Engineering,Inc.and may contain confidential or privileged information.
If you have received this corn,unication in error,please notify the sender and delete the com rn mication.
##IM PORTANT NOTE:This em al was sent by a contractor of NorthW stern Energy.Any views or opinions represented herein are expressly those of the author and don't
necessarily represent the views of NorthW stern Energy.##
Garrett Schultz, P.E.
Headwaters Engineering,Inc.
190 Northstar Lane
Bozem an,M T59718
gschultz@headwatersm tnet
406-570-3676
https://m al.google.com kn 11/u/3/?ik=6cebb722bd&view=pt&search=all&perm hid=thread-a%3Ar-8888172433573732294%7Cm sg-f%3A17292205376... 8/9
4/25/22,8:57 AM H eadwaters Engineering Inc M al-RE:[EXTERNAL]Cherry Creek Site Plan Review Corn m etts
This com m unication is the property of Headwaters Engineering,Inc.and m ay contain confidential or privileged inform Sion.
If you have received this corn m unication in error,please notify the sender and delete the corn m unication.
https://m al.google.com kn 11/u/3/?ik=6cebb722bd&view=pt&search=all&perm hid=thread-a%3Ar-8888172433573732294%7Cm sg-f%W 7292205376... 9/9