Loading...
HomeMy WebLinkAbout034 O & M manualCherry Creek Mixed Use  350 Gallatin Park Drive      Storm Water Facilities Operation & Maintenance Manual    Overview   The Cherry Creek Owners Association is responsible for maintaining the existing regional storm pond. The onsite  Owners Association is responsible for maintenance of all of the onsite Storm Water Facilities, sidewalk chases, curb  cuts, storm structures, storm swales, and storm separator per the schedule below.     Maintenance  The storm sidewalk chases, curb cuts and curb lines are to have the sediment removed by hand on a yearly basis or an  updated maintenance schedule as determined by monitoring the sediment build‐up of the inlets, quarterly. Any  removed sediment shall be removed from the site and disposed of properly as to not discharge into state waters.    The Hydrodynamic Separator is to be visually inspected every 6 months to check for build‐up of sediment in the bottom  of the unit. If the sediment depth exceeds 75% of the sump depth or 18 inches deep, the sediment is to be removed  using a vac‐truck to suck out the sediment and dispose of it at a disposal site. The sediment depth can also be measured  from the top of the unit. If the sediment is measured to be 5.7’ or less below the top of the separator unit, then the  sediment needs to be removed.      Floatables (trash) are to be netted out and disposed of prior to removing sediment with the vac‐truck. Any oils or  hydrocarbons are to be removed using absorbent pads prior to vac‐trucking out the sediment. Reference the Contech  CDS Inspection and Maintenance Guide for additional details.    The storm water pond and grass swales shall be monitored every five years for sediment build‐up. When the sediment  build‐up starts to decrease the capacity of the pond, the sediment shall be removed mechanically and hauled from the  site. If the extraction of the sediment removes the vegetation from the bottom of the pond, it should be reseeded or  re‐sodded and appropriate storm water BMPs are to be installed until the vegetation is stabilized.     The owners of the first constructed building will be responsible for maintenance of all of the above items until an  Owners Association is in place or until a second building is constructed. If two buildings are occupied, an Owners  Association must be created which will take over all maintenance.    Budget  It is estimated that the yearly budget estimated to complete the above items is approximately $1,000 in 2021 value.  This amount includes some contingency to build up a fund to allow larger scale maintenance.