Loading...
HomeMy WebLinkAbout022 Soils Investigation Report - Lot 12 1091 Stoneridge Drive • Bozeman, Montana • Phone (406) 587-1115 • Fax (406) 587-9768 www.chengineers.com • E-Mail: info@chengineers.com September 10, 2021 Mountain High Homes Attn: Dan Barnes E-mail: dan@mountainhighhomes.net RE: Soils Investigation Report – Lot 12, Block 2, Gallatin Park Subdivision; Bozeman, Montana (210645) Dear Dan, C&H Engineering and Surveying Inc., (C&H Engineering) has conducted a subsurface soils investigation for the above referenced property. The scope of services was to conduct a subsurface soils investigation and provide a soils investigation report. The report documents the site conditions, soil properties, and provides foundation design and general earthwork recommendations. Proposed Construction It is understood that a commercial structure(s) is planned for construction. At the time of this report detailed plans regarding the proposed structure(s) were not available. It has been assumed that the foundation footings will not be subjected to unusual loading conditions such as eccentric loads. If any of the foundation footings will be eccentrically loaded, please contact this office so we can appropriately revise our allowable bearing capacity and settlement estimates. Subsurface Soil and Conditions On May 13, 2021 a member of the staff of C&H Engineering visited the site to conduct a subsurface soils investigation. The subsurface soils investigation consisted of examining four exploratory test pit excavations. The exploratory test pits were excavated with a tracked excavator provided by AX&T Dirtworks. The soil profiles revealed by the exploratory excavations were logged and visually classified according to ASTM D 2488, which utilizes the nomenclature of the Unified Soil Classification System (USCS). The following paragraphs briefly summarize the subsurface soils and conditions observed in the exploratory test pits excavated for the field investigation. The soil horizons are described as they were encountered in the test pit excavations, starting with the horizon nearest the surface and proceeding with each additional horizon encountered with depth. SOILS INVESTIGATION REPORT #210645 – LOT 12, BLOCK 2, GALLATIN PARK SUBDIVISION; BOZEMAN, MONTANA 2 The first soil horizon encountered in each exploratory excavation (except TP-4) was an Organic Soil of Low Plasticity (OL); please note that 1.5 feet of organic undocumented fill was encountered above the native organic layer in TP-4 only. This material was black in color, moist, and very soft. This material was encountered to depths varying from 0.75 to 3.3 feet below grounds surface (bgs). Organic soils are highly compressible and are not suitable for foundation support. This material must be removed from beneath all foundation elements and in any area that will receive flexible or rigid pavements. Underlying the Organic Soil in each exploratory excavation was a Lean Clay with Sand (CL). This material was present to depths varying from 4.3 feet bgs to 6.7 feet bgs. This material was very moist and soft, suggesting groundwater is rising up within this material seasonally. This material is moisture sensitive, highly compressible and must be removed from beneath all foundation footings. Underlying the Lean Clay in each exploratory excavation was a Poorly Graded Gravel with Sand and Cobbles (GP), known locally as “pit-run” gravel. This material was dark brown in color, very moist to saturated, medium dense and estimated to contain approximately 40 percent coarse to fine grained sand, and approximately 60 percent rounded and subrounded gravels and cobbles. This material was present to the end of each excavation, depths varying from 5.6 to 7.6 feet bgs. Groundwater was encountered within this material in each exploratory excavation. Based on the subsurface investigation, it is recommended that the excavation for the foundation elements continue down to the Poorly Graded Gravel with Sand and Cobbles and structural fill be used to achieve the desired bottom of footing elevation. Groundwater Groundwater was encountered at the same elevation as the Poorly Graded Gravel with Sand and Cobbles in each exploratory excavation. Also, the Lean Clay with Sand soil encountered beneath the organic soil was very soft and moist starting at a depth of approximately 2.5 to 3.0 feet bgs, suggesting that groundwater is rising up to this level seasonally. Also, once the Lean Clay layer is removed from above the Poorly Graded Gravel with Sand and Cobbles, the groundwater table will likely be elevated in this area and may rise up higher than if the low permeability Lean Clay was left in place. Because of this, a slab-on-grade with stem wall foundation is recommended for any structure to be constructed on the subject property. Please note that our subsurface investigation is not a detailed groundwater study, and groundwater conditions may change dramatically due to conditions that are out of our control. Our assessment of the groundwater conditions is based on the conditions observed within the exploratory test pits on the day of the excavation, our general experience in the project area, and any available literature regarding groundwater conditions in the vicinity of the subject property. If more detailed knowledge of the seasonally high groundwater elevation across the subject property is desired, it is recommended that groundwater monitoring wells be installed and checked weekly from the early spring to late summer months. SOILS INVESTIGATION REPORT #210645 – LOT 12, BLOCK 2, GALLATIN PARK SUBDIVISION; BOZEMAN, MONTANA 3 Foundation Recommendations Based on the subsurface soils encountered in the exploratory excavations, it is recommended that a slab-on-grade with stem wall foundation be utilized. Basement and crawl space foundations are not recommended due to seasonally high groundwater. Please find the following as general recommendations for all foundation elements:  In order to keep the footing out of the active frost zone it is recommended that the bottom of all footing elevations be a minimum of 48 inches below finished grade.  All foundation elements are to bear on compacted structural fill overlying the Poorly Graded Gravel with Sand and Cobbles. All foundation footings shall be dimensioned for an allowable bearing capacity of 2,500 pounds per square foot (psf).  It is recommended that typical strip footings for this structure have a minimum width of 16 inches and column footings should have a minimum width of 24 inches, provided the soils allowable bearing capacity is not exceeded.  If construction takes place during the colder months of the year, the subgrade must be protected from freezing. This may require the use of insulating blankets and/or ground heaters. Allowable Bearing Capacity & Settlement The bearing capacity of a soil is defined as the ultimate pressure per unit area by the foundation that can be supported by the soil in excess of the pressure caused by the surrounding soil at the footing level. Bearing capacity is determined by the physical and chemical properties of the soil located beneath the proposed structures footings. It is recommended that the loads from the proposed structure be transmitted to properly placed and compacted structural fill overlying the Poorly Graded Gravel with Sand and Cobbles. For this scenario it is recommended that an allowable bearing capacity of 2,500 pounds per square foot be used to dimension all foundation footings. Settlement and differential settlement were estimated using conservative soil parameters and the assumption that the foundation footings bear on properly placed and compacted structural fill overlying the Poorly Graded Gravel with Sand and Cobbles. Based on conservative soil parameter estimates, the bearing capacity recommended, and the assumption that all recommendations made in this report will be properly implemented, it is expected that total and differential settlement will be ½-inch or less. Structures of the type proposed can generally tolerate movements of this magnitude, however, this movement should be checked by a structural engineer to determine if it is acceptable. SOILS INVESTIGATION REPORT #210645 – LOT 12, BLOCK 2, GALLATIN PARK SUBDIVISION; BOZEMAN, MONTANA 4 Subgrade Preparation and Structural Fill In general, the excavation for the foundation footings must be level and uniform and continue down to the Poorly Graded Gravel with Sand and Cobbles. If any soft spots, undocumented fill or boulders are encountered, they will need to be removed and backfilled with structural fill. The excavation width must extend a minimum of one footing width from the outer edges of the footings or to a distance equal to ½ the height of the required structural fill, whichever is greater. For example, if 6 feet of structural fill is required, the excavation must extend out from the footing a minimum distance of 3 feet. The purpose of this requirement is to keep the loads from the structure fully contained within the structural fill. Once the excavation is complete, the native subgrade shall be proof rolled with a large compactor to an unyielding condition. Any areas that are found to be pumping or rutting shall be sub-excavated and replaced with structural fill. Structural fill is defined as all fill that will ultimately be subjected to structural loadings, such as those imposed by footings, floor slabs, pavements, etc. Structural fill will need to be imported for this project. Imported structural fill is recommended to be a well graded gravel with sand that contains less than 15 percent of material that will pass a No. 200 sieve and that has a maximum particle size of 3 inches. Also, the fraction of material passing the No. 40 sieve shall have a liquid limit not exceeding 25 and a plasticity index not exceeding 6. The gravel and sand particles also need to be made up of durable rock materials that will not degrade when compacted; no shale or mudstone fragments should be present. Structural fill must be placed in lifts no greater than 12 inches (uncompacted thickness) and be uniformly compacted to a minimum of 97 percent of its maximum dry density, as determined by ASTM D698. Typically, the structural fill must be moisture conditioned to within + 2 percent of the materials optimum moisture content to achieve the required density. It is recommended that the structural fill be compacted with a large vibrating smooth drum roller. Please note that if a moisture-density relationship test (commonly referred to as a proctor) needs to be performed for a proposed structural fill material to determine its maximum dry density and optimum moisture content in accordance with ASTM D698, a sample of the material must be delivered to this office a minimum of three full working days prior to beginning placement of the structural fill. It is also acceptable to utilize a lift or two of ¾-inch washed rock to get up above the groundwater elevation and then switch over to using 3-inch minus “pit-run” gravel as structural fill. If ¾-inch washed rock is used as structural fill it needs to be compacted to an unyielding condition with a large vibrating smooth drum roller. At no time should surface water runoff be allowed to flow into and accumulate within the excavation for the foundation elements. If necessary, a swale or berm should be temporarily constructed to reroute all surface water runoff away from the excavation. Excavation should not proceed during large precipitation events. If any of the foundation footings are found to be located on a test pit, the area will need to be excavated down to the full depth of the test pit and structural fill be placed and compacted in lifts SOILS INVESTIGATION REPORT #210645 – LOT 12, BLOCK 2, GALLATIN PARK SUBDIVISION; BOZEMAN, MONTANA 5 (as described in this report) to bring the area back up to the desired grade. Foundation Wall Backfill Approved backfill material should be placed and compacted between the foundation wall and the edge of the excavation. The soils encountered during the field investigation, with the exception of the Organic Soil and the undocumented fill, are suitable for use as foundation wall backfill along the exterior of the foundation, provided they are not too moist. Structural fill is recommended as foundation wall backfill in all areas that will support concrete slabs-on-grade or other paving improvements. The backfill shall be placed in uniform lifts and be compacted to a minimum of 95 percent of the material’s maximum dry density, as determined by ASTM D698. The foundation wall backfill will need to be compacted with either walk behind compaction equipment or hand operated compaction equipment in order to avoid damaging the foundation walls. If walk behind compaction equipment is used, lifts should not exceed 8-inches (loose thickness) and if hand operated compaction equipment is used lifts should not exceed 4-inches (loose thickness). Interior Slabs-on-Grade In preparation for the interior slabs-on-grade, the excavation must continue down to the Poorly Graded Gravel with Sand and Cobbles and structural fill be utilized to achieve the desired bottom of slab elevation. For all interior concrete slabs-on-grade, preventative measures must be taken to stop moisture from migrating upwards through the slab. Moisture that migrates upwards through the concrete slab can damage floor coverings such as carpet, hardwood and vinyl, in addition to causing musty odors and mildew growth. Moisture barriers will need to be installed to prevent water vapor migration and capillary rise through the concrete slab. In order to prevent capillary rise through the concrete slab-on-grade it is recommended that 6 inches of ¾-inch washed rock (containing less than 10 percent fines) be placed and compacted once the excavation for the slab is complete. The washed rock has large pore spaces between soil particles and will act as a capillary break, preventing groundwater from migrating upwards towards the bottom of the slab. In order to prevent the upward migration of water vapor through the slab, it is recommended that a 15-mil extruded polyolefin plastic that complies with ASTM E1745 (such as a Stego Wrap 15- mil Vapor Barrier) be installed. The vapor barrier should be pulled up at the sides and secured to the foundation wall or footing. Care must be taken during and after the installation of the vapor barrier to avoid puncturing the material, and all joints are to be sealed per the manufacture’s recommendations. Once the excavation for the interior slab-on-grade is completed as described in the first paragraph of this section, and the ¾ inch washed rock and moisture barriers have been properly installed, it will be acceptable to form and cast the steel reinforced concrete slab. It is SOILS INVESTIGATION REPORT #210645 – LOT 12, BLOCK 2, GALLATIN PARK SUBDIVISION; BOZEMAN, MONTANA 6 recommended that interior concrete slabs-on-grade have a minimum thickness of 4 inches, and the reinforcement shall be designed by a licensed structural engineer. Exterior Slabs-on-Grade For exterior areas to be paved with concrete slabs, it is recommended that, at a minimum, the organic soil be removed. The native subgrade then needs to be compacted to a minimum of 95 percent of its maximum dry density, as determined by ASTM D698. Then for non-vehicular traffic areas, a minimum of 6 inches of ¾-inch minus rock needs to be placed, and 4 inches of 4000 pounds per square inch (psi) concrete placed over the ¾-inch minus rock. For areas with vehicular traffic, a minimum of 9 inches of ¾-inch minus rock should be placed, followed by 6 inches of 4000 psi concrete. Exterior slabs that will be located adjacent to the foundation walls need to slope away from the structure at a minimum grade of 2 percent and should not be physically connected to the foundation walls. If they are connected, any movement of the exterior slab will be transmitted to the foundation wall, which may result in damage to the structure. Site Grading Surface water should not be allowed to accumulate and infiltrate the soil near the foundation. Proper site grading will ensure surface water runoff is directed away from the foundation. Please find the following as general site grading recommendations:  Finished grade must slope away from the building a minimum of 5 percent within the first 10 feet, in order to quickly drain ground surface and roof runoff away from the foundation walls. Please note that in order to maintain this slope; it is imperative that any backfill placed against the foundation walls be compacted properly. If the backfill is not compacted properly, it will settle and positive drainage away from the structure will not be maintained.  Permanent sprinkler heads for lawn care should be located a sufficient distance from the structure to prevent water from draining toward the foundation or saturating the soils adjacent to the foundation.  Rain gutter down spouts are to be placed in such a manner that surface water runoff drains away from the structure.  All roads, walkways, and architectural land features must properly drain away from all structures. Special attention should be made during the design of these features to not create any drainage obstructions that may direct water towards or trap water near the foundation. SOILS INVESTIGATION REPORT #210645 – LOT 12, BLOCK 2, GALLATIN PARK SUBDIVISION; BOZEMAN, MONTANA 7 Asphalt Paving Improvements For areas to be paved with asphalt, it is recommended that, as a minimum, the topsoil and any organics be removed. The native subgrade then needs to be compacted at ± 2 percent of its optimum moisture content to 95 percent of its maximum dry density. Following compaction of the native subgrade, a layer of geotextile (such as a Mirafi 160N) shall be installed. Next a 12- inch layer of compacted 6-inch minus gravel needs to be placed, followed by a 6-inch layer of compacted 1-inch minus road mix. Both gravel courses must be compacted at ± 2 percent of their optimum moisture content to 95 percent of their maximum dry density, as determined by ASTM D698. A 3-inch-thick layer of asphalt pavement can then be placed and compacted over this cross-section. Construction Administration The foundation is a vital element of a structure; it transfers all of the structures dead and live loads to the native soil. It is imperative that the recommendations made in this report are properly adhered to. A representative from C&H Engineering should observe the construction of any foundation or drainage elements recommended in this report. The recommendations made in this report are contingent upon our involvement. If the soils encountered during the excavation differ than those described in this report or any unusual conditions are encountered, our office should be contacted immediately to examine the conditions, re-evaluate our recommendations and provide a written response. If construction and site grading take place during cold weather, it is recommended that approved winter construction practices be observed. All snow and ice shall be removed from cut and fill areas prior to site grading taking place. No fill should be placed on soils that are frozen or contain frozen material. No frozen soils can be used as fill under any circumstances. Additionally, Concrete should not be placed on frozen soils and should meet the temperature requirements of ASTM C 94. Any concrete placed during cold weather conditions shall be protected from freezing until the necessary compressive strength has been attained. Once the footings are placed, frost shall not be permitted to extend below the foundation footings, as this could heave and crack the foundation footings and/or foundation walls. It is the responsibility of the contractor to provide a safe working environment with regards to excavations on the site. All excavations should be sloped or shored in the interest of safety and in accordance with local and federal regulations, including the excavation and trench safety standards provided by the Occupational Safety and Health Administration (OSHA). Report Limitations The recommendations made in this report are based on limited information obtained from the exploratory test pit excavated on the subject property. It is not uncommon for variations in the subsurface conditions to occur, the nature and extent of which do not become evident until additional exploration or construction is conducted. The variations may result in additional construction costs, and it is suggested that a contingency be provided for this purpose. OL CL GP 0.8 4.3 5.6 0 TO 0.75 FEET: ORGANIC SOIL; (OL); black; moist; low plasticity; very soft. 0.75 TO 4.3 FEET: LEAN CLAY WITH SAND; (CL); tan; moist to very moist; medium plasticity; soft to very soft. 4.3 TO 5.6 FEET: POORLY GRADED GRAVEL WITH SAND AND COBBLES; (GP); dark brown; moist to saturated; non plastic plasticity; dense. Bottom of test pit at 5.6 feet. NOTES GROUND ELEVATION LOGGED BY Michael J. Welch, P.E. EXCAVATION METHOD Tracked Excavator EXCAVATION CONTRACTOR AX&T Dirtworks GROUND WATER LEVELS: DATE STARTED 5/13/21 COMPLETED 5/13/21 AT TIME OF EXCAVATION 5.60 ft AFTER EXCAVATION --- AT END OF EXCAVATION ---DEPTH(ft)0.0 2.5 5.0 SAMPLE TYPENUMBERPAGE 1 OF 1 TEST PIT NUMBER TP1 PROJECT NUMBER 210645 CLIENT Mountain High Homes, Inc. PROJECT LOCATION Lot 12, Gallatin Park Subdivision PROJECT NAME Soils Investigation GENERAL BH / TP / WELL - GINT STD US.GDT - 9/9/21 13:56 - G:\C&H\21\210645S\TEST PIT LOGS (210645).GPJU.S.C.S.GRAPHICLOGMATERIAL DESCRIPTION OL CL GP 1.2 5.5 6.3 0 TO 1.2 FEET: ORGANIC SOIL; (OL); black; moist; low plasticity; very soft. 1.2 TO 5.5 FEET: LEAN CLAY WITH SAND; (CL); tan; moist to very moist; mediumplasticity; soft to very soft. 5.5 TO 6.3 FEET: POORLY GRADED GRAVEL WITH SAND AND COBBLES; (GP); dark brown; moist to saturated; non plastic plasticity; dense. Bottom of test pit at 6.3 feet. NOTES GROUND ELEVATION LOGGED BY Michael J. Welch, P.E. EXCAVATION METHOD Tracked Excavator EXCAVATION CONTRACTOR AX&T Dirtworks GROUND WATER LEVELS: DATE STARTED 5/13/21 COMPLETED 5/13/21 AT TIME OF EXCAVATION 6.30 ft AFTER EXCAVATION --- AT END OF EXCAVATION ---DEPTH(ft)0.0 2.5 5.0 SAMPLE TYPENUMBERPAGE 1 OF 1 TEST PIT NUMBER TP2 PROJECT NUMBER 210645 CLIENT Mountain High Homes, Inc. PROJECT LOCATION Lot 12, Gallatin Park Subdivision PROJECT NAME Soils Investigation GENERAL BH / TP / WELL - GINT STD US.GDT - 9/9/21 13:56 - G:\C&H\21\210645S\TEST PIT LOGS (210645).GPJU.S.C.S.GRAPHICLOGMATERIAL DESCRIPTION OL CL GP 1.3 5.5 6.3 0 TO 1.3 FEET: ORGANIC SOIL; (OL); black; moist; low plasticity; very soft. 1.3 TO 5.5 FEET: LEAN CLAY WITH SAND; (CL); tan; moist to very moist; medium plasticity; soft to very soft. 5.5 TO 6.3 FEET: POORLY GRADED GRAVEL WITH SAND AND COBBLES; (GP); dark brown; moist to saturated; non plastic plasticity; dense. Bottom of test pit at 6.3 feet. NOTES GROUND ELEVATION LOGGED BY Michael J. Welch, P.E. EXCAVATION METHOD Tracked Excavator EXCAVATION CONTRACTOR AX&T Dirtworks GROUND WATER LEVELS: DATE STARTED 5/13/21 COMPLETED 5/13/21 AT TIME OF EXCAVATION 6.30 ft AFTER EXCAVATION --- AT END OF EXCAVATION ---DEPTH(ft)0.0 2.5 5.0 SAMPLE TYPENUMBERPAGE 1 OF 1 TEST PIT NUMBER TP3 PROJECT NUMBER 210645 CLIENT Mountain High Homes, Inc. PROJECT LOCATION Lot 12, Gallatin Park Subdivision PROJECT NAME Soils Investigation GENERAL BH / TP / WELL - GINT STD US.GDT - 9/9/21 13:56 - G:\C&H\21\210645S\TEST PIT LOGS (210645).GPJU.S.C.S.GRAPHICLOGMATERIAL DESCRIPTION OL OL CL GP 1.5 3.3 6.7 7.6 0 TO 1.5 FEET: UNDOCUMENTED FILL; (OL); black; dry to moist; low plasticity; loose. 1.5 TO 3.3 FEET: ORGANIC SOIL; (OL); black; moist; low plasticity; very soft. 3.3 TO 6.7 FEET: LEAN CLAY WITH SAND; (CL); tan; moist to very moist; mediumplasticity; soft to very soft. 6.7 TO 7.6 FEET: POORLY GRADED GRAVEL WITH SAND AND COBBLES; (GP); dark brown; moist to saturated; non plastic plasticity; dense. Bottom of test pit at 7.6 feet. NOTES GROUND ELEVATION LOGGED BY Michael J. Welch, P.E. EXCAVATION METHOD Tracked Excavator EXCAVATION CONTRACTOR AX&T Dirtworks GROUND WATER LEVELS: DATE STARTED 5/13/21 COMPLETED 5/13/21 AT TIME OF EXCAVATION 7.60 ft AFTER EXCAVATION --- AT END OF EXCAVATION ---DEPTH(ft)0.0 2.5 5.0 7.5 SAMPLE TYPENUMBERPAGE 1 OF 1 TEST PIT NUMBER TP4 PROJECT NUMBER 210645 CLIENT Mountain High Homes, Inc. PROJECT LOCATION Lot 12, Gallatin Park Subdivision PROJECT NAME Soils Investigation GENERAL BH / TP / WELL - GINT STD US.GDT - 9/9/21 13:56 - G:\C&H\21\210645S\TEST PIT LOGS (210645).GPJU.S.C.S.GRAPHICLOGMATERIAL DESCRIPTION