Loading...
HomeMy WebLinkAbout008 Landscape Departure      190 NORTHSTAR LANE  BOZEMAN, MT  59718   406‐581‐5730  www.headwatersmt.net                                                                Page 1 of 2  January 13, 2022    Anna Bentley  Deputy Director of Planning  City of Bozeman – Planning Department    Re: Cherry Creek Mixed Use #21374   Pathway Design Departure Request     Dear Ms. Bentley,    This letter is to request a departure from the pathway design requirements in standard 38.520.040.D for the Gallatin  Park Mixed Use submittal. This departure has been requested and granted on several similar projects.    38.520.040.D – Pathway Design: Pathways must be separated from structures by at least three feet of landscaping  except where the adjacent building façade meets the Storefront block frontage standards per section 38.510.030.B.  Departures are permitted for other landscaping and/or façade treatments to provide attractive pathways will be  considered.  Examples include sculptural, mosaic, bas‐relief artwork, or other decorative treatments that meet the  intent.  The requested departure is to allow concrete in front of the rollup garage doors to allow vehicle access inside of  the commercial units.  The units are designed to allow parking inside or temporary access for loading, etc.  Requiring  landscaping between the pathway which is a minimum of 3’ away from the building and the garage door would  eliminate access to these doors.  The design provides adequate separation and screening on the street facing building,  but the internal pathways do not provide a 3’ pathway separation along the entirety of the building as a result of the  garage doors. The concrete connection between the pathway and the garage doors is necessary for access, same as at  each man door.    The intent of this section is to provide separation between the pathway and the building to provide attractive pathways  to improve the experience for the user.  The pathway is still separated from the building by the required three feet, the  area in front of the doors is now filled with concrete.  The concrete will be jointed as shown on sheet C‐2 to delineate  the 5’ pathway even in front of the garage doors.  The garage doors are not typical garage doors, but are upgraded full  glass garage doors. The upgraded doors will not detract from the visually appealing façade like standard garage doors  would, but actually add streetside appeal and transparency. The front of the buildings meets several requirements of  the storefront standards and end up being a mesh between the two standards.      Figure 1 – Example of the breakup of the 3’ landscape buffer.    190 Northstar Lane, Bozeman, MT 59718                  (406) 581‐5730                 www.headwatersmt.net                         Page 2 of 2  As can be seen in Figure 1, some areas of the building are setback from the pathway by 3.5’ instead of the minimum 3’.   These wider areas have additional vegetation planned to offset the areas in front of the garage doors.    We request that you consider our departure to allow this project to be able to provide this specific product which is  sought after by businesses in many industries.   We feel that the upgraded garage doors, the visually appealing façade,  the areas of wider separation, and the increased landscaping offset the areas which require concrete access instead of  landscaping.     We appreciate your time in reviewing our request and if you have any questions or comments, please contact me at  581‐5730.    Sincerely,           ______________________________                                           Jeremy May, P.E.                                                       Headwaters Engineering, Inc.                                                H:\1086\017\DOCS\SITEPLAN\SUBMITTAL\01‐02_departure landscape.doc