HomeMy WebLinkAbout004 Development Review App Signed Community Development
DEVE OPMIFNT RF!/IFW APPLICATION
Please remember to obtain owner signature on this form prior to uploading with the rest of your submittal. (Digital signature
acceptable.)
PROJECT INFORMATION
Project Name: Cherry Creek Mixed Use
Project Type(s): Site Plan SP
Street Address: 350 Gallatin Park Dr.Bozeman,MT 59715
GALLATIN PARK SUB,S36,T01 S, R05 E,BLOCK 2,Lot 12,ACRES 2.01,
PLATJ-300 PLUS OPEN SPACE
Legal Description:
Site Plan for mixed use project with 24 total commercial units and 24 dwellinq
units in five 4-plex buildings and two duplex buildings on 2.01 acres.
Description of_Project_
Current Zoning: M-1 Light Manufacturing District
Existing Use: Undeveloped
Proposed Use: Mixed
Gross Lot Area: 87556
Number of Buildings: [NumberofNewBuildings]
Type and Number of Dwellings: 24
Building Size(SF): 41424 _
Non-Residential Building Size(SF): 21312
Building Height(ft): 30
Affordable Housing(Y/N): No
Departure/Deviation Request(Y/N): Yes
PROPERTY OWNER
Company Name: Long Shot Equity,LLC
Name: Donnie Olsson
Full Address: PO Box 10025,Bozeman,MT 59719
Email: donnie@donnieolsson.com
Phone: (406)570-8859
APPLICANT
Company Name: Headwaters Engineering
Name: Garrett Schultz
Full Address: 190 Northstar Lane, Bozeman,Montana 59718
Email: gschultz@headwatersmt.net
Phone: (406)570-3676
REPRESENTATIVE
Company Name: Headwaters Engineering
Name: Garrett Schultz
Full Address: 190 Northstar Lane, Bozeman,Montana 59718
Email: gschultz@headwatersmt.net
Phone: (406)570-3676
CERTIFICATIONS AND SIGNATURES
Applicant signature is captured electronically at time of application submittal.This application(PDF)must also be
signed by the property owner(s)for all application types before the submittal will be accepted.The only exception
to this is an informal review application that may be signed by the applicant(s)only.The applicant(s)and property
owner(s)submit this application for review under the terms and provisions of the Bozeman Municipal Code.It is
further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be
in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by
the approval authority.I acknowledge that the City has an Impact Fee Program and impact fees may be assessed
for my project. Further,I agree to grant City personnel and other review agency representative's access to the
subject site during the course of the review process(Section 38.200.050,BMC). I(We)hereby certify that the
above information is true and correct to the best of my(our)knowledge.
Certification of Completion and Compliance-I understand that conditions of approval may be applied to the
application and that I will comply with any conditions of approval or make necessary corrections to the application
materials in order to comply with municipal code provisions.
Statement of Intent to Construct According to the Final Plan-I acknowledge that construction not in
compliance with the approved finalfinal ot�uresuft in delays of pccupancy or costs to correct noncompliance.
A
Property Owner Signature: L—
Printed Name: Donnie Olsson
CONTACT US
Alfred M.Stiff Professional Building phone 406-582-2260
20 East Olive Street fax 406-582-2263
Bozemn,MT 59715 planning@bozeman.net
www.bozeman.net/planning