Loading...
HomeMy WebLinkAbout016 Narrative Response to Conditions 109 E Main Street, Ste B, Bozeman, MT 59715 I OFFICE 406.728.4611 I EMAIL wgm@wgmgroup.com May 20, 2022 Susanna Montana, Senior Planner City of Bozeman, Planning Division 20 E. Olive Street Bozeman, MT 59718 Re: WGM Response to Recommended Conditions of Approval and Code Compliance Per Findings of Fact for Annie Subdivision, Phase 4 (#21201) Dear Ms. Montana: This letter is intended to provide a narrative response to how the above referenced project supports the Recommended Conditions of Approval. The project is for a major subdivision of 20 lots for future residential development in the R-3 zoning district on 3.241 acres at the address 2305 Durston Road in the City of Bozeman, Montana. Responses to how the recommended conditions, per Section 3, are supported by this project have been provided in bold. Recommended Conditions of Approval: 1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. We recognize and are aware of this requirement. 2. The final plat must conform to all requirements of the Bozeman Municipal Code and the Uniform Standards for Subdivision Plats (Uniform Standards for Certificates of Survey and Subdivision Plats (24.183.1104 ARM) and shall be accompanied by all required documents, including certification from the City Engineer that as-built drawings for public improvements were received, a platting certificate, and all required and corrected certificates. The Final Plat application shall include three (3) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent). The Gallatin County Clerk & Recorder’s office has elected to continue the existing medium requirements of 2 mylars with a 1½” binding margin on one side for both plats and COS’s. The Clerk and Recorder will file the new Conditions of Approval sheet as the last same sized mylar sheet in the plat set. The final plat conforms with the above listed requirements. Certification from the City Engineer is forthcoming. Project as-builts and certification documents have been submitted to the City Engineer for approval. Signed, reproducible copies are planned to be provided following approval of the draft documents. 3. The watercourse setback must be removed from the plat prior to final plat approval. The watercourse setback has been removed from the plat. 4. The existing sewer septic system(s) must properly be abandoned prior to final plat approval. Response to Recommended Conditions of Approval May 20, 2022 Page 2 of 6 The existing sewer system has been removed and properly abandoned. Documentation of the removal has been provided. 5. The applicant must complete the installation of the Rapid Rectangular Flashing Beacon (RRFB) at the intersection of N. 25th Ave. and Durston Rd. as called for in the Transportation Master Plan, prior to approval of Final Plat. The RRFB has been installed recently per the approved plans. As built drawings for the RRFB will be provided to City Engineering for approval, prior to approval of the Final Plat. 6. The applicant must provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special Improvement Districts (SID’s) or special districts. The provided draft SID waiver is acceptable. The applicant must provide a copy of the filed SID waiver prior to Final Plat approval. A copy of the filed and recorded Waiver of Right to Protest Creation of Special Improvement Districts has been provided with the final plat application. 7. Due to the known high groundwater conditions in the area no basements will be permitted with future development of the site. No crawl spaces will be permitted with future development of the site, unless a professional engineer registered in the State of Montana certifies that the lowest point of any proposed structure is located above the seasonal high groundwater level and provide supporting groundwater data prior to the release of building permit. In addition, sump pumps are not allowed to be connected to the sanitary sewer system or the drainage system unless capacity is designed into the drainage system to accept the pumped water. Water from sump pumps may not be discharged onto streets, such as into the curb and gutters where they may create a safety hazard for pedestrians and vehicles. This requirement is understood. Notes have been provided on the final plat drawings as required, to address this item. 8. The responsibility of maintenance for the stormwater facilities, stormwater open space lots, pedestrian open space lots and street frontage landscaping for the perimeter streets must be that of the property owners’ association. Maintenance responsibility must include, all vegetative ground cover, boulevard trees and irrigation systems in the public right-of-way boulevard strips along all external perimeter development streets. The property owners’ association must be responsible for levying annual assessments to provide for the maintenance, repair, and upkeep of all perimeter street frontage landscaping and stormwater facilities and all open space landscaping. The property owners association will be responsible for maintaining the facilities described above, as outlined in the covenants and homeowners association documents. 9. Remove General Notes 2 and 3 on the Conditions of Approval sheet. The utility easement language is already present in the legal description and a separate easement document will be required to clarify location and size of the easement. A separate public access easement must be provided to grant public access over the open space lot. Response to Recommended Conditions of Approval May 20, 2022 Page 3 of 6 Notes 2 and 3 on the Conditions of Approval sheet have been removed for the final plat. The utility easement has been granted on the plat. The stormwater easement over Lots 9 and 10 has also been granted on the plat. A new separate public access easement has not been provided over the open space since the underlying easement per Annie Subdivision Phase 3C (document number 2080915) has been maintained. 1. Sec. 38.220.070. – Final plat. a. The final plat must conform to all requirements of the Bozeman Municipal Code and the Uniform Standards for Monumentation, Certificates of Survey, and Final Subdivision Plats (24.183.1101 ARM, 24.183.1104 ARM, 24.183.1107 ARM) and must be accompanied by all required documents, including certification from the City Engineer that record drawings for public improvements were received, a platting certificate, and all required and corrected certificates. The final plat documents have been created to conform to BMC and ARM requirements. Required and corrected certificates have been provided on the plat. b. A letter from the city engineer certifying that the following documents have been received: i. As-built drawings, i.e., copies of final plans, profiles, grades and specifications for public improvements, including a complete grading and drainage plan. As built drawings and certification documents have been submitted to the City Engineering department for review and approval. The certification letter will be provided once it is received from the City. c. Noxious weed MOU. Prior to final plat approval, a memorandum of understanding must be entered into by the weed control district and the developer. The memorandum of understanding must be signed by the district and the developer prior to final plat approval, and a copy of the signed document must be submitted to the community development department with the application for final plat approval. A Noxious Weed MOU from the Gallatin County Weed District has been provided. d. Irrigation system as-builts. The developer must provide irrigation system as-builts, for all irrigation installed in public rights-of-way and/or land used to meet parkland dedication requirements, once the irrigation system is installed. The as-builts must include the exact locations and type of lines, including accurate depth, water source, heads, electric valves, quick couplers, drains and control box. Irrigation system as-builts have been provided for the open space lot and the right-of-way along Durston. e. A conditions of approval sheet addressing the criteria listed in this section must be provided with the final plat as set forth in 24.183.1107 ARM and must: i. Be entitled "Conditions of Approval of Annie Phase 4 Subdivision with a title block including the quarter-section, section, township, range, principal meridian, county, and, if applicable, city or town in which the subdivision is located. Response to Recommended Conditions of Approval May 20, 2022 Page 4 of 6 The Conditions of Approval sheet is included as sheet 3 of 3. ii. Contain any text and/or graphic representations of requirements by the governing body for final plat approval including, but not limited to, setbacks from streams or riparian areas, floodplain boundaries, no-build areas, building envelopes, or the use of particular parcels. Text and graphic representations have been provided on the final plat drawings as required. iii. Include a certification statement by the landowner that the text and/or graphics shown on the conditions of approval sheet(s) represent(s) requirements by the governing body for final plat approval and that all conditions of subdivision application have been satisfied. The landowner signed certificate certifying to the improvements has been included on sheet 1 of the final plat drawings. iv. Include a notation stating that the information shown is current as of the date of the certification, and that changes to any land-use restrictions or encumbrances may be made by amendments to covenants, zoning regulations, easements, or other documents as allowed by law or by local regulations. This notation is also included in the certificate on sheet 1 of the final plat drawings. v. Include a notation stating that buyers of property should ensure that they have obtained and reviewed all sheets of the plat and all documents recorded and filed in conjunction with the plat, and that buyers of property are strongly encouraged to contact the local community development department and become informed of any limitations on the use of the property prior to closing. This notation is also included in the certificate on sheet 1 of the final plat drawings. vi. List all associated recorded documents and recorded document numbers. Recorded documents and document numbers have been provided. vii. List easements, including easements for agricultural water user facilities. Documentation of easements has been provided on the final plat. 2. Sec. 38.270.030 – Completion of Improvements. a. If it is the developer’s intent to file the plat prior to the completion of all required improvements, an Improvements Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all improvements in accordance with the preliminary plat submittal information and conditions of approval. If the final plat is filed prior to the installation of all improvements, the developer shall supply the City of Bozeman with an acceptable method of security equal to 150 percent of the cost of the remaining improvements. Response to Recommended Conditions of Approval May 20, 2022 Page 5 of 6 All improvements, except sidewalks, are planned to be completed prior to final plat approval. Therefore, an Improvements Agreement is not anticipated or planned. Sidewalks will not be installed prior to final plat and are therefore listed as a financially guaranteed item on sheet 3 of the plat. It is our understanding that this notation is adequate and typical for sidewalk guarantees, and that the City’s Improvement Agreement form is not required for the sidewalks. 3. Sec. 38.240.450 – Certificate of completion of non-public improvements. a. Certificate must specifically list all installed improvements and financially guaranteed improvements. This certificate has been provided on sheet 3 of the plat. 4. Sec. 38.410.060. – Easements. a. All Easements indicated below must be provided on city standard easements templates. Drafts must be prepared for review and approval by the city. Signed hard copies of the easements must be submitted to the City prior final plat approval. The applicant may contact the review engineer to receive standard templates. b. The applicant must provide a ten foot utility easement (power, gas, communication, etc.) along the developments property frontage. A ten foot wide utility easement along the property frontages (Roger’s Way) has been provided on the plat. A separate easement document has not been provided since it is our understanding that this easement can be dedicated on the plat. c. The applicant must provide a storm drainage easement along the proposed storm sewer main and detention facility. A storm drainage easement on Lots 9 and 10 has been provided and dedicated on the plat. A separate easement document has not been provided since this easement has been dedicated on the plat. An easement has not been provided for the stormwater pond located inside the open space. It is our understanding that an easement is not required for this pond, per our discussions with the City, since the open space lot will be owned and maintained by the HOA. d. The final plat must provide all necessary utility easements and they must be described, dimensioned and shown on each subdivision block of the final plat in their true and correct location. Easements are shown on the plat drawing. 5. Sec. 38.410.130 – Water Adequacy. a. Subject to subsections B and C, prior to final approval by the review authority of development occurring under this chapter or chapter 10, the applicant must offset the entire estimated increase in annual municipal water demand attributable to the development pursuant to subsection D. Response to Recommended Conditions of Approval May 20, 2022 Page 6 of 6 i. Payment-in-lieu of water rights must be made for the townhouse lots prior to final plat approval. Payment of cash-in-lieu of water rights has been made by the landowner. Documentation of the payment has been provided with the final plat application. 6. Sec. 38.410.130.C.2 – Water Adequacy. a. Compliance with this section is deferred for the following developments until the occurrence of future development if the applicant records a notice of restriction on future development in a form acceptable to the review authority with the Gallatin County Clerk and Recorder: Individual lots of a subdivision final plat planned for future multiple-household development. i. A note must be included in the conditions of approval sheet indicating lots which will require future payment of cash-in-lieu of water rights upon future development. A note has been included on sheet 3 indicating that future payment of cash-in-lieu of water rights is required for Lots 10 and 11, prior to development of those lots. Sincerely, WGM Group, Inc. Gary Fox, PE PROJECT ENGINEER W:\Projects\201016\Docs\Subdivision Submittal\Final Plat\Narrative_ResponsetoFOF_AnnieSub.docx