Loading...
HomeMy WebLinkAbout015 Cover Letter 109 E Main Street, Ste B, Bozeman, MT 59715 I OFFICE 406.728.4611 I EMAIL wgm@wgmgroup.com May 20, 2022 Susanna Montana, Senior Planner City of Bozeman, Planning Division 20 E. Olive Street Bozeman, MT 59718 Re: Final Plat Application for Annie Subdivision, Phase 4 Bozeman, MT (2305 Durston Road) Dear Ms. Montana: Please find attached our Final Plat application documents for the above referenced project. These documents are intended to meet the requirements of the City’s Final Plat Checklist (Form “FP”), the Bozeman Municipal Code, and all State requirements. This project was assigned #21201 during preliminary plat. Signed Findings of Fact for the project are dated November 16, 2021. Infrastructure Approval from the City Engineering department is dated January 7, 2022. The following documents are included with the Final Plat application: ➢ Narrative Response to Conditions of Approval ➢ Final Plat Drawings (3 Sheets) ➢ Signed Covenants ➢ Recorded Waiver of Right to Protest SIDs ➢ As-Builts and Construction Documentation. Note the Certification Letter from the City Engineer is forthcoming. As-Builts and certification documents have been submitted to the City Engineer for review and approval. ➢ Deed for Open Space dedication and water right transfer to HOA ➢ Subdivision Guarantee ➢ Irrigation System As-Builts ➢ Cash-in-lieu of Water Rights (documentation of payment) ➢ Gallatin County Weed District MOU ➢ Documentation of Demo of Septic Tank ➢ Signed Findings of Fact dated November 16, 2021 ➢ Final Plat Checklist Form FP Please let me know if you need additional information or have questions. Thank you. Sincerely, WGM Group, Inc. Gary Fox, PE PROJECT ENGINEER W:\Projects\201016\Docs\Subdivision Submittal\Final Plat\CoverLetter_FinalPlat_AnnieSub.docx