Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Annie Subdivision Phase 4_RECORD DRAWINGS
COMMONOPENSPACE2151014DURSTON ROADROGER'S WAYROGER'S WAYDAFFODILSTREETLEGEND-EXISTINGLEGEND-PROPOSEDWGMGROUPWWW.WGMGROUP.COMCOVER SHEET ANNIE SUBDIVISION, PHASE 4 BOZEMAN, MONTANADECEMBER 2021C1.0Know what'sbelow.before you dig.CallRGENERAL NOTES:VICINITY MAPNANNIE SUBDIVISION, PHASE 4BOZEMAN, MONTANANSHEET INDEXC1.0COVERC1.1EXISTING CONDITIONSC2.0ROAD PLAN AND PROFILEC3.0SEWER PLAN AND PROFILEC4.0WATER PLAN AND PROFILEC5.0STORMWATER PIPE PLAN AND PROFILEC6.0DETAILSC6.1DETAILSC6.2DETAILSL1.0OVERALL LANDSCAPE PLANPLOTTED:SAVED:5/19/225/18/22RECORDDRAWING LEGEND-EXISTINGNWGMGROUPOFWWW.WGMGROUP.COMEXISTING CONDITIONS ANNIE SUBDIVISION, PHASE 4 BOZEMAN, MONTANAOCTOBER 2021C1.1C1.1PLOTTED:SAVED:5/18/225/6/22RECORDDRAWING ROGER'S WAYWGMGROUPOFWWW.WGMGROUP.COMROAD PLAN AND PROFILE ANNIE SUBDIVISION, PHASE 4 BOZEMAN, MONTANADECEMBER 16, 2021C2.0NC2.0PLOTTED:SAVED:5/18/225/16/22RECORDDRAWING DAFFODILSTREETROGER'S WAYWGMGROUPWWW.WGMGROUP.COMSEWER PLAN AND PROFILE ANNIE SUBDIVISION, PHASE 4 BOZEMAN, MONTANAMARCH 2022C3.0NPLOTTED:SAVED:5/19/225/19/22RECORDDRAWING WGMGROUPWWW.WGMGROUP.COMSEWER ELEVATIONS TABLE ANNIE SUBDIVISION, PHASE 4 BOZEMAN, MONTANAMARCH 2022C3.1PLOTTED:SAVED:5/18/225/18/22RECORDDRAWING DAFFODILSTREETROGER'S WAY WGMGROUPWWW.WGMGROUP.COMWATER MAIN PLAN AND PROFILE ANNIE SUBDIVISION, PHASE 4 BOZEMAN, MONTANADECEMBER 2021C4.0NPLOTTED:SAVED:5/19/225/18/22RECORDDRAWING NWGMGROUPWWW.WGMGROUP.COMSTORMWATER PIPE PLAN & PROFILE ANNIE SUBDIVISION, PHASE 4 BOZEMAN, MONTANADECEMBER 2021C5.0PLOTTED:SAVED:5/19/225/19/22RECORDDRAWING TYPICAL STREET SECTIONWGMGROUPOFWWW.WGMGROUP.COMDETAILS ANNIE SUBDIVISION, PHASE 4 BOZEMAN, MTOCTOBER 2021C6.0C6.0PLOTTED:SAVED:5/18/225/18/22RECORDDRAWINGTYPICAL STREET SECTION - ROGERS WAY WGMGROUPOFWWW.WGMGROUP.COMDETAILS ANNIE SUBDIVISION, PHASE 4 BOZEMAN, MTDECEMBER 2021C6.1C6.1PLOTTED:SAVED:5/18/225/18/22RECORDDRAWING DETAILDEEP SANITARY SEWER SERVICE LINEWGMGROUPOFWWW.WGMGROUP.COMDETAILS ANNIE SUBDIVISION, PHASE 4 BOZEMAN, MTOCTOBER 2021C6.2C6.2PLOTTED:SAVED:5/19/225/19/22RECORDDRAWINGDETENTION POND CROSS SECTIONPOND OUTLET DETAIL - 48" OUTLET STRUCTURE