Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
004 C-3 GRADING AND DRAINAGE PLAN
TTTTTTTTTEEEEEEEEG G G G G G G G G G G G G G E E E E E E E E E E E E EEEEEEEEEEEEEE E E E E E ETTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT15.0025.0'60.0'6.0'81'31.0'86.0 '114.0'22'6.0'EEE E GGGG G 15.0 'EXISTINGELECTRICALTRANSFORMER6' WIDE X 4"THICKCONCRETESIDEWALKBUILDINGFOOTPRINT,TYPEXISTING SHED25' ASPHALT MILLINGSEXISTING GRAVELPARKING LOT FORUSECHAIN LINK FENCE, 6-FT TALL4'-TALL CHAIN LINK FENCE6' CHAINLINK FENCEGATE6-FT TALL FENCEEXISTING50 KVA 1PH120/240 VTRANSFORMEREXISTINGLIGHT POLEAND CELLTOWEREXISTING 10'NON-EXCLUSIVEUTILITY ANDACCESSEASEMENTELECTRICAL EQUIPMENTFOR CELL TOWEREXISTINGBURIEDUTILITIES TOCELLTOWER24'X40'VERIZONLEASEAREA30'X30''VERIZONLEASEAREAEXISTINGWOODENOUTFIELDFENCEEXISTING 20'NON-EXCLUSIVEACCESSEASEMENTEXISTINGELECTRICALJ-CANEXISTINGCOMMBOXEXISTING3 PHASE277/480 VSERVICETO 3PHASEPANELEXISTINGBURIEDFIBEREXISTINGBURIEDFIBERMAN DOOR W/ STEPBLDG=58.50MILLINGS=57.83GRADE TYPICAL VALLEYTO DRAIN TO PONDEXISTINGDRAINAGEPATHNORTH -NORTHWESTGRADE AWAY FROMBUILDING. SEE TYPICALSECTION.RETENTION POND BCAPACITY: 250 CFDESIGN STORM: 236 CFDEPTH: 3"RETENTION POND ACAPACITY: 399 CFDESIGN STORM: 321 CFDEPTH: 3"THIS AREA NOT SURVEYED DUE TO TEMPORARYEXISTING PILES IN PLACE. PILES TO BE MOVED UNDERSEPARATE PROJECT AND AREA TO BE GRADED TOFLOW WATER AWAY FROM THE BUILDING.HITTING FACILITY BUILDINGFFE=4758.5'OUTFLOW EXISTING TOPOGRAPHY WILL ALLOW 100-YEARSTORM TO FLOW NORTH AS IT HAS IN THE PAST100-YEAR STORM FROM DRAINAGE A AND OFFSITEBASIN C REQUIRED= 8.05 CFSCAPACITY OF 0.4' DEEP SECTION = 10.03 CFSSEE STORM REPORT FOR CROSS SECTIONBLDG=58.50SW=57.83SLOPE=0.54%BLDG=58.50SW=58.17BLDG=58.50MILLINGS=57.83OVERHEAD AND MAN DOORSBLDG=58.50SW=58.50OVERHEAD DOORBLDG=58.50SW=58.50MAN DOORBLDG=58.50SW=58.50MAN DOORBLDG=58.50SW=58.50BLDG=58.50MILLINGS=57.83SW=58.20GRASS=55.00BLDG=58.50MILLINGS=55.00MILLINGS=57.33MILLINGS=57.33BLDG=58.50MILLINGS=57.83GB=57.40MILLINGS=57.11SW=57.83GRAVEL=57.80SW=58.38GRAVEL=58.38SW=58.38GRASS=58.05SW=58.05GRASS=58.00SW=57.47GRASS=57.14SW=57.35GRASS=57.02SW=58.22GRASS=57.89SW=58.16GRAVEL=57.836' SIDEWALK6' SIDEWALK6' SIDEWALK 15' PATIOBASIN ABASIN BPROPOSEDCONTOURSBASIN B11"X17": 1"= 40 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )10202020SERPOFSTNMOAANGNDR SCHULTZGARRETT41803 PEATNIGSIEOLEREEERIEN HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2022VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2028\001\ACAD\SHEETS\C-3 GRADING AND DRAINAGE PLAN.dwg Plot Date: 4/13/2022 6:09 AM© HEADWATERS ENGINEERING, INC.REVISION DATE:190 NORTHSTAR LANE, BOZEMAN, MT 59718HEADWATERSMT.NET 406-581-5730PROJECT LOCATIONMONTANABOZEMAN04/11/2022GPSGRADING AND DRAINAGE PLANBUCKS HITTING FACILITY SITE PLANBOZEMAN LEGION BASEBALL2028.001C-3RIGHT FIELD FOUL LINENOTES:1.LOW=LOW POINT, HI=HIGH POINT, GB=GRADEBREAK, SW=SIDEWALK.2. THE CONTRACTOR IS TO VERIFY THE CROSSWALKS AND ACCESSIBLE PARKING SPACES HAVE ACROSS SLOPE LESS THAN 2%.MAINTENANCEREGULAR MAINTENANCE OF STORM WATER FACILITIES IS NECESSARY FOR PROPER FUNCTIONING OF THE DRAINAGESYSTEM. IN GENERAL, REGULAR MOWING OF ANY GRASS SWALES AND STORAGE PONDS WILL BE REQUIRED TO PREVENTSTANDING WATER, CLOGGING, AND THE GROWTH OF WEEDS AND WETLAND PLANTS. MORE SUBSTANTIAL MAINTENANCE,SUCH AS SEDIMENT REMOVAL WITH HEAVY EQUIPMENT, MAY BE REQUIRED IN COMING DECADES TO RESTORE RETENTIONPOND VOLUME.ALL MAINTENANCE AND REPAIR SHOULD BE PRIORITIZED AND SCHEDULED IN ADVANCE. TYPICAL MAINTENANCE ITEMSINCLUDE REMOVING OBSTRUCTIONS FROM FENCING, MOWING GRASS AND WEEDS, TREE MAINTENANCE TO PREVENT LIMBSFROM FALLING AND BLOCKING SWALES, AND ESTABLISHING GROUNDCOVER ON BARE GROUND. RETENTION POND A CROSS SECTIONNTSCONNECT POND BOTTOM TOSOIL THAT DRAINS SO THATPOND FULLY DRAINS WITHIN 48HOURS AFTER A STORMPOND BTM4:1 3"4:14:1EXISTINGGROUNDDRAINAGE BASIN LEGENDAREA HATCHED IN RED IS DRAINAGE BASIN A.AREA HATCHED IN BLUE IS DRAINAGE BASIN B.SEE OFFSITE DRAINAGE BASIN EXHIBIT FOR OFFSITE BASINS.SECTION A-A: TYPICAL SWALE AWAY FROM BUILDINGNTSGRAVEL*-2%*EG 1%BUILDING FACESIDEWALK*LENGTH VARIES, SEE PLAN VIEWA A AA RETENTION POND B CROSS SECTIONNTSCONNECT POND BOTTOM TOSOIL THAT DRAINS SO THATPOND FULLY DRAINS WITHIN 48HOURS AFTER A STORMPOND BTM4:1 3"4:14: 1 EXISTINGGROUND3"STEP POND DOWN AS REQUIREDTO FIT EXISTING CONTOURSPOND BTM