Loading...
HomeMy WebLinkAbout027 8-2_CM-1 CONSTRUCTION MANAGEMENT PLANEXISTI N G ELECT R IC A L TRANS F OR ME R RIGHT FI E LD FO U L L I NE EXIS T IN G S HE D EXISTI N G G RA VE L PA RK I NG LO T FO R U SE CHAIN L I N K F E N C E , 6 - FT T AL L ELEC T R IC AL EQ U I PM EN T S E CU R IT Y F E NC E T O R E MA I N 4'-TALL CH A IN L IN K FE NC E 6' CH A IN L IN K FE NC EGATE 4-FT TA L L C H AI N L I N KFENCE 24' CH A IN L IN K S W IN G G AT E 4' CHA I N L I N K SW I NG G AT E 4' CHA I N L I NK SW I NG GA T E 6-FT T A LL FE N CE EXISTIN G L I GH T P O LE AND CE L L T OW E R EXIST I NG 1 0' NON-E XC L US I VE UT I L I TY AND A C CE SS E AS EM E NT ELECT R IC A L EQUIP ME N T FOR C E LL TOWE R EXISTING BU R IE D UTILIT I ES TO CE L L TOWER 24'X40' V ER I ZO N LEASE A RE A 30'X30 ' ' VE R IZ ON LEASE AR E A EXIST I NG WO OD E N O UT F IE L D FENCEEXISTIN G 20 'NON-EXC L US I VE AC C ES S EASEM E NT EXISTIN GELECTR I C AL J -C AN EXISTIN GCOMM B O X REMOV E EX I ST I NG L IG HT P OL E PROT E CT EX I S TI N G B UR I ED POWE R F O R F I EL D L I GH T IN G CIRCU I T O R R EM O VE AN D RELOC AT E . C OO R DI N AT E W / ENGIN E ER . EXISTI N G 3 PH AS E 277/48 0 V S ER V IC E TO 3 P H AS E P A NE L EXISTIN G 3 PH A SE PANEL EXIST I NG BURIED F IB ER EXISTIN GBURIED F IB E R EXIST I NG BE R M EXISTIN G C OM M EXISTINGGAS EXISTINGBURIED E L EC TR I CA L EXIST I NG BA S EB A LLDUGOUT TTEEG G G G G G G E E E E E E E EEE E E E ETTTTTT T T T T T T T /////////////////////////////////////////////////////////////////////////////////////// /////////////// //////////// /// //////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// ///////////////////////////////////////////////////////////////////////////////////////////////////////////////////// //////////////////////////////////////////////////////////// /// ///////////////////// /////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// ////////////EG11"X17": 1"= 160 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )40808080SERPOFSTNMOAANGNDR SCHULTZGARRETT41803 PEATNIGSIEOLEREEERIEN HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2022VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2028\001\ACAD\SHEETS\C-4 CONSTRUCTION MANAGEMENT PLAN.dwg Plot Date: 4/11/2022 12:41 PM© HEADWATERS ENGINEERING, INC.REVISION DATE:190 NORTHSTAR LANE, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN04/11/22GPSCONSTRUCTION MANAGEMENT PLANBUCKS HITTING FACILITY SITE PLANBOZEMAN LEGION BASEBALL2028.001CM-1CONSTRUCTION NOTES:1. CONSTRUCTION TRAFFIC WILL LEAVE THE SITE THROUGH TAMARACK ST. OROAK ST.2. THIS SHEET INTENDS TO SHOW ADJACENT STREETS AND BUILDINGSGRAPHICALLY AND THOSE FACILITIES HAVE NOT BEEN SURVEYED WITH THISPROJECT.TAMARACK ST.ROUSE AVE.OAK ST.INSTALL 248 LFCONSTRUCTION FENCETO CONTAIN DEBRISGRAVEL PARKING LOTMATERIAL STAGINGAREATOILET30 CYD ROLLOFF DUMPSTEREXISTINGHOCKEY RINKBUILDINGEXISTINGHOCKEY RINKBUILDINGEXISTINGCOUNTYBUILDINGEXISTINGCOUNTYBUILDINGTHIS AREA INCLUDES THEPROPOSED CITY OFBOZEMAN PUBLIC SAFETYCENTER AND ISCURRENTLY UNDERCONSTRUCTIONEXISTINGCOUNTYBUILDINGEXISTINGCOUNTYBUILDINGEXISTINGCOUNTYBUILDINGEXISTINGCOUNTYBUILDINGEXISTINGCOUNTYBUILDINGEXISTINGCOUNTYBUILDINGEXISTINGCOUNTYBUILDINGEXISTING GRANDSTANDSEXISTING BLEACHERSEXISTING CONCESSIONSAND LOCKER ROOMCONSTRUCTION TRAFFICCAN ENTER AND EXIT HERETO OAK ST.CONSTRUCTION TRAFFICCAN ENTER AND EXIT HERETO TAMARACK ST.