Loading...
HomeMy WebLinkAbout35 S-A7-0 - DETAILS1/8" SLIPNOT NOSING, GALVANIZED STAIR PAN STRINGER PER STRUCT. 11"1"VARIESCONCRETE TREAD GRATE 1 1/4", SERRATED TEXTURE STAIR PAN STRINGER PER STRUCT. 11"1"VARIES1/8" SLIPNOT NOSING, GALVANIZED F G CLCL TYP 10"3' - 6" CL 10' - 2"VFY.2' - 2"VFY.2' - 8"7' - 6"2' - 0"1' - 0" SLAB ON GRADE PER STRUCTURAL FINISH FLOOR AS PER SCHEDULE GRAVEL AS PER STRUCTURAL COMPACTED FILL FOUNDATION RIGID INSULATION @ PERIMETER PER INSULATION LEGEND SIDING PER ELEVATIONS MOISTURE BARRIER SEALED AT TOP & BOTTOM OF WALL & AT ALL OPENINGS PLYWOOD SHEATHING PER STRUCTURAL 5/8" GYP BOARD CONCRETE FOOTING AS PER STRUCTURAL VAPOR BARRIER, SEAL TO FOUND. WALL • FINISHED FLOORING • SLAB ON GRADE OVER • VAPOR BARRIER UNDER ENTIRE SLAB • RIGID INSULATION FOR 24" AROUND PERIMETER FOUNDATION WALLS TYPICAL 1st LEVEL FLOOR ASSEMBLY TYPICAL EXTERIOR WALL ASSEMBLY FOR AIR BARRIER CALK BETWEEN STUDS & STUDS TO FOUNDATION • EXTERIOR FINISH MATERIAL PER ELEVATIONS • MOISTURE BARRIER • PLYWOOD SHEATHING • WOOD FRAMING • 2" MIN., R-14 MIN., CLOSED CELL POLYURETHANE SPRAY INSULATION ON INSIDE OF EXTERIOR SHEATHING (ACTS AS EXTERIOR AIR BARRIER BUT MUST FOLLOW DETAIL AND BLOCK UNDER WINDOWS & SEAL AROUND ENTIRE WINDOW, ALSO ACTS AS INTERIOR VAPOR BARRIER) • 3-1/2", R-13 BATT INSULATION • 5/8" GYP BOARD TAPED & SEALED TROWEL FINISH TOP OF ALL FOUNDATION WALLS SET FRAMING FLUSH W/ EXT. FACE OF FND WALL INSULATION PER INSULATION LEGEND SLOPE TO DRAIN 6" WOOD FRAMING PER STRUCTURAL TYP. 8" FOUNDATION WALL, VERIFY SIZE AND PLACEMENT PER STRUCTURAL SLAB ON GRADE PER STRUCTURAL FINISH FLOOR PER SCHEDULE, TBD COMPACTED FILL MOISTURE BARRIER PLYWOOD SHEATHING PER STRUCTURAL CONCRETE FOOTING AS PER STRUCTURAL 5/8" GYP BOARD GRAVEL AS PER STRUCTURAL FOUNDATION RIGID INSULATION @ PERIMETER PER INSULATION LEGEND VAPOR BARRIER SEAL TO FOUND. WALL FOR AIR BARRIER CAULK BETWEEN STUDS & STUDS TO FOUNDATION BRICK VENEER (SEE STRUCTURAL FOR VENEER ANCHORS) WEEPS AT 24" O.C. BUILDING WRAP LAP OVER METAL FLASHING -TYP. CAVITY DRAINAGE MATERIAL SET FRAMING FLUSH W/ INT.FACE OF FND. WALL TROWEL FINISH TOP OF ALL FOUNDATION WALLS TYP. 10" FOUNDATION WALL, VERIFY SIZE AND PLACEMENT PER STRUCTURAL 6" WOOD FRAMING PER STRUCTURAL T.O. WALL TO T.O. GRADE TYP.1' - 0"INSULATION PER INSULATION LEGEND PLAN -1ST LEVEL 100' -0 3/4" 10 1' - 6"CL1' - 6"4' - 0 1/2"JOB No.SHEET NUMBERPROJECT / OWNERARCHITECTLOCATI ARCHITECTS1007 E. MAIN SUITE 202 BOZEMAN MONTANA406-587-1139 FAX 587-7369COPYRIGHT LOCATI ARCHITECTS P.L.L.P.2020 ALL RIGHTS RESERVEDPROJECT MGR1930UNIVERSITY CROSSING - SOUTHS 19TH AVE & KAGY BLVDBOZEMAN, MTS-A7.0DETAILSXXXXXDETAIL SCALE: 1 1/2" = 1'-0"S-A7.0 REF: 1 / S-A6.10 (CAST IN PLACE STAIR)1 DETAIL SCALE: 1 1/2" = 1'-0"S-A7.0 REF: 1 / S-A6.10 (METAL GRATE TREAD STAIR)2 DETAIL SCALE: 1/2" = 1'-0"S-A7.0 REF: 1 / S-A2.0 (ELECTRICAL METER ELEVATION)3 DETAIL SCALE: 1 1/2" = 1'-0"S-A7.0 (WOOD STUD W/ SIDING @ FOUNDATION TYP.)5 DETAIL SCALE: 1 1/2" = 1'-0"S-A7.0 (WOOD STUD W/ BRICK @ FOUNDATION TYP. @ GRADE)6 ISSUE#DATESP RESUBMIT44-13-22DETAIL SCALE: 1/2" = 1'-0"S-A7.0 REF: 1 / S-A2.0 (GAS METER ELEVATION)4