|UNIVERSITY CROSSING|
S. 19th Ave & Kagy Blvd
Bozeman, Montana
(concurrent with CUP ground level residences)
(concurrent with Z13174 Site Plan MOD)
(concurrent with Annexation #21152)
Project Narrative
The proposed buildings have apartments on all three levels. This project is requesting a CUP for
conditionally allowing main level residential units. The proposed buildings have residential uses
on the main level, however the buildings will be designed so the main level represents a more
commercial appearance on the ends of the buildings that face the streets and constructed with a
higher second floor level floor is may easily be converted to commercial uses in the future.
Site plan with CUP for residential on main level. Lot 1A, Minor Subdivision 503A property located
near S. 19th Ave and Kagy Blvd is planned to be developed with (2) three story buildings. North
Building approx. 21,280 sq. ft. SF, South Building approx. 28,410 SF containing 59 one-bedroom
apartments. The site is located in the community commercial designation area and zoned B-2.
Departures/Deviation: This project is requesting a deviation to the code. See below city
comments and response to Section 3 – Required Code Corrections BMC 38.520.030.C.
Noticing Checklist: See Documents Folder
Traffic Study: See Documents Folder
CIL of Parkland: We propose Improvements-in-lieu to Spanish Peaks Park. No proposed park
on the site. See AC5.0 Spanish Peaks Park Improvements drawing sheet for proposed
improvements. The type of improvements proposed on the park are focused toward tenant uses.
See bid estimate for improvements is included in the documents folder.
Weed Maintenance Plan: No Weed Maintenance Plan has been provided because we are
developing 100% of the site.
Exempt Wells/ CIL Water Rights: No exempt wells proposed for irrigation. CIL of water rights is
expected to be paid for irrigation needs in addition to building use, see documents folder (CIL of water
rights Memo).
Storm Detention: This project will propose underground storm detention systems. The site is planned
to be filled to raise grade as well
Access Easement: Common Lot access easement will be executed for vehicular access on a shared
property boundary.
Concurrent Construction: See documents folder for CRF and Memo
Phasing: No Phasing Plan has been provided because both buildings will be constructed together
with separate building permits for North and South buildings along with accessory structures.
NCOD: No neighborhood conservation districts
Narrative - Page 2 of 10
See A0.0 Site Cover for the following:
Zoning
Permitted Use
Maximum Lot Coverage
Maximum Building Height
Block Frontage
Setbacks
Parking Required
Bike Parking
Open Space
Parkland
SITE PLAN SUBMITTAL CITY COMMENTS: (with Applicant comments)
Section 2 – Conditions of Approval & Advisory Comments
Please note that these conditions are in addition to any required code provisions identified in
this report. The following conditions are specific to the development:
1. The applicant is advised that unmet code provisions, or code provisions that are not
specifically listed as conditions of approval, does not, in any way, create a waiver or
other relaxation of the lawful requirements of the Bozeman Municipal Code or state
law.
2. The Site Plan approval cannot be approved until the Crowley Fleck Building Modification
(21321) is approved.
3. Prior to final plan approval, the western property line subdivision annexation and
subdivision exemption must be finalized to ensure applicant has ownership and control
over the entire proposed site limits.
4. The Cash-in-lieu Water Rights (CILWR) contribution must be paid to the City in full prior
to final plan approval.
5. The Development Review Committee reviewed your request for concurrent
construction and is likely in support of this request, however, be advised that in order
for concurrent construction to be approved the requirements within 38.270C.1.c.(1) and
as stated hereafter, must be met: Any required on-site or off-site extensions of water
mains sewer mains, stormwater system, or streets to be dedicated to the public: must be
located entirely within publicly held easements or rights-of-way; must serve only a single lot; are
the subject of an irrevocable offer of dedication to the city upon completion of
the project; the development is under the control of a single developer who must retain
control of the entire project until final completion; all work is under the supervision of a
single general contractor; and no subdivision of land is involved.
Section 3 – Required Code Corrections
Community Development Department, Development Division, Lynn Hyde,
lhyde@bozeman.net, 406-579-1471
1. Site Plan Comments
BMC 38.400.090.C.3.b.(1) Two way drive access must be a minimum of 24
feet and one-way drive access must be a minimum of 16 feet. Confirm you are
meeting these dimensions in all areas of the parking.
Dimensioned drive, see AC2.1 Architectural Site Plan
BMC 38.510.030.C Landscape Block Frontage (Kagy) As you have noted, the
Narrative - Page 3 of 10
landscape block frontage applies to Kagy. The landscape block frontages
requires a minimum 10’ buffer of landscaping between the street and off street
parking areas. Please increase your landscaping to meet this standard.
Updated 10’ buffer of landscaping in this area, see AC2.1 Architectural Site
Plan
BMC 38.520.030.C. Light and air access and privacy alongside rear property
lines Buildings or portion thereof containing multi-household dwelling units whose
only solar access (windows) is from the applicable side of the building (facing
towards the side property line) must be set back from the applicable side or rear
property lines at least 15 feet. The internal units on the southern building
appear to only receive their solar access (windows) from the side of the building
facing the side property line, thus requiring the 15’ setback. See below image
for the units I’m referring to. While I’ve highlighted the units on the 3
rd floor, this applies to these internal units on all floors.
Updated these four units at all levels to allow light and air on North/South
walls of each bedroom exterior wall. We are asking for a deviation to the
code to allow this design to be approved, see architectural plans and
elevations sheets S-A2.0, S-A2.1, SA2.2, and SA3.0
BMC 38.520.040.C.2. Sites with residential units. Provide direct pedestrian
access between all ground related unit entries and a public street or to a clearly
marked pathway network or open space that has direct access to a public street.
A pedestrian route needs to be provided that connects the southern portion of
the site to S 19th Ave including marked crosswalks where the route crosses a
vehicular access area. This comment was also provided in the Modification
application.
Updated pedestrian access to adjacent property to provide pedestrian
route to S 19th Ave., see AC2.1 Architectural Site Plan
BMC 38.520.070.C.2. The sides and rear of service enclosures must be
screened with landscaping at least five feet wide in locations visible from the
street, parking lots, and pathways to soften views of the screening element and
add visual interest. Current site plan is not meeting this requirement.
Updated trash enclosure design with landscaping buffer, see AC2.1
Narrative - Page 4 of 10
Architectural Site Plan & L104 Landscape Site Plan
BMC 38.570.040.F.2. Poles supporting lighting fixtures for the illumination of
parking areas and located directly behind parking spaces must be placed a
minimum of five feet outside the paved area or on concrete pedestals at least
30 inches high above the pavement, or suitably protected by other approved
means. Current site plan is not meeting this requirement.
Updated design of poles to have bases at all locations, see AC2-4 -
Photometric Details, pole base detail
Submit a site photometric plan that shows the footcandles and extends the
information across the entire site (all the way to the property lines) so staff can
ensure it is meeting the requirements of 38.570.
See AC2.3 Photometric Site Plan
Parks, Matthew Lee, mjlee@bozeman.net, (406) 582-2339
Cash-in-lieu of Parkland (CILP) appraisal value is currently $2.07 PSF
(effective June 22, 2021). Final CILP appraisal value is determined at the time of
final plan approval.
For providing CILP, please provide written justification as a separate document
per Resolution 4784
See Documents CIL of Parkland Calc. and Park Improvements Estimate
Provide parkland calculations within the Park Plan narrative. Calculation for
IILP provided in 12-1 Park IILP Estimate is different than the estimate in A0-0
Cover Sheet.
o Design & Installation is not counted towards IILP – only the cost of the pavilion
is included as IILP. Please adjust the IILP estimate.
See Documents CIL of Parkland Calc. and Park Improvements Estimate
o Resolution 4784 excerpt regarding IILP:
All parkland proposals are reviewed by the Rec and Park Advisory Board or its
Subdivision Review Committee and approved by the City Commission at formal
Site Plan submittal.
Engineering Division, Cody Flammond, cflammond@bozeman.net,
(406) 582-2287
Narrative - Page 5 of 10
Stormwater
1. BMC 38.410.080 D. Grading and Drainage – Stormwater ponds/facilities
serving multiple lots in separate ownership must not be located on private lots or
public rights of way.
a. The applicant has proposed eliminating the common open space lot defined
for shared storm water and using this lot as development space.
i. The common open space lot must be redefined using the minor subdivision
process into developable space; and
ii. Because the common open space lot is being eliminated, the site storm water
must be contained and treated per city requirements (BMC 40.074.700 (A)/DSSP
Section II (B) - Storm Drainage Plan) for each individual lot in the development.
The common open space lot is not going to be removed. The common
open space will continue to be used as shared storm water, the proposed
change is serving as an underground storm water system with shared
parking on the surface for adjoining lots.
2. DSSP Section IV (C)(5) - The use of sidewalk chases is discouraged, and
their use is limited to situations where it is not possible to use standard inlets and
piping.
Standard Inlets have been proposed for the Kagy Boulevard
improvements/expansion.
a. The applicant must use a standard inlet and piping for the collection and
conveyance of drainage from Kagy Boulevard to Retention Pond 1.
Standard Inlets have been proposed for the Kagy Boulevard
improvements/expansion.
3. Stormwater Management Design Report
a. In Appendix D- Groundwater Monitoring Results, the monitoring well depths
are reported as being between 2 and 2.25 feet below ground surface, but the
groundwater depths are reported as being between 6.08 and 7.9 feet below
ground surface. The applicant must revise the sheets to report the actual depth
of the wells.
The “well depths” in the Groundwater Monitoring spread sheet is the
perforated PVC pipe height from ground surface to top of the pipe above
the ground. The groundwater monitoring has been updated with the
surveyed elevations of the surrounding ground surface and top of
monitoring well to more accurately estimate the true ground water depth.
Groundwater depth values have been updated in the stormwater design
report.
b. The geotechnical report provided states the seasonal high groundwater is
approximately three and one half feet below ground surface. The applicant must
demonstrate that adequate storage will be available above the seasonal high
groundwater level to meet the water quality and quantity standards.
See Documents: updated Stormwater Management Design Report last page
regarding the depth the SHGW and the groundwater monitoring that was
Narrative - Page 6 of 10
done on the site. The update site plan provides adequate storage above
SHGW.
c. Drainage Area 5 needs to include the entire area to be improved that will drain
to Retention Pond 1.
The improvements to Kagy Boulevard have been divided in to two drainage
areas that will drain two underground retention chambers. The drainage
areas include the entirety of the Kagy and 19th ROW that will drain to the
proposed chambers.
d. The applicant must demonstrate how stormwater drainage is managed for
Kagy Boulevard east of the current Drainage Area 5 boundary.
The improvements to Kagy Boulevard have been divided in to two drainage
areas that will drain two underground retention chambers. The drainage
areas include the entirety of the Kagy and 19th ROW that will drain to the
proposed chambers.
e. The applicant must provide the regulatory reference for using an infiltration
rate of 26 inches per hour or provide onsite infiltration test results.
Falling Head Percolation Tests have been performed near the proposed
infiltration chamber locations and included in the updated Stormwater
Management Report.
f. DSSP Section II (A)(4) Water Quality - The applicant must include a drainage
plan with post-construction storm water management controls that are designed
to infiltrate, evapotranspire, and/or capture for reuse the post-construction runoff
generated from the first 0.5 inches of rainfall from a 24-hour storm preceded by
48 hours of no measurable precipitation. For projects that cannot meet 100% of
the runoff reduction requirement, the remainder of the runoff from the first 0.5
inches of rainfall must be either:
a. Treated onsite using post-construction storm water management control(s)
expected to remove 80 percent total suspended solids (TSS); b. Managed offsite
within the same sub-watershed using post-construction storm water management
control(s) that are designed to infiltrate, evapotranspire, and/or capture for reuse;
or c. Treated offsite within the same subwatershed using post-construction storm
water management control(s) expected to remove 80 percent TSS.
i. The applicant must meet the water quality requirement in Drainage Area 4 for
the entire Drainage Area 4 area.
This item is noted. The proposed Drainage Area 4 has been subdivided and
renamed to new drainage areas. These areas will now drain to two
proposed retention ponds on the west side of the property.
4. DSSP Section II (B) Stormwater Facility Maintenance Plan
a. The applicant must identify who owns the facilities.
This is noted. The Stormwater Facility Maintenance Plan has been provided
both for the subdivision facility located in Open Space 1 (owned and
maintained by the property owners association and the on-site stormwater
facilities (owned and maintained by the Lot 1A-1 owners)
Narrative - Page 7 of 10
b. The applicant must separate the maintenance of the retention pond from the
Stormtech system maintenance.
This item is noted. The maintenance for different stormwater facilities have
been separated in the plan.
i. Maintenance for each facility shall be adequately addressed in the Stormwater
Facility Maintenance Plan.
Noted
c. The applicant must fill in the subdivision number blank.
Water Rights
Will be filled in with the amended Plat
1. BMC 38.410.130 (A) (1) Water rights – Cash-in-lieu of water rights for 7.32 AF
at $6,000/AF, $43,896 (per Griffin Nielsen) must be paid prior to site plan
approval.
Water and Wastewater
1. The water demand memorandum states that a three-inch service line will be
used for the north building but the plans shown a four-inch service line will be
used. The applicant must clarify what size service will be used.
Four inch services will be used then reduced to a 3 inch meter
2. DSSP Section (V)(A) Water Design Report - A water design report must be
prepared by a professional engineer for the proposed project and submitted for
review. The water distribution system must be designed to meet the maximum
day demand plus fire flow and the peak hour demand.
A water and sewer design report has been provided showing adequate
capacity for the domestic water demand and fire demand. Sanitary Sewer
flow estimates and system design have been included in the report.
3. DSSP Section (V)(B) Wastewater Design Report - A wastewater design report
must be prepared by a professional engineer for the proposed project and
submitted for review. The wastewater system must be designed to meet the peak
hour flow plus infiltration.
A water and sewer design report has been provided showing adequate
capacity for the domestic water demand and fire demand. Sanitary Sewer
flow estimates and system design have been included in the report.
Transportation
1. BMC 38.400.070 Street Lighting - City standard street lights are required along
the frontage of Kagy Boulevard, per the arterial spacing requirements. The street
lighting must shown on the site plan. Infrastructure plans for the construction for
the street lights must be submitted to the City Engineering Department per the
Design Standards and Specifications Policy Manual. The street lights must be
part of an SILD prior to occupancy of the proposed project.
Narrative - Page 8 of 10
A street lighting photometric plan has been provided with the resubmittal,
see Documents: Roadway Lighting Improvement
2. BMC 38.400.060 Street Improvement Standard – Kagy Boulevard is classified
as a principal arterial street. Development of the Site requires the improvement of
this street along the Site’s frontage to City standards, including proper drainage,
dedication of right-of-way (ROW), pavement, detached sidewalks, landscaped
and irrigated boulevard strip, trees within the boulevard, curb and gutter and
proper access points into the Site.
a. The applicant must improve Kagy Boulevard from 19th Avenue to the
development’s western boundary.
Site design complies, see L101 – Overall Landscape Plan
3. BMC 38.220.060 (A)(12) Traffic Generation - A traffic impact study will be
required for the proposed development which will need to discuss how much
daily traffic will be generated on existing local and neighborhood streets, roads
and alleys, when the subdivision is fully developed.
a. The submitted traffic impact study is missing the appendices. The applicant
must submit the traffic impact study appendices.
See Documents TIS
4. BMC 38.400.100 Street Vision Triangle- No fence, wall or planting in excess of
30 inches above the street centerline grades is permitted within a street vision
triangle. The applicant must show the street vision triangles for all street
intersections and accesses.
The street vision triangle has been more clearly labeled and updated to
match the realigned drive access.
5. BMC 38.400.110 (A) Transportation Pathways - Pathways must be installed in
accordance with this chapter, the growth policy, the most recently adopted long-
range transportation plan, any adopted citywide park plan, and any adopted
individual park master plan, and must comply with City of Bozeman Design
Specifications.
a. The applicant must show the feasibility for expanding the ten-foot wide shared
use pathway along Kagy Boulevard to 14-foot wide.
10’ pathway is shown. A 14’ wide pathway could take up most of the 15’
wide public street and utility easement.
b. The applicant is advised that concrete is the preferred surfacing for the shared
use pathway, but asphalt is allowed.
Noted
Waiver of Right to Protest Creation of Special Improvements Districts
1. The applicant must revise the Waiver of Right to Protest Creation of Special
Improvements Districts as shown on the attached redlined document.
Concurrent Construction
1. BMC 38.270.030.C.1 - To achieve building permit approvals prior to
completion of the public infrastructure improvements associated with the
Narrative - Page 9 of 10
development, the applicant must follow BMC 38.270.030.C.1 options b and c.
The following items must be in place prior to building permit approval as can be
seen in 1 through 4 of Subsection c.
a. All easements for the infrastructure must executed.
b. An irrevocable offer of dedication must be delivered to the Engineering
Division.
c. Approval from the Fire Department (Scott Mueller) to simultaneously construct
the infrastructure and private development. This approval must be sent to the
Engineering Division.
d. Infrastructure approval must be provided by the City Engineering Division and
the state.
2. Irrevocable Offer of Dedication
a. The applicant must revise the document to place the signature and notary on
the same page.
b. The applicant must revise the application number to 21327.
c. The applicant must insert the dates of site plan approval and infrastructure
plans with the final submission of the document.
Watercourse Setback
1. BMC 38.410.100 (A)(2)(d) - No newly constructed residential or commercial
structure, addition to an existing structure, fence, deck, fill material (other than
that required for exempt uses), parking lot or other impervious surfaces, or other
similar improvements may be located within required watercourse setbacks,
unless approved through, and in conformance with, a variance or deviation
process as authorized in this chapter.
a. The applicant must not place fill in the watercourse setback.
This item is noted. The grading has been revised to meet existing grades at
the edge of the Zone 2 setback. Exposed foundation walls along the west
sides of the proposed building will be utilized to prevent grading into the
Zone 2 setback.
NorthWestern Energy; Kory Graham, Kory.Graham@northwestern.com
See comments submitted 3-17-21 DRC meeting.
Civil Site Plan shows gas and electric meter location on the east side of the
building on the north side and inside a breezeway of the south building. The
needed width between buildings when installing meters is a minimum of 10 feet
wide. The building elevation views for the north building does not show the
proposed gas and electric meter location. If each unit will be metered separately
then, with 23 units for the north building and 36 units for the south building, the
area for the installation of 23 & 36 electric and 23 & 36 gas meters will require a
substantial amount of wall space. As stated in previous comments, gas meters
can only be stacked two high. With 23 gas maters there will need to be 11 meters
on the top row and 12 gas meters on the bottom row. Length of wall space
needed would be between 18 ft to 20 ft in length & 5 ft high. With 36 gas meters
will require 18 gas meters on the top row and 18 gas meters on the bottom row.
Length of wall space needed would be between 28 ft to 30 ft in length & 5 ft high.
Electric gear and electric meters will need to be installed within the same location
as the gas meters with the required separation. Electric meters can be stacked
up to 4 meters high.
See Sheets N-A7.0 Details and S-A7.0 Details for gas and electric meter
Narrative - Page 10 of 10
designs for both buildings.
Submit an application online to have the NWE project engineer work with the
applicant.
See Documents NWE Application submitted Memo
Go to www.northwesternenergy.com/construction to apply online Montana
Construction Application, and access Montana New Service Guide to provide
information on electric and gas service requirements. Once an application is
submitted the NWE project engineer will be in contact with the applicant.
Solid Waste Division; Russ Ward, rward@bozeman.net, 406-582-3235
1. Roof of enclosure may not overhang the enclosure opening to allow for truck
access.
Updated the roof design, See AC3.0 Refuse Enclosure, Site Details
2. Doors must swing open minimum of 180 degrees. The current plan shows
parking to the right of the enclosure if a car is in that spot doors cannot open
180 degrees to allow truck access.
Updated enclosure site layout, See AC2.1 Architectural Site Plan
Fire Department; Scott Mueller, smueller@bozeman.net
Vehicular access and site layout appear acceptable at this time.
Water Conservation Division; Chelsey Trevino, ctrevino@bozeman.net
See attached advisory comments.
Attachments:
1. Engineering review comments
2. Water Conservation advisory memo.