Loading...
HomeMy WebLinkAboutC1.2DesignPlan o / 3 LOT 1 // h LOT SA EVERGREEN BUSINESS PARK / EX. ELECTRICAL JUNCTION BOX / III PROPOSED WATER SERVICE'S w w w�x -w w It / w ANTICIPATED LOCATION OF PROPOSED SANITARY STREET VISION GILd{ERSON DRIVE - - y _ PROPOSED UNDERGROUND POWER v�EVERGREEN DRIVE SEWER SERVICE TRIANGLE (TYP.) _ _ _ s s 3 PROPOSED PROPOSED 15' PROPOSED FENCING s s PROPOSED 1" 26.0' s 40.0' RCP CULVERT III w 2% \ -,--s s BIKE RACK. s PROPOSED 3.2' III CURB STOP PROPOSED 15" RCP CULVERT \\ s s s-LANDSCAPE BUFFER. III s s s �s 15.0' r -PROPOSED RED. RAMP. .••' PROPOSED 5-FT N _ ! WIDE SIDEWALK ,.r 1.,/"1 _26.0' Q \\ 10.0' BLOCK FRONTAGE / I C 10.0' FROM I }. - '-tl SETBACK 107.0' PARKING 40.0'3 M -10.0' / ,ASSUMED ROWC3-12' DUAL WALL HOPE NEW 10.0' UTILITY ••• - -------- 15:0' LOT FRONTAGE � EASEMENT 5.0' -- --- -- UTILITY CONDUITS PROPOSED 5-FT I r- a Ju Ju J --_ -_- _ _- JU _--JO - --0 _ JU JU _ _JU _ __ WIDE SIDEWALK. 1 PROPOSED (1) 1 8.0 9'0 18.0' _ CONC. STEP } 10 .. I 8.0'�{ PROPOSED 4" SE R 26 PVC SEWER PROPOSED ° PROPOSED PROPOSED 20.0' FRONT LOT RED. RAMP. SNOW SERVICE 02% MIN. GRADE. 9.0' LIGHT POLE PROPOSED / I I ZONING SETBACK � --- STORAGE � / PROJECT SITE: hn LOT 3A LIGHT POLE LOT 3A OF AMENDED McCHESNEY INDUSTRIAL PARK SUBDIVISION III I I NEW 10.0'UTILITY VAN ACCESSIBLE / I / / LOCATED IN THE NORTHEAST ONE OF SECTION 1, TOWNSHIP 2 CONNECT TO EX. 4" SEWER 1 90' 0.99 ACRES zs.Q' a �' ' 1 �/ EASEMENT PARKING SIGN. n, L5' LANDSCAPE / SOUTH, RANGE 5 EAST, PRINCIPAL MERIDIAN MONTANA, CITY OF BOZEMAN, SERVICE. INV 4723.58. VERIFY PRIOR TO CONSTRUCTION. PROPOSED 7-FT I y SCREENING �j GALLATIN COUNTY, MONTANA III PROPOSED •'• 7.0' WIDE SIDEWALK 1 o • p / � SITE SUMMARY: •�'! w BUILDING '••� O ,�� I I I II SITE AREA (GROSS): 0.99 ACRES (43,262 SF) LOT 13& 14 PROPOSED 500 GAL. SAND OIL SEPARATOR :.Y 9 9.0' 9.0' ` ,PROPOSED DUMPSTER' APPROX. AREA OF BUILDINGS: 8,621 SF (19.9%) \l� II /III • 26.0' PROPOSED PED. RAMP. 10 18.0' `• / ENCLOSURE. APPROX. AREA OF PAVING: 12,880 SF (29.8%) O PROPOSED CLEAN OUTS ;•� PROPOSED ELECTRICAL a ♦• I I '• / / APPROX AREA OF SIDEWALKS:1,883 SF (4.3%) TRANSFORMER & 7'X7' PAD O 1 PROPOSED ELECTRIC METER _ .. w / / LANDSCAPING (-REMAINING):19,878 SF (46%) III I ..i. .... •. ••. 3 PROPOSED LIGHT POLE . �' ,5:0'• '•Y :.'t":. L.. •.r�7.0'•� 'y ":� . `� :i'. // • 6•: / BUILDING SUMMARY: APPROXIMATE LOCATION OF EXISTING " WATER SERVICE. , ANDI o ' 80' CONK. !' ' / �j PHASE 1 BUILDING: LOCATION PRIOR TO CONSTRUCTION. SAW-CUT, REMOVE, AND WALK 3 'v'.I ., / PROPOSED 7-FT TOTAL GROSS BLDG: 5,180 SF REPLACE EXISTING ASPHALT AND CURB & GUTTER. REMOVE .r 44.9'' PROPOSED GAS METER :, PROPOSED SIDEWALK CHASE. / WIDE SIDEWALK GARAGE: 1,352 SF SERVICE LINE AND CAP AT THE EXISTING MAIN. ,16,11,1:��.I•• ,r°_' ' r SF I e / CORRIDOR: BR K: .,.16.0' D PROPOSED 2.25-FT s /� I 'III . ••��;.� SIF PROPOSED CLEAN OUT . • o RESTROOM/BREAK: AREA: : ♦ •�t� ,t WIDE CONC. CHANNEL / PROPOSED BIKE RACK NET/OFFICE FLOOR AREA: 2,785 SF EXCAVATE TO NATIVE GRAVEL. FILL / / /r /"// PHASE 2 BUILDING: TAP EXISTING WATER MAIN. - / TO POND BOTTOM WITH COBBLES. a ...11llll APPROX. TOTAL GROSS BLDG: 3,441 SF / PROPOSED k / PROPOSED RED. RAMP I I I III I _ _=__ I APPROX. NET/OFFICE FLOOR AREA (85% GROSS): 2,925 SF / DETENTION PROPOSED 1" COPPER TYPE K DOMESTIC SERVICE. 3.0' SIDE AND REAR I 3 / / OVERALL: \ POND PROPOSED BUILDING / i w/ TOTAL GROSS BLDG: 8,621 SF LOT ZONING SETBACK FUTURE PHASE FOOTPRINT NET OFFICE FLOOR AREA: 5,710 SF ( ) / VAN ACCESSIBLE PARKING SIGN. 3-12" DUAL �� ��� 3,440 SF AS SHOWN a / WALL HDPE PROPOSED 8" SDR 35 PVC OR A-2000 PVC \I / / UTILITY CONDUITS STORM DRAIN. MAINTAIN 1% MIN. GRADE., \PROPOSED / / / ZONING DISTRICT: M-2 III -- -SNOW * r // STRUCTURE SETBACKS: APPROX. LOCATION OF �� STORAGE���� '8.53' OF 12" STORM DRAIN @ 0.50%21 / FRONT SETBACK: 20-FT i 1" CURB STOP / START INV. = 4728.50 / 30.0' WIDE UTILITY & I / PROPOSED IRRIGATION WELL SIDE AND REAR SETBACK: 3-FT i \\\ INSTALL FETE / EX. OVERHEAD / DRAINAGE EASEMENT \\ POWER TO BE BLOCK FRONTAGE SETBACK: 10-FT PROPOSED 3-FT WIDE DROP ,�< ,• / / RELOCATED I CURB AND CONC. APRON. �°?\ / BLOCK FRONTAGE: NIKLES DRIVE (COB PUBLIC STREET - LOCAL CLASSIFICATION): OTHER 36" STORM OUTLET STRUCTURE/ EVERGREEN DRIVE PRIVATE STREET W PUBLIC ACCESS: OTHER a 3 / 2.77' OF 12" STORM DRAIN 0 1.00%J r // ( / ) - -dHo dHo Q-dHo d END INV. = 4728.97 RIM: :47273 dHo SUMP:4727.71 \ / REQUIRED PARKING: �d INSTALL FETS INV IN:472&46 12" \\ dHo / / OFFICE PARKING: 1 SPACE PER 250 SQUARE FEET OF NET FLOOR AREA -dHo�dHo� INV OUT:4729.00 12" \�� PHASE 1: - - dHo�dHo / NET/OFFICE FLOOR AREA = 2,785 SF �dHo�dHo� o \o QUIRED BICYCLERED : 2,785 PAR PARKING: = 11 SPACES REQUIRED RE dHo dHo / PHASE 2: LOT 15 / / ASSUMED NET/OFFICE FLOOR AREA a 2,925 SF / REQUIRED PARKING: 2,925 SF/250 SF/SPACE = 11 SPACES REQUIRED LOT 2A REQUIRED BICYCLE PARKING: 10% = 2 STALLS / TOTAL: NET/OFFICE FLOOR AREA = 5,710 SF / b REQUIRED PARKING = 22 SPACES REQUIRED / REQUIRED BICYCLE PARKING = 4 STALLS REVISIONS: / 1. PHASE 1 WATER SERVICE SHIFTED FURTHER WEST. // PARKING PROVIDED: 2. CURB STOPS NOW SHOWN AT STANDARD LOCATION OF 8-FT PAST PROPERTY LINE. / TOTAL: 3. ADDITIONAL PEDESTRIAN RAMP SHOWN AT TERMINUS OF THE PROPOSED NIKLES DRIVE SIDEWALK. / SURFACE PARKING: 26 STALLS (INCLUDING 2 ACCESSIBLE PARKING STALLS) 4. PROPOSED IRRIGATION WELL NOW SHOWN NORTH OF THE PROPOSED STORM POND. / BICYCLE PARKING: 10 STALLS 5. PROPOSED FENCING NOW SHOWN ALONG EAST EDGE OF PARKING LOT. // ALL SURFACE PARKING TO BE CONSTRUCTED DURING PHASE 1 IMPROVEMENTS.2 6. ADDED DIMENSION LABELS: / 6.1. LENGTH OF PROPOSED DRIVEWAY TO GARAGE / 6.2. LENGTH OF PARKING LOT ALONG THE EVERGREEN FRONTAGE / 6.3. WIDTH/DEPTH OF LANDSCAPE BUFFER LOCATED ON SITE / 3i NO. REVISIONS DRAWN BY DATE 0 20 40 60 PROJECT #: 21-076 SHEET 1 AS OUTLINED IN NOTES ABOVE MCG 5/09/20H STI L,LWA7[°ER HOSPICE 32 DISCOVERY DRIVE DATE: �11/23/2021 BOZEMAN,MT 59718 Civil Engineering }� DESIGN PLAN g g DESIGN PLAN �Y.� SCALE (FEET) PHONE(408)582-0221 GeotechnicalEn ineerin ALL FAX(406)582-5770 Land Surveying EN6INEERINR PROJECT ENGINEER: RSR DRAWN BY: MCG ���Ta �1yT ,rp�T.���T 7a w alliedengineering.mm sExxnc�,urc. y STIILLWATER HOSPICE DESIGNED BY: RSR, MCG REVIEWED BY: RSR ..LL.. AN, ``�OJ�11a�1 ll�A ° „5ep„1e�"�o DESIGN PLAN