Loading...
HomeMy WebLinkAbout003NarrativeCivil  ●  Geotechnical  ●  Water Resources  ●  Land Surveying  ●  Construction Services     Corporate Office   32 Discovery Dr.  Bozeman, MT 59718  Ph: (406) 582‐0221      www.alliedengineering.com  DUNS: 00‐769‐3724  CAGE: IGHU7      November 23, 2021    Susana Montana, Senior Planner  20 East Olive Street  Bozeman, MT 59715  Phone: 406‐582‐2260  Email: smontana@bozeman.net    RE: Nikles Business Park – Lot 3A of Amended McChesney Industrial Park Subdivision   Master Site Plan Application    Dear Susana:    The subject property is located at the southwest corner of the intersection of Nikles Drive and Evergreen  Drive. The proposed site improvements will involve construction of two office buildings to be completed  in two phases. A Concept review application has been previously submitted and comments provided  (project number 21263).    The Phase 1 Site Plan and Master Site Plan applications will be submitted concurrently. A separate site  plan application will be submitted for the Phase 2 development at the time of development. Development  of the second structure is anticipated within the next few years but will depend on market demands and  other related factors. Please see below for our project narrative and additional information related to  project phasing.    Project Narrative:  The proposed site improvements involve the construction of two office buildings. The site is currently  undeveloped. The improvements are anticipated to be completed in two phases. The first office building  will be constructed near the intersection of Nikles Drive and Evergreen Drive and is intended to provide  office space for Stillwater Hospice. The second structure is set back further in the site and is planned for  permitting and construction within the next few years but will depend upon securing a lease tenant.    Phasing:  The proposed phase 1 improvements include the construction of the parking lot/driveway accesses, the  phase 1 building, sidewalks, and stormwater pond. In general, the only portion of work not completed as  part of the first phase of construction would be the row of parking adjacent to the future phase 2 building  and the future building itself. The proposed sidewalk shown along the front side of the phase 2 building  will be installed as part of the phase 1 improvements to allow access to the dumper encloser. Demolition  may be required for a portion of the sidewalk depending on the sidewalk grades and finished floor  elevation of the phase 2 building.     Structures/Parking:  The two proposed buildings will be used for offices. The phase 1 building (located near the intersection of  Nikles and Evergreen) is approximately 5,180 SF and will provide office space for Stillwater Hospice. The  Nikles Business Park – Lot 3A of Amended McChesney Industrial  Park Subdivision  Master Site Plan Application  Proj. 21‐076  November 23, 2021      Bozeman Office:  32 Discovery Drive.  Bozeman, Montana 59718.  ●  Ph: (406) 582‐0221  ●  Fax: (406) 582‐5770     Page 2    phase 2 building is currently shown at 3,441 SF. The phase 1 parking improvements will include 15 stalls  (including 1 ADA space), the required minimum is 11. The phase 2 parking improvements will include an  additional 11 stalls (including 1 ADA space) for a total of 26 parking stalls upon full buildout. The total  number of parking spaces required will depend on the area of the second structure. Parking calculations  are provided with the attached plans.    Stormwater:  The stormwater pond and collection/conveyance infrastructure are designed to provide capacity for both  phases of development. Improvements related to phase 2 of the development (building size and parking  configuration) were assumed for stormwater calculations and are approximate. The stormwater  infrastructure will be reevaluated for capacity requirements when the phase 2 development occurs;  however, we do not anticipate significant changes from the current layout.     Utilities:  We anticipate that the water and sewer services for both the phase 1 and phase 2 buildings will be  extended as part of the phase 1 improvements to avoid cutting the parking improvements associated with  phase 1.      Following the approval of the master site plan, sequential individual site plans for specific areas within the  master site plan will be submitted to the department. We acknowledge that each subsequent application  must be consistent with the approved master site plan and is subject to review criteria of Section  38.230.100.A, BMC. If subsequent site plan applications are not consistent with the approved master site  plan, a modification to the master site plan will be submitted.    Sincerely,    Allied Engineering Services, Inc.           Rory Romey, PE   Project Manager    Madeline Good, EI  Staff Engineer          enc: ‐Signed Development Review Application  ‐N1 Noticing Checklist  ‐Site Plans       P:\2021\21‐076 Stillwater Hospice\04 Permitting & Entitlements\Departure\Departure Narrative.docx