HomeMy WebLinkAboutMP.1MechanicalSchedulesCODES AND REQUIREMENTS
A. COMPLY WITH ALL CURRENT STATE AND LOCAL BUILDING CODES AND
APPLICABLE SMACNA MANUALS AND ASHRAE STANDARDS.
B. COORDINATE: ALL WORK WITH OTHER TRADES. NO ADDITIONAL
COMPENSATION OR TIME SHALL BE GRANTED DUE TO LACK OF
COORDINATION.
C. DRAWINGS ARE DIAGRAMMATIC IN NATURE. TAKE ALL DIMENSIONS
FROM ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT DRAWINGS,
AND FROM THE STRUCTURE ITSEF BEFORE FABRICATING ANY WORK.
D. PROVIDE ALL CORE DRILLING, CHANNELING, CUTTING, PATCHING,
TRENCHING AND BACKFILL AS REQUIRED FOR INSTALLATION OF
MECHANICAL EQUIPMENT. SEAL HOLES, FIREPROOFING WHERE
NECESSARY, AND REFINISH ALL REPAIR WORK TO ORIGINAL CONDITION
WHERE DAMAGED BY MECHANICAL WORK. USE ONLY APPROVED
FIREPROOF MATERIALS WHERE FIREPROOF SEALING IS REQUIRED.
REFER TO ARCHITECTURAL PLANS FOR WALLS, FLOORS, AND CEILINGS
IDENTIFIED AS FIRE BARRIERS.
E. OBTAIN ALL PERMITS AND APPROVALS REQUIRED FOR THE EXECUTION
OF THE WORK.
F. PROVIDE ONE SET OF "AS-BUILT" PLANS AND SPECIFICATIONS
CORRECTED UP-TO- DATE AS JOB PROGRESSES. PROVIDE OPERATION
AND MAINTENANCE MANUALS FOR ALL EQUIPMENT PROVIDED FOR THIS
PROJECT.
FLUSHING AND CLEANING
A. CLEAN AND FLUSH ALL PIPING SYSTEMS PRIOR TO PLACING IN
SERVICE. PROVIDE TEMPORARY CONNECTIONS, VALVES, ETC.,
REQUIRED FOR THIS PURPOSE.
B. AFTER FLUSHING, STERILIZE THE DOMESTIC WATER SYSTEM IN
ACCORDANCE WITH AWWA STANDARD C651-86, AFTER MINIMUM
CONTACT PERIOD, FLUSH THE SYSTEM WITH CLEAN WATER UNTIL THE
RESIDUAL CHLORINE IS NO GREATER THAN THE CITY WATER. PROVIDE
A TEST ANALYSIS BY THE STATE HEALTH DEPARTMENT OF A RANDOM
WATER SAMPLE, IF SAMPLE IS NOT ACCEPTABLE, RE-CLEAN AND RE-
TEST.
SHOP DRAWINGS
A. SUBMIT ONE HARD COPY SET OF SHOP DRAWINGS AND ONE
ELECTRONIC SET OF SHOP DRAWINGS OF ALL EQUIPMENT TO BE USED
ON THIS PROJECT TO GC.
OPERATION AND MAINTENANCE MANUALS
A. UPON PROJECT COMPLETION PREPARE AND SUBMIT TWO COMPLETE
HARD COPY SETS AND ONE COMPLETE ELECTRONIC SET OF
OPERATION MANUALS. OPERATION AND MAINTENANCE MANUALS SHALL
CONTAIN ALL INFORMATION NECESSARY TO MAINTAIN, SERVICE,
REPAIR, OR REPLACE ALL EQUIPMENT USED ON THIS PROJECT.
INCLUDE ALL NECESSARY INFORMATION TO SET AND PROGAM
THERMOSTATS OR OTHER USER PROGRAMMABLE DEVICES. HARD
COPIES SHALL BE BOUND IN 3 RING BINDERS OF SUFFICIENT SIZE TO
CONTAIN ALL INFORMATON. ON INSIDE COVER, PROVIDE PROJECT
INFORMATION, GENERAL CONTRACTOR NAME AND CONTACT PHONE
NUMBER AND E-MAIL, AND SUBCONTRACTOR NAME AND CONTACT
PHONE NUMBER AND CONTACT INFORMATION.
SERVICE AND MAINTENANCE
A. LOCATE AND INSTALL ALL EQUIPMENT TO FACILITATE MAINTENANCE,
SERVICE, REPAIR, AND REPLACEMENT OF EQUIPMENT OR
COMPONENTS. EXTEND GREASE FITTINGS FOR EASE OF MAINTENANCE.
ENSURE FILTER ACCESSIBILITY AND REPLACEMENT CLEARANCES ARE
ADEQUATE. ENSURE COIL REPLACEMENT CLEARANCES ARE
ADEQUATE.
EQUIPMENT AND PIPE IDENTIFICATION
A. PROVIDE EQUIPMENT IDENTIFICATION TAGS WITH IDENTIFICATION AS
SHOWN ON EQUIPMENT SCHEDULES. TAGS SHALL BE PERMENANTLY
AFFIXED ENGRAVED PLASTIC OR PHENOLIC WITH 1" LETTERING.
B. PROVIDE PIPING IDENTIFICATION LABELS SHOWING SERVICE AS
INDICATED ON PLANS AND FLOW DIRECTIONS. LOCATE LABELS AT 5 FT
INTERVALS IN MECHANICAL ROOMS AND 10 FT INTERVALS ELSEWHERE.
VIBRATION ISOLATION
A. ALL MOTOR DRIVEN EQUIPMENT SHALL BE SUPPLIED WITH VIBRATION
ISOLATION HANGERS OR SUPPORTS. ALL DUCTWORK CONNECTIONS
TO MOTOR DRIVEN EQUIPMENT SHALL HAVE FLEXIBLE CONNECTIONS.
ALL PIPING CONNECTING TO BASE MOUNTED PIPES SHALL HAVE
STAINLESS STEEL FLEXIBLE CONNECTORS.
DUCT WORK
A. DUCTWORK AND FITTINGS
1. ALL DUCTWORK SHALL BE G-90 GALVANIZED STEEL WITH LOCKING
TYPE SEAMS.
2. CONSTRUCT ALL HVAC DUCTWORK PER SMACNA HVAC DUCT
CONSTRUCTION STANDARDS-METAL AND FLEXIBLE, THIRD EDITION.
3. INSTALL DUCTWORK AS SHOWN ON DRAWINGS TIGHT TO
STRUCTURE AND PARALLEL AND PERPENDICULAR TO BUILDING
STRUCTURE EXCEPT AS NOTED. CONSTRUCT AND INSTALL DUCT
HANGERS PER SMACNA STANDARDS. COORDINATE WITH OTHER
TRADES.
4. SEAL ALL HVAC DUCTWORK TO CLASS C SEALING STANDARDS
(TRANSVERSE JOINTS).
5. DUCT SIZES SHOWN ON DRAWING ARE INSIDE CLEAR FINISHED
DIMENSIONS.
6. PROVIDE FLEXIBLE CONNECTION AT ALL FANS AND AIR HANDLING
UNITS. FLEXIBLE CONNECTON ARE NOT REQIRED AT EQUIPMENT
WITH INTERNAL VIBRATION ISOLATION.
7. FLEXIBLE DUCT SHALL BE LIMITED TO A MAXIMUM LENGTH OF 6
FEET. NO FLEX DUCT IS ALLOWED IN APARTMENT CEILING CAVITIES.
8. INSULATE ALL INTERIOR SUPPLY DUCTWORK WITH 1-1/2" JACKETED
BLANKET INSULATION WITH TAPED SEAMS. INSULATE ALL EXTERIOR
DUCTWORK WITH 2" RIGID INSULATION WITH SHEET METAL OR PVC
COVERING. INSULATION MATERIAL SHALL COMPLY WITH NFPA
FLAME SPREAD AND SMOKE DEVELOPMENT STANDARDS.
9. DUCT ACCESS AND INSPECTION DOORS SHALL BE DOUBLE WALL
INSULATED WITH HINGE AND CAM LOCK CLOSURES. PROVIDE
ACCESS DOOR AT EACH FIRE DAMPER AND AT OTHER EQUIPMENT
INSIDE DUCTS REQUIRING ACCESS.
10. FIRE DAMPERS SHALL BE INSTALLED IN ACCORDANCE WITH
DRAWING DETAILS AND MANUFACTURER'S INSTALLATION
INSTRUCTIONS.
11. RECTANGULAR DUCT SHALL HAVE TURNING VANES ON ALL SQUARE
ELBOWS.
12. RECTANGULAR DUCT SHALL HAVE CENTERLINE DUCT RADIUS EQUAL
TO DUCT WIDTH ON ALL RADIUS ELBOWS.
13. ROUND DUCT SHALL HAVE CENTERLINE DUCT RADIUS EQUAL TO
DUCT DIAMETER. SQUARE ELBOWS ARE NOT PERMITED ON ROUND
DUCT.
14. FIRE DAMPERS- 1-1/2 HR FIRE RATING WITH SLEEVE WHERE
CONSTRUCTION FIRE RATING REQUIRES TO MEET NFPA 90A
REQUIREMENTS.
15. DUCT SEALANT- NON-HARDENING, WATER RESISTANT, NON
COMBUSTIBLE, LIQUID OR MASTIC. ALL SEALANTS SHALL HAVE
APPROVED FIRE RATING FOR PLENUM APPLICATION AS REQUIRED
BY CODE AUTHORITY.
16. THE BALANCING OF THE SYSTEM SHALL BE PART OF THIS
CONTRACT, INCLUDE IN BID THE COST OF BALANCING AND
ADJUSTING. THE AIR QUANTITIES LISTED AND A WRTTEN REPORT
SHALL BE SUBMITTED TO THE ENGINEER.
EQUIPMENT
A. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, ACCESSORIES,
AND INCIDENTALS NECESSARY WHETHER SPECIFICALLY STATED OR
NOT TO MAKE THE REQUIRED MECHANICAL SYSTEMS COMPLETE AND
OPERATIONAL.
B. THE EQUIPMENT SCHEDULES PROVIDE MANUFACTURER AND MODEL
NUMBER. OTHER EQUIPMENT MAY BE USED IF EQUAL AND APPROVED
BY ENGINEER WITH A WRITTEN PRIOR APPROVAL.
PLUMBING FIXTURES
A. PROVIDE PLUMBING FIXTURES AS INDICATED ON THE PLUMBING
FIXTURE SCHEDULE. PROVIDE TRAPS, STOPS, ESCUTCHEONS,
SEALANTS, GASKETS, CAULKING, ETC. FOR COMPLETE INSTALLATION.
PIPE AND DUCTWORK PENETRATIONS
A. WHERE HORIZONTAL DUCTS AND PIPE PASS THROUGH WALLS, AND
VERTICAL DUCTS AND PIPES PASS THROUGH FLOORING OR ROOFS
SEAL OFF VOID BETWEEN OPENING AND DUCT, OR PIPE AND SLEEVE.
ALL PENETRATIONS OF EXTERIOR WALL BELOW GRADE SHALL BE
SEALED WATERTIGHT. ALL PENETRATIONS FOR EXTERIOR WALLS
ABOVE GRADE SHALL BE SEALED WEATHER TIGHT.
B. WHEREVER ANY PIPE, CONDUIT, STEEL MEMBER, BRACKET, EQUIPMENT
OR OTHER MATERIAL PENETRATES OR PASSES THROUGH FIRE
RESISTANT WALL, CEILING OR FLOOR, COMPLETELY SEAL VOIDS IN
CONSTRUCTION WITH NON-HARDENING CAULK OR OTHER FIRE
RESISTANT MATERIAL AS APPROVED BY ALL AUTHORITIES HAVING
JURISDICTION. EMBED SEALING MATERIAL FULL THICKNESS OF
MATERIAL BEING PENETRATED. SEALANT USED AT PENETRATIONS OF
ITEMS WHICH CAN BE CONSUMED IN A FIRE SHALL BE INTUMESCENT
AND SHALL BE INSTALLED SO AS TO FILL THE VOID LEFT IF PENETRANT
IS CONSUMED. SEALANTS TO BE INSTALLED IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS AND SHALL HAVE BEEN TESTED IN
ACCORDANCE WITH ASTM E-814.
MOTORS AND STARTERS
A. MOTORS SHALL INCLUDED THERMAL OVERLOAD PROTECTION.
B. PROVIDE STARTERS OF CURRENT AND CAPACITY RATINGS TO SERVE
THE MOTOR INTENDED.
C. UNLESS OTHERWISE INDICATED, ALL DISCONNECTS SHALL BE
PROVIDED BY ELECTRICAL CONTRACTOR.
D. DISCONNECTS SHALL COMPLY WITH CURRENT ELECTRICAL CODES.
INSULATION
A. ALL INSULATION AND INSULATING MATERIALS SHALL BE TESTED IN
ACCORDANCE WITH ASTM 84 FOR A FLAME SPREAD RATING OF 25 OR
LESS AND A SMOKE DEVELOPMENT RATING OF 50 OR LESS. ALL COLD
WATER AND ROOF DRAIN PIPING SHALL HAVE A VAPOR BARRIER.
COVER ALL EXPOSED INSULATION WITH MASTIC.
PIPE INSULATION
A. PROVIDE JACKETED FIBERGLASS INSULATION.
1. ROOF DRAIN AND COLD WATER PIPING 1" WITH VAPOR BARRIER
2. DOMESTIC HOT WATER AND RECIRC PIPING 1"
3. HEATING WATER SUPPLY AND RETURN PIPING 1-1/2"
B. PROVIDE CLOSED CELL FLEXIBLE ELASTOMERIC COMPLYING WITH
ASTM C 534
1. REFRIGERATION SUCTION 1"
DUCT INSULATION
A. EXTERIOR SUPPLY AND RETURN DUCTS, 2" RIGID CLOSES CELL FOAM
INSULATION (BLUE BOARD) WITH METAL OR PVC COVERINGS.
DOMESTIC WATER PIPING AND PLUMBING SYSTEMS
A. ABOVE GROUND DOMESTIC WATER SUPPLY PIPING SHALL BE TYPE "L"
COPPER WITH SOLDER JOINED FITTINGS OR MECHANICALLY FORMED
JOINTS. SOLDER TO BE 95/5 TIN/ANTIMONY COMPOSITION. SELF-
FLUXING SOLDER IS NOT ACCEPTABLE. BELOW GRADE DOMESTICE
WATER PIPING SHALL BE TYPE K SOFT COPPER WITH NO JOINTS.
B. VALVES: LEAD FREE BRONZE CLASS 125 BALL. INSTALL DIELECTRIC
CONNECTIONS BETWEEN DISSIMILAR METALS.
C. TEST ALL PIPING IN ACCORDANCE WITH UPC REQUIREMENTS. REPAIR
LEAKS AND RE-TEST.
WASTE VENT AND STORM DRAIN PLUMBING SYSTEMS
A. WASTE, VENT AND ROOF DRAIN LEADER PIPING SHALL BE AS
APPROVED BY LOCAL CODES AND SHALL BE SCHEDULE 40 PVC SOLID CORE
PLASTIC TYPE DWV PIPE AND FITTINGS WITH SOLVENT WELD JOINTS.
B. SLOPE WASTE PIPING AT ¼" PER FOOT. 1/8" PER FOOT ALLOWED ONLY
WHERE INDICATED ON DRAWINGS.
C. ALL FIXTURES SHALL BE VENTED. HORIZONTAL VENTS SHALL BE
SLOPED AT NOT LESS THAN 1/8" PER FOOT TOWARDS DRAIN.
D. ISOLATE AND TEST ALL WASTE AND VENT PIPING PER UPC
REQUIREMENTS. REPAIR LEAKS AND RE-TEST.
HIGH EFFICIENCY APPLIANCE COMBUSTION AIR AND VENT PIPING
A. MATERIAL, SIZE, LENGTH, SLOPE, AND TERMINATIONS PER MANUFACTURER'S
INSTALLATION INSTRUCTIONS. CONCENTRIC VENTS KITS SHALL BE PROVIDED
BY APPLIANCE MANUFACTURER.
NATURAL GAS PIPING
A.PIPING SHALL BE SCHEDULE 40 ASTM A-120 BLACK STEEL. INSTALL PER
IFGC AND NFPA 54.
B.FITTINGS UP THROUGH 2" PIPE SHALL BE THREADED OR PRESS FIT
WITH APPROVED FITTINGS AND TOOLS. FITTINGS 2-1/2"
AND LARGER SHALL BE BUTT WELDED OR SOCKET WELDED OR PRESS FIT
WITH APPROVED FITTINGS AND TOOLS.
C.PROVIDE DIRT LEG, SHUT OFF COCK AND UNION OR STAINLESS FLEX
CONNECTOR ON ALL APPLIANCE CONNECTIONS.
D.INSPECT, TEST, AND PURGE ALL GAS PIPING IN ACCORDANCE WITH
REQUIREMENTS OF IFGC.
MEDICAL GAS PIPING
ALL MEDICAL GAS PIPING AND EQUIPMENT SHALL CONFORM TO NFPA 99
CATEGORY 3 DENTAL GAS AND VACUUM SYSTEMS.
HYDRONIC AND REFRIGERANT PIPING SYSTEMS
A. HEATING WATER SUPPLY AND RETURN PIPING
1. TYPE L COPPER WITH SOLDER OR MECHANICALLY FORMED JOINTS
OR SCHEDULE 40 STEEL WITH APPROVED MECHANICAL JOINING
SYSTEM.
B. REFRIGERATION PIPING
1. ACR GRADE PER ASTM B280 COPPER, CLEANED DEHYDRATED AND
CAPPED AT THE FACTORY.
C. VALVES AND SPECIALTIES
BUTTERFLY VALVES: DUCTILE IRON
BALL VALVES: BRONZE, FULL PORT
CHECK VALVES: BRONZE
STRAINERS: CAST IRON "Y" TYPE
BALANCE VALVES: MANUAL- TACO ACCUFLO OR EQUAL,
AUTO- FLOW DESIGN OR EQUAL WITH
CARTRIDGE TO MATCH FLOW INDICATED.
SPECIFICATIONS
WARRANTY
CONTRACTOR SHALL GUARANTEE THAT ALL WORK WILL BE FREE
FROM DEFECTS OF MATERIALS AND WORKMANSHIP FOR A
PERIOD OF ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE .
CONTRACTOR SHALL FURTHER GUARANTEE THAT HE WILL
REPLACE OR REPAIR ALL DEFECTIVE EQUIPMENT AND
INSTALLATIONS THAT BECOME DEFECTIVE DURING THE TERM OF
THE WARRANTY. THIS DOES NOT INCLUDE EXCESSIVE ABUSE OR
DAMAGE INFLICTED BY THE OWNER AND/OR OTHERS.
FIRE PROTECTION
BUILDING DOES NOT HAVE A FIRE SPRINKLER SYSTEM.
LEGENDS
VENTILATION CALCULATIONS
PER 2018 IMC TABLE 403
Vbz=RpPz+RaAz:
Rp=People Outdoor Air Rate (cfm), Pz=Zone Population (people). Ra=Area Ouotdoor Rate (cfm), Az=Zone Floor Area (sq ft)
OFFICE
Rp = 5 CFM/Person
Pz = 5 PEOPLE/1000 S.F. = 4
Ra = 0.06 CFM/sf
Az = 683 sf
Vbz = (5)(4) + (0.06)(683) = 61 CFM
CEILING SUPPLY/RETURN MULTIPLIER: 0.80
RTU-2
CONFERENCE
Rp = 5 CFM/Person
Pz = 50 PEOPLE/1000 S.F. = 19
Ra = 0.06 CFM/sf
Az = 378 sf
Vbz = (5)(19) + (0.06)(378) = 118 CFM
CEILING SUPPLY/RETURN MULTIPLIER: 0.80
MP-1
DIFFUSER/REGISTER/GRILLE SCHEDULE
S-1
PLAN
CODE MFGR MODEL
SHOEMAKER 700MA
SIZE
(INXIN)MATERIAL INTEGRAL
DAMPER
NOTES
STEEL 1.2.
NOTES:
1. COLOR SELECTED BY ARCHITECT.
2. SEE PLANS FOR NECK SIZES.
TYPE
CEILING DIFFUSER - LAY-IN NO24X24
S-2 1.3.SPIRAL DUCT DIFFUSER NO12X12
R-1 105P 1..24X24RETURN GRILLE
E-1 915 1.2.EXHAUST GRILLE 16X16
TG-1 105P 1..24X24RETURN AIR TRANSFER GRILLE
SHOEMAKER
SHOEMAKER
SHOEMAKER
NO
NO
NO
STEEL
ALUMINUM
STEEL
STEEL
RTU SCHEDULE
PLAN
CODE MFGR MODEL
AIRFLOW
(CFM)SERVICE
GROSS
COOLING
(BTUH)
FAN
HP NOTES
POWER
V/HZ/PH
NOTES:
1. DRY BULB ECONOMIZER 2. COIL GUARDS 3. 18" DOWNFLOW CURB 4. FILTER RACK 5. OUTSIDE AIR DAMPER
CONFIGURATION
INPUT
HEATING
(BTUH)
ESP
(IN W.C.)
HEATING
STAGES
COOLING
CIRCUITS
EER/
SEER
MCA/
MOP
UNIT
WEIGHT
(LBS)
FILTERSDRIVE
OUTSIDE
AIR
(CFM/%)
FUEL
RTU-2 MAIN FLOOR 1943 208-230/60/11 1. 2. 3. 4. 5.TRANE DOWNFLOW 1150000.4 1 MERV 8DIRECTSEER
14 NG
TOTAL OUTSIDE AIR FOR RTU-2: 223 CFM
E. SEQUENCES OF OPERATION
RTU-1 AND -2 - 7 DAY PROGRAMMABLE THERMOSTATS CONTROL HEATING AND COOLING
SET POINTS IN EACH ZONE BY MODULATING ZONE DAMPERS VIA THE
ZONE CONTROL PANEL. ZONE CONTROLLER DETERMINES HEAT/COOL
OPERATION BASED ON ZONE DEMAND ALGORITHM.
ADJUST OCCUPIED/UNOCCUPIED SCHEDULES ACCORDING TO BUSINESS
HOURS AND OWNER PREFERENCES.
RETURN AIR SMOKE DETECTOR SHUTS DOWN UNIT AND SENDS SIGNAL TO
ANNUNCIATOR IN OCCUPIED SPACE UPON SMOKE DETECTION.
EF-1 AND -2 - FAN TURNS ON WITH LIGHT SWITCH. BUILT IN OFF TIME DELAY SHUTS
FAN OFF.
EF-3 - SWITCH ON WALL ENABLES FAN.
UH-1 - 24V THERMOSTAT ENABLES UNIT ON A CALL FOR HEAT.
BB-1, BB-2 - LINE VOLTAGE THERMOSTAT ENABLES BOTH BB-1 AND BB-2 ON A CALL FOR HEAT.
HVAC CONTROLS
A. PROVIDE ALL THERMOSTATS, CONTROLLERS, SENSORS, ACTUATORS,
AND INCIDENTAL EQUIPMENT FOR A COMPLETE
AND OPERATIONAL SYSTEM.
B. ZONE THERMOSTATS SHALL BE SHALL BE 24V 7 DAY PROGRAMMABLE
WITH SPACE SET POINTS, AUTO SWITCH OVER FROM HEATING TO COOLING,
OCCUPIED/UNOCCUPIED SCHEDULES, FAN ON/OFF/AUTO
C. ZONE CONTROL PANEL SHALL BE iO HVAC CONTROLS 3 ZONE 2H/2C OR EQUAL AND
BUILT IN STATIC PRESSURE CONTROL TO ELIMINATE BYPASS. ZONE DAMPERS SHALL BE
3 WIRE MD SERIES TO BE COMPATIBLE WITH CONTROL PANEL. PROVIDE PROGRAMMING
AND TECHNICAL ASSISTANCE FOR ALL START UP AND COMMISSIONING ACTIVITIES.
D. RTU'S FIRST STAGE COOLING SHALL BE VIA DRY BULB ECONOMIZER.
EXHAUST FAN SCHEDULE
EF-1
PLAN
CODE MFGR MODEL
AIRFLOW
(CFM)SERVICE
ESP
(IN W.C.)
FAN
HP/WATTS NOTES
POWER
V/HZ/PH
NOTES:
1. FAN SPEED CONTROLLER
2. INTERLOCK FAN WITH LIGHTS
3. SWITCH ON WALL.
EF-2
EF-3 GARAGE EXHAUST 975 0.25 115/60/11/2 HP 1. 3.LOREN COOK 120C17DEC
RTU-1 MAIN FLOOR 1943 60000 208-230/60/11 1. 2. 3. 4. 5.TRANE 4YCC4060A1115A DOWNFLOW 1150000.4 1 1 39.1/60 586 MERV 8DIRECTSEER
14291/15%NG
TOILET 100 0.25 115/60/17.9 WATTS 1. 2.PANASONIC FV-0511VKS2
TOILET 100 0.25 115/60/17.9 WATTS 1. 2.PANASONIC FV-0511VKS2
RTU-1
OFFICE
Rp = 5 CFM/Person
Pz = 5 PEOPLE/1000 S.F. = 14
Ra = 0.06 CFM/sf
Az = 2714 sf
Vbz = (5)(14) + (0.06)(2714) = 233 CFM
CEILING SUPPLY/RETURN MULTIPLIER: 0.80
TOTAL OUTSIDE AIR FOR RTU-1: 291 CFM
GARAGE
0.75 CFM PER SQ FT = 1300 X 0.75 = 975 CFM
UH-1 REZNOR UDZ NAT GAS 120/60/1 1
NOTESFUELPOWER
V/HZ/PH
NOTES
1.SEPARATED COMBUSTION. COMBUSTION AIR DUCTING REQUIRED.
UNIT HEATER SCHEDULE
PLAN
CODE MFGR MODEL
GARAGE
SERVICE
NOMINAL
HEATING
(BTUH)
75000
AMPS
4.3HORIZ.
TYPE
BB-1, BB-2 MARLEY 2500 208/60/1 1
NOTESPOWER
V/HZ/PH
NOTES
1.ONE LINE VOLTAGE THERMOSTAT CONTROLS BOTH BB-1 AND BB-2. THERMOSTAT BY EC.
ELECTRIC BASEBOARD HEATER SCHEDULE
PLAN
CODE MFGR MODEL
BONUS RM
SERVICE
NOMINAL
HEATING
(WATTS)
1500
AMPS
7.3BASEBOARD
TYPELENGTH
(IN)
96
4YCC4060A1115A 60000 1 39.1/60 586
SHOEMAKER
223/11%
S-3 937 1.2.FIXED BLADE SUPPLY GRILLE 14X6SHOEMAKER YESSTEEL
ARCHITECTS
STUDIO
CH
JC
-
COPYRIGHT 2019
THESE DOCUMENTS, IN PART OR IN WHOLE,
AND THE DESIGN THEY REPRESENT; ARE
THE SOLE PROPERTY OF STUDIO 4
ARCHITECTS. THESE DOCUMENTS ARE
INTENDED FOR THE PROJECT ON THE SITE
INDICATED. ANY USE, REPRODUCTION,
MODIFICATION, OR ADAPTATION WITHOUT
THE EXPRESS WRITTEN CONSENT OF
STUDIO 4 ARCHITECTS IS STRICTLY
PROHIBITED.
-
-
-
11-3-21
7-8-21
27 Shiloh Road
Suite 8
Billings, MT 59106
ph: 406.656.1714
fx: 406.656.1715
web:
studio4architects.com
Bozeman, Montana PROJECT:
C
DATES:
PRE:
CRS:
CHECKED BY:
DRAWN BY:
PROJECT NO.
SHEET:
REV:
REV:
CDS:
SET:Stillwater Hospice13524PE
S T A T E OF MONTANA
PROF
ESSI ONAL E N G IN EEREDRB
E
RGECD.YAJ