Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
E3.2ElectricalPlanSecondFloor
M J J J J T M M MJ LVR1OS OS P A1-28 EF-3 ON ROOF 1 BB-1 A1-40,42 HWH-1 A1-44,46 RTU-1 A1-48,50 RTU-2 A1-52,54 A1-32 WP GFI WP GFI 2 3 3 2 4 RCP-1 WP 201 ATTIC 5 BB-2 A1-40,42 6 7 6 A1-32 A1-32 A1-32 F2 A1-7 F2 A1-7 F2 A1-7 201 ATTIC 8 8 9 A1-7 EL1 GENERAL ELECTRICAL POWER & SYSTEMS NOTES A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS. B. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF THE ARCHITECT/ENGINEER. C. LOW VOLTAGE CABLES (LIGHTING CONTROLS) ABOVE ACCESSIBLE CEILINGS SHALL BE SUPPORTED USING J-HOOKS AT INTERVALS NOT TO EXCEED 48" OC, UNO. D. ANY MECHANICAL EQUIPMENT THAT DOES NOT HAVE A DISCONNECT SHOWN AT DEVICE ON PLAN IS PROVIDED W/ A FACTORY DISCONNECT. EC TO CONNECT TO DISCONNECT ELECTRICALLY COMPLETE, VIA THE CIRCUIT SHOWN ON PLAN. SEE MEP COORDINATION SCHEDULE ON E0.2 FOR ADDITIONAL DETAILS. E. ALL BUILDING EXTERIOR RECEPTACLES SHALL BE: GFI STYLE, WEATHER RESISTIVE CONSTRUCTION AND FEATURE A METALLIC WEATHERPROOF-IN- USE COVER THAT IS CAPABLE OF ACCEPTING A STANDARD HASP STYLE PADLOCK, AS WELL AS ANY ADDITIONAL FEATURES WHEN CALLED FOR ON PLANS. GENERAL ELECTRICAL LIGHTING NOTES A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS. B. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF THE ARCHITECT/ENGINEER. C. LOW VOLTAGE CABLES (LIGHTING CONTROLS) ABOVE ACCESSIBLE CEILINGS SHALL BE SUPPORTED USING J-HOOKS AT INTERVALS NOT TO EXCEED 48" OC, UNO. D. WHEN MULTIPLE OCCUPANCY SENSORS ARE LOCATED IN A SINGLE SPACE, CONNECT DEVICES TOGETHER SUCH THAT THE ACTIVATION OF ANY SENSOR TURNS ALL LIGHTS ON IN AN AREA. E. OCCUPANCY SENSORS INSTALLED IN CORRIDOR, CONFERENCE, DME (GARAGE) AND REST ROOM AREAS SHALL BE SET FOR A 20 MINUTE TIME OUT DELAY. OFFICES & BREAK ROOM SHALL BE SET FOR 15 MINUTE DELAY. F. PROVIDE AN UN-SWITCHED HOT TO ALL EGRESS LIGHTING UNITS, EMERGENCY BATTERY PACKS INTEGRAL TO FIXTURES & EXIT SIGNS LOCATED IN A SPECIFIC BUILDING AREA THAT IS SCOURED FROM THE SAME LIGHTING CIRCUIT WHICH SERVES LUMINARIES IN SPACE. WHEN CONTROL SOURCE IS FROM A CENTRAL LIGHTING CONTROL PANEL, HOT CONDUCTOR SHALL BE ROUTED AROUND THE CONTROLLING RELAY TO SERVE BATTERY PACK. G. CONFIGURE ALL OCCUPANCY SENSORS FOR MANUAL ON FUNCTION WITH THE EXCEPTION OF: BATHROOMS, HALLWAYS & VESTIBULES, WHICH SHALL BE AUTOMATIC ON. WHEN A SPACE IS ENTERED WITH MANUAL CONTROL THE LOCAL WALL SWITCH MUST BE ACTIVATED PRIOR TO LIGHTS ILLUMINATING. H. LIGHTING CONTROL METHODS VARY FROM INDIVIDUAL SPACES WITHIN PROJECT. SEE DETAILS ON e0.2 FOR OUTLINE APPLICATION OF CONTROLS. I. WHEN LIGHT SWITCHES ARE SHOWN LOCATED ON THE WALL THAT IS COMMON WITH THE END OF THE DOOR SWING INTO A SPACE. DO NOT LOCATE THE SWITCHES BEHIND THE DOOR, BUT RATHER A MINIMUM OF 6" FROM THE END OF THE SWING. VERIFY EXACT DOOR SWING PRIOR TO ROUGH-IN. J. ALL BUILDING MOUNTED EXTERIOR LIGHTING FIXTURES, WALL OF SOFFIT SHALL BE SERVED WITH CIRCUITRY CONSISTING OF #10 AWG CU CONDUCTORS IN ¾”C. PROVIDE DIMMING CONTROL CONDUCTORS FROM LCP TO ALL FIXTURES, WITH THE EXCEPTION OF THE E1 TYPE FIXTURES. ROUTE CIRCUIT THROUGH THE LIGHTING CONTROL PANEL PRIOR TO CONNECTING TO PANELBOARD LISTED. PROVIDE AN UN-SWITCHED HOT ROUTED AROUND RELAY FOR SERVING OF ALL FIXTURES EQUIPPED WITH AN EM BATTERY PACK. SEE e0.2 FOR ADDITIONAL DETAILS. K. SUBSCRIPT LOCATED NEXT TO/ IN THE BODY OF EACH LIGHT FIXTURE, WHEN PRESENT INDICATES THE RELAY GROUP IN LOCAL CONTROL PACK OR SWITCH THAT THE FIXTURES ARE ASSOCIATED WITH. MATCH SUBSCRIPTS FOR DESIRED SWITCHING CONTROL SCHEME. 315 North 25th Street, Suite 102 Billings, MT 59101 Phone: 406.656.6000 Project # 6804.001 COPYRIGHT © 2021 THESE DOCUMENTS, IN PART OR IN WHOLE, AND THE DESIGN THEY REPRESENT; ARE THE SOLE PROPERTY OF STUDIO 4 ARCHITECTS. THESE DOCUMENTS ARE INTENDED FOR THE PROJECT ON THE SITE INDICATED. ANY USE, REPRODUCTION, MODIFICATION, OR ADAPTATION WITHOUT THE EXPRESS WRITTEN CONSENT OF STUDIO 4 ARCHITECTS IS STRICTLY PROHIBITED. project: set: dates: sheet: PRE: CRS: CDS: REV: REV: PROJECT NO. DRAWN BY: CHECKED BY: 2-22-21 - - - 27 Shiloh Road Suite 8 Billings, MT 59106 ph: 406.656.1714 fx: 406.656.1715 web: studio4architects.com STUDIO ARCHITECTS 8-6-21 e3.2PRELIMINARY -NOT FOR CONSTRUCTIONTJ JK 2104Stillwater HospiceEvergreen DrivePLANBozeman, Mt1/4" = 1'-0"2 ELECTRICAL POWER AND SYSTEMS PLAN –ATTIC 1/4" = 1'-0"1 ELECTRICAL LIGHTING PLAN –ATTIC KEY NOTES:# NN 1 EC TO PROVIDE POWER CONNECTION FOR EXHAUST FAN THAT IS PROVIDED BY MC. EXHAUST FAN IS TO BE CONTROLLED VIA LIGHTING CONTROL IN GARAGE - DME 118. 2 LOCATE DISCONNECT ON RTU FOR BEST FIT WITHOUT IMPEDING ANY REQUIRED SERVICE ACCESS CLEARANCES OR POINTS. 3 MOUNT RECEPTACLE ON RTU FOR BEST FIT WITHOUT IMPEDING ANY REQUIRED SERVICE ACCESS POINTS. 4 PROPOSED LOCATION FOR HOT WATER HEATER, PROVIDED BY PLUMBING CONTRACTOR. EC TO VERIFY FINAL LOCATION OF UNIT PRIOR TO ROUGH-IN OF ANY SERVICES TO WATER HEATER OR SUPPORTING COMPONENTS. 5 EC TO ROUTE THE CIRCUIT SERVING THE HOT WATER RECIRCULATION PUMP, RCP-1 THROUGH AN AQUA STAT THAT IS FURNISHED AND INSTALLED BY PLUMBING CONTRACTOR ON PIPE SERVING PUMP. AQUA STAT WILL BE LOCATED WITH-IN 15’ OF THE PUMP. EC TO VERIFY EXACT LOCATION PRIOR TO ROUGH-IN. 6 BASEBOARD HEATER IS PROVIDED BY MC, WIRED COMPLETE BY EC. CONNECT HEATER TO THE LINE VOLTAGE THERMOSTAT FOR COMMON CONTROL OF ALL BASEBOARD HEATERS IN SPACE. EC TO VERIFY FINAL LOCATION FOR HEATERS WITH MC PRIOR TO ROUGH-IN. 7 LINE VOLTAGE THERMOSTAT, FURNISHED BY MC WIRED AND INSTALLED ELECTRICALLY COMPLETE BY EC. EC TO ROUTE THE CIRCUITRY SERVING BASEBOARD HEATERS, IN SPACE VIA T-STAT FOR CONTROL. REQUIRED TEMPERATURE SETTING FOR THERMOSTAT SHALL BE COORDINATED WITH MC. 8 PENDANT MOUNT THE OCCUPANCY SENSOR VIA IMC CONDUIT SUCH THAT THE FACE OF SENSOR IS FLUSH WITH THE UNDERSIDE OF LIGHT FIXTURES IN SPACE. 9 ROOF MOUNTED PHOTOCELL FOR INTERFACE WITH LIGHTING CONTROL PANEL. LOCATE DEVICE AT THE PEAK OF THE ROOF IN A WEATHERPROOF BACK BOX AND AIM IN A NORTH WEST DIRECTION.