Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
E2.1ElectricalLightingPlan
REFR.LVD LVD LVD LVD OSOSOSLVDLVDLVD OS OS OSOS OS OSOS OS OS OS OS OS OS LVDLVDOSLV OSLVD LVLV LV LVLV OS OS OS OS OS OS OSLV LVD LV R2 R2 R2 R2 R3 R2 R2 R2 R2 R3 R1 R1 LVR1OSR2 OS R2 LVD R1 OS LVDOSLVLVOSR1 LVD LVD R1 OS 118 DME 102 CONFERENCE 107 OFFICE 108 OFFICE 109 OFFICE 110 OFFICE 106 NURSE 111 MENS 112 WOMENS 114 OFFICE 115 OFFICE 113 STORAGE 116 OFFICE 101 RECEPTION 105 BREAK 103 COPY 104 MED ST 117 BEREAVEMENT B2 B2 B2B2 B2 B2 B2B2 B2 B2 B2B2 B2 B2 B2B2 D1 D1 G1 G1 B1E B1 B3 B2 B2 B2B2 B2 B2 B2B2 B2 B2 B2B2 B1B1EB1 B2E B1E B1E B1 B1E B1B1E B3 B3 B1 B1 B1 B1E B1B2 B1EB1E B1E B1 P1 P1 B2E B2 E10 E10 E1 E1 E1 E1 E1 E3E E10 E10 F1 F1 F1 F1 F1 F1 X1 X1 X1 X1 X1 X1 X1 X1 B1B1EB1 B1B1B1 E2E E2E S1 S1 S1 S1 EL1 EL1 A1-5 A1-5 A1-1 A1-1 A1-1 A1-1 A1-5 A1-1 A1-1 A1-1 A1-1A1-1 A1-5 A1-5 A1-1 A1-1 A1-1A1-1 A1-1 A1-1 A1-1 A1-1A1-5 A1-5 A1-5 A1-9 A1-3 A1-3 A1-3 A1-3A1-3A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-3 A1-5 A1-5 A1-5 A1-5 A1-5 A1-5 A1-5 A1-5 A1-5 A1-3 A1-3 A1-3 A1-3 A1-3A1-3 A1-3 A1-3 A1-3 A1-3 A1-5 A1-5 A1-5 A1-5 A1-5 A1-5 A1-5A1-5 A1-5 A1-9 A1-9 A1-9 A1-9 A1-9 A1-9 A1-9 A1-9 A1-9 A1-9 A1-9 A1-5 A1-7 A1-7 A1-7 A1-7 A1-7 A1-7 A1 A1-7 X10 A1-5 B2 A1-5 A1-5 A1-5 A1-5 B2 B2 B2B2 d d d d d dd A1-9 E2E a b a,b b bb b aa a a A1-7 a b a a a a 1 2 3 3a b b b b U1 U1 A1-3 A1-3 U1 A1-5 c c c c ccccc c c c c c c c c A1-5 U1U1 A1-3 U1 A1-3A1-3 U1 A1-5 U1 A1-5 U1 A1-5 LCP E10 A1-9 E10 A1-9 E10 A1-9 E10 A1-9 GENERAL ELECTRICAL LIGHTING NOTES A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS. B. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF THE ARCHITECT/ENGINEER. C. LOW VOLTAGE CABLES (LIGHTING CONTROLS) ABOVE ACCESSIBLE CEILINGS SHALL BE SUPPORTED USING J-HOOKS AT INTERVALS NOT TO EXCEED 48" OC, UNO. D. WHEN MULTIPLE OCCUPANCY SENSORS ARE LOCATED IN A SINGLE SPACE, CONNECT DEVICES TOGETHER SUCH THAT THE ACTIVATION OF ANY SENSOR TURNS ALL LIGHTS ON IN AN AREA. E. OCCUPANCY SENSORS INSTALLED IN CORRIDOR, CONFERENCE, DME (GARAGE) AND REST ROOM AREAS SHALL BE SET FOR A 20 MINUTE TIME OUT DELAY. OFFICES & BREAK ROOM SHALL BE SET FOR 15 MINUTE DELAY. F. PROVIDE AN UN-SWITCHED HOT TO ALL EGRESS LIGHTING UNITS, EMERGENCY BATTERY PACKS INTEGRAL TO FIXTURES & EXIT SIGNS LOCATED IN A SPECIFIC BUILDING AREA THAT IS SCOURED FROM THE SAME LIGHTING CIRCUIT WHICH SERVES LUMINARIES IN SPACE. WHEN CONTROL SOURCE IS FROM A CENTRAL LIGHTING CONTROL PANEL, HOT CONDUCTOR SHALL BE ROUTED AROUND THE CONTROLLING RELAY TO SERVE BATTERY PACK. G. CONFIGURE ALL OCCUPANCY SENSORS FOR MANUAL ON FUNCTION WITH THE EXCEPTION OF: BATHROOMS, HALLWAYS & VESTIBULES, WHICH SHALL BE AUTOMATIC ON. WHEN A SPACE IS ENTERED WITH MANUAL CONTROL THE LOCAL WALL SWITCH MUST BE ACTIVATED PRIOR TO LIGHTS ILLUMINATING. H. LIGHTING CONTROL METHODS VARY FROM INDIVIDUAL SPACES WITHIN PROJECT. SEE DETAILS ON e0.2 FOR OUTLINE APPLICATION OF CONTROLS. I. WHEN LIGHT SWITCHES ARE SHOWN LOCATED ON THE WALL THAT IS COMMON WITH THE END OF THE DOOR SWING INTO A SPACE. DO NOT LOCATE THE SWITCHES BEHIND THE DOOR, BUT RATHER A MINIMUM OF 6" FROM THE END OF THE SWING. VERIFY EXACT DOOR SWING PRIOR TO ROUGH-IN. J. ALL BUILDING MOUNTED EXTERIOR LIGHTING FIXTURES, WALL OF SOFFIT SHALL BE SERVED WITH CIRCUITRY CONSISTING OF #10 AWG CU CONDUCTORS IN ¾”C. PROVIDE DIMMING CONTROL CONDUCTORS FROM LCP TO ALL FIXTURES, WITH THE EXCEPTION OF THE E1 TYPE FIXTURES. ROUTE CIRCUIT THROUGH THE LIGHTING CONTROL PANEL PRIOR TO CONNECTING TO PANELBOARD LISTED. PROVIDE AN UN-SWITCHED HOT ROUTED AROUND RELAY FOR SERVING OF ALL FIXTURES EQUIPPED WITH AN EM BATTERY PACK. SEE e0.2 FOR ADDITIONAL DETAILS. K. SUBSCRIPT LOCATED NEXT TO/ IN THE BODY OF EACH LIGHT FIXTURE, WHEN PRESENT INDICATES THE RELAY GROUP IN LOCAL CONTROL PACK OR SWITCH THAT THE FIXTURES ARE ASSOCIATED WITH. MATCH SUBSCRIPTS FOR DESIRED SWITCHING CONTROL SCHEME. 315 North 25th Street, Suite 102 Billings, MT 59101 Phone: 406.656.6000 Project # 6804.001 COPYRIGHT © 2021 THESE DOCUMENTS, IN PART OR IN WHOLE, AND THE DESIGN THEY REPRESENT; ARE THE SOLE PROPERTY OF STUDIO 4 ARCHITECTS. THESE DOCUMENTS ARE INTENDED FOR THE PROJECT ON THE SITE INDICATED. ANY USE, REPRODUCTION, MODIFICATION, OR ADAPTATION WITHOUT THE EXPRESS WRITTEN CONSENT OF STUDIO 4 ARCHITECTS IS STRICTLY PROHIBITED. project: set: dates: sheet: PRE: CRS: CDS: REV: REV: PROJECT NO. DRAWN BY: CHECKED BY: 2-22-21 - - - 27 Shiloh Road Suite 8 Billings, MT 59106 ph: 406.656.1714 fx: 406.656.1715 web: studio4architects.com STUDIO ARCHITECTS 8-6-21 e2.1PRELIMINARY -NOT FOR CONSTRUCTIONTJ JK 2104Stillwater HospiceEvergreen DrivePLANBozeman, MtKEY NOTES:# 1/4" = 1'-0"1 ELECTRICAL LIGHTING PLAN –1ST FLOOR N 1 LOCATE RELAY PACK FOR SERVING OF LIGHT FIXTURES IN LOBBY AREA IN THE ACCESSIBLE CEILING SPACE ABOVE RECEPTION AREA. 2 LOCATE SWITCH IN HALF WALL AS, HIGH AS POSSIBLE IN THE FACE OF THE WALL. 3 UNDERCABINET LIGHTS SHALL BE CONNECTED TO SWITCHED ON/OFF LIGHTING CIRCUITRY IN ROOM FOR MASTER CONTROL.