Loading...
HomeMy WebLinkAbout015.1CILWRCalculation1 Madeline Good From:Griffin Nielsen <GNielsen@BOZEMAN.NET> Sent:Thursday, December 2, 2021 2:23 PM To:Madeline Good Cc:Rory Romey Subject:RE: Cash-in-Lieu of Water Rights Determination Attachments:ATT00001.txt; ATT00002.htm Hi Madeline, Thanks for following up, below is a preliminary CILWR determination for the Phase 1. Prior to finalized the determination I’ll need to verify the irrigation source and demand. If possible we encourage the use of an exempt well to supply the irrigation demand for projects as this reduces the CILWR for the applications and helps the City in our water conservation goals. If your client is willing to go this route I need a preliminary determination from the DNRC that a exempt well is allowed on the property and the well shown on the landscaping plans. If you reach out to the DNRC they typically will just response with an email providing the determination. As for the phased development of the project BMC 38.410.130 – Water Adequacy allows for compliance phase by phase so payment for Phase 2 can be deferred until it’s site plan ready for approval. Just for reference with the information provided I would apply the demand rate for the structure in Phase 2 (10,000gal/yr/1,000sf). Let me know if you have any questions. Thanks, City of Bozeman MT Griffin Nielsen, PE| Engineering Department 406.582.2280 gnielsen@bozeman.net 2 From: Madeline Good <mgood@alliedengineering.com> Sent: Tuesday, November 16, 2021 5:09 PM To: Griffin Nielsen <GNielsen@BOZEMAN.NET> Cc: Rory Romey <rromey@alliedengineering.com> Subject: RE: Cash-in-Lieu of Water Rights Determination CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Griffin, I was wondering if you had a chance to review the cash-in-lieu of water rights determination for Lot 3A of Amended McChesney Industrial Park Subdivision. Please let me know if you’d like me to send any additional information or documents. Thanks. Madeline Good, EI Staff Engineer Allied Engineering Services, Inc. 32 Discovery Drive, Bozeman, MT 59718 Tel: 406.582.0221 | Fax: 406.582.5770 Cell: 406.590.8361|Email: mgood@alliedengineering.com Web: www.alliedengineering.com From: Madeline Good Sent: Wednesday, October 13, 2021 12:08 PM To: gnielsen@bozeman.net Cc: Rory Romey <rromey@alliedengineering.com> Subject: Cash-in-Lieu of Water Rights Determination Hi Griffin, I am working on a site plan application for a commercial project in Bozeman and was hoping to get a cash-in-lieu of water rights determination. The project site is Lot 3A of Amended McChesney Industrial Park Subdivision and is located at the southwest corner of the intersection of Nikles Drive and Evergreen Drive. We’ve submitted a concept review application and have received comments back (application #21263). The proposed improvements will be completed in two phases. I’m not sure if the phased development makes a difference in the cash- in-lieu of water rights determination. Attached is the subdivision plat and current site plan for the proposed development. Please let me know if there is any other information I can send over. Thanks! Madeline Good, EI Staff Engineer Allied Engineering Services, Inc. 32 Discovery Drive, Bozeman, MT 59718 Tel: 406.582.0221 | Fax: 406.582.5770 Cell: 406.590.8361|Email: mgood@alliedengineering.com